← Back
Museum
Brooklyn Historical Society
128 PIERREPONT STREET · BIN 3002006
💬 Discuss this project
1878Year Built
5Stories
P7Building Class
C5-2AZoning
31,294 sfGross Floor Area
1Units
3 Open Violations ▸
Museum · 7,500 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Permit Issued — active, not yet Signed-off
BulkheadUnder Construction2p · 1 filing · 3 docs
Floor 51p · 1 filing · 7 docs
Floor 4Under Construction10p · 2 filings · 20 docs
Floor 3Under Construction14p · 9 filings · 20 docs
Floor 2Under Construction16p · 9 filings · 20 docs
Floor 1Under Construction17p · 8 filings · 20 docs
Cellar3p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DDC1209/13/2026
DEPT OF DESIGN CONSTRUCTION803/21/2026
BROOKLYN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAKHANI & JORDAN508/13/2026
NEWTEC ENGINEERING106/08/2026
TLZ ARCHITECTURE DPC904/02/2026
POLISE CONSULTING ENGINEERS DPC112/29/2022
MARBLE FAIRBANKS106/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING403/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
L J603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C. D. E. AIR-CONDITIONINGGeneral Contractor607/08/2026
BRENNAN OPERATING INCGeneral Contractor403/21/2026
VARSITY PLBG AND HTG INCPlumbing207/22/2026
DONNELLY MECHANICAL CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351208/13/2026
OBAID MIAN849106/08/2026
AMARACON TESTING & INSPEC5842112/29/2022
Building Lifecycle
All (122)Filed (18)Permit Issued (10)Signed Off (2)Violation (30)Inspection (2)Objection (45)Special Inspection (15)
08/27/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/27/2026
Special inspection requirement — Final
Asma Hashmi
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/27/2026
Special inspection requirement — Heating Systems
Asma Hashmi
08/27/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/13/2026
Filed — Alteration
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valves, dampers, BIMS system upgrade.
B00802156-P1
07/21/2026
Permit issued — Plumbing
B00802633-I1-PL
07/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/25/2026
Filed — Alteration
PROVIDE CHILLER MAKE UP WATER SERVICE METER, BACK FLOW PREVENTER-RPZVALVES AND ASSOCIATED PIPING IN COMPLIANCE WITH DEP REQUIREMENTS. PROVIDE CONDENSATE DRAIN PIPES, FLOOR DRAINS AND CONNECTION, BACKWATER VALVE AND ASSOCIATED PIPING.
B00802633-P1
06/24/2026
Permit issued — Suspended Scaffold
B01407313-I1-SC
06/08/2026
Filed — Alteration
Replacement of air conditioning units. No change in use egress and occupancy.
B01306577-I1
06/08/2026
Permit issued — Mechanical Systems
B01306577-I1-MS
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
06/08/2026
Special inspection requirement — Maintenance information
Obaid Mian
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
06/01/2026
Filed — Alteration
IRA to assist with Condition Assessment
B01407313-I1
05/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/05/2026
Objection raised — Other
04/02/2026
Filed — No Work
B01377977-I1
02/17/2026
Permit issued — Mechanical Systems
B00802156-I1-MS
02/12/2026
Permit issued — General Construction
B00802720-I1-GC
01/30/2026
Objection resolved — Addressed
12/17/2025
Objection raised — Other
12/10/2025
Filed — No Work
B01304847-I1
10/21/2025
Special inspection requirement — Mechanical Systems
Obaid Mian
10/21/2025
Special inspection requirement — Final
Obaid Mian
10/17/2025
Special inspection requirement — Public Assembly Emergency Lighting
CONNIE PISANI
07/09/2025
Permit issued — Plumbing
B00802633-I1-PL
03/14/2025
Permit issued — General Construction
B00802720-I1-GC
03/14/2025
Permit issued — Mechanical Systems
B00802156-I1-MS
02/20/2025
Objection raised — Fire_Protection
02/18/2025
Filed — No Work
B01182412-I1
11/27/2024
Filed — No Work
B01148074-I1
08/12/2024
Filed — No Work
B01081074-I1
04/22/2024
Filed — No Work
B01040066-I1
01/15/2024
Objection resolved — Addressed
01/12/2024
Objection raised — Other
01/11/2024
Filed — No Work
B00988989-I1
09/05/2023
Objection raised — Scope
09/05/2023
Objection resolved — Addressed
08/02/2023
Signed off — Alteration
Modification of ductwork on 1st floor
B00699826-I1
07/24/2023
Permit issued — Mechanical Systems
B00699826-I1-MS
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC07/21/2026
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC06/24/2026
DOB NOWMechanical SystemsSigned-offDONNELLY MECHANICAL CORP06/08/2026
DOB NOWMechanical SystemsPermit IssuedC. D. E. AIR-CONDITIONING02/17/2026
DOB NOWGeneral ConstructionPermit IssuedC. D. E. AIR-CONDITIONING02/12/2026
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC07/09/2025
DOB NOWGeneral ConstructionPermit IssuedC. D. E. AIR-CONDITIONING03/14/2025
DOB NOWMechanical SystemsPermit IssuedC. D. E. AIR-CONDITIONING03/14/2025
DOB NOWMechanical SystemsSigned-offBRENNAN OPERATING07/24/2023
DOB NOWGeneral ConstructionSigned-offBRENNAN OPERATING11/18/2022
BIS—ISSUEDATLAS RESTORATION CORP01/30/2014
BISPLISSUEDEASTERN PLBG & MECH CONTR11/08/2013
BIS—ISSUEDATLAS RESTORATION CORP02/06/2013
BISEQISSUEDMETROPOLITAN ENTERPRISES08/27/2012
BISPLISSUEDEASTERN PLBG & MECH CONTR08/22/2012
BIS—ISSUEDATLAS RESTORATION CORP08/09/2012
BIS—ISSUEDBROOKLYN HISTORICAL SOC01/23/2009
BIS—ISSUEDBROOKLYN HISTORICAL SOCIETY12/27/2007
BIS—ISSUEDBROOKLYN HISTORICAL SOCIETY11/30/2006
BIS—ISSUEDBROOKLYN HISTORICAL SOCIETY11/28/2005
BIS—ISSUEDBROOKLY HISTORICAL SOCIETY01/09/2004
BIS—ISSUEDYORK HUNTER SERVICES INC.05/13/2003
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.12/17/2002
BISSDISSUEDASPRO PLUMBING INC11/20/2002
BISPLISSUEDASPRO MECH CONTR.11/04/2002
BISPLISSUEDPOSITIVE PLBG & HTG10/16/2002
BISSPISSUEDASPRO PLUMBING INC10/07/2002
BISSDISSUEDASPRO PLUMBING INC10/26/2001
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.10/25/2001
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.10/25/2001
BIS—ISSUEDYORK HUNTER SERVICES INC.07/18/2001
BIS—ISSUEDYORK HUNTER SERVICES INC.07/26/2000
BISEQRE-ISSUEDYORK SCAFFOLD EQUIPMENT CORP.06/29/2000
BISEQRE-ISSUEDYORK SCAFFOLD EQUIPMENT CORP.06/29/2000
BISPLISSUEDASPRO MECH CONTR.01/18/2000
BIS—ISSUEDYORK HUNTER SERVICES INC.12/14/1999
2 projects · most recent 08/13/2026
Heating and Air Conditioning Systems Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026Permit IssuedC. D. E. AIR-CONDITIONINGAir Conditioning Systems, Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Multistack MSA030KNAB 112 tons ×4
__Junk__ AC10AW4D151T3 120 tons ×4
Carrier FT5ANBD60 5 tons · Condensing Unit ×1
Tsi ×8
Heat / Cool
Armstrong Air WS-1007-200-2-CSSSSNN-20 1,500,000 BTU · Heat Exchanger ×2
Ventilation
Carrier 39MN06W02EL 2,200 CFM · Ahu ×1
39MN50W02EL 21,650 CFM · Ahu ×1
Refrigeration
Tsi ×4
06/08/2026Signed-offDONNELLY MECHANICAL CORPHeating and Air Conditioning Systems
Heat / Cool
Fujitsu ARUH96TLAV2 2,900 CFM · Vrf Outdoor ×3
AOUA192ULBV5 192,000 BTU · Vrf Outdoor ×1
AOUA96ULBV5 96,000 BTU · Vrf Outdoor ×1
Mitsubishi Electric LGH-F1200RVX2-E 1,200 CFM · Erv ×1
1 project · most recent 06/25/2026
Water/Sanitary
FiledStatusContractorScope
06/25/2026Signed-offVARSITY PLBG AND HTG INCWater/Sanitary
1 project · most recent 03/18/2025
General Wiring
FiledStatusContractorScope
03/18/2025CompleteMILAD CONTRACTING CORP.General Wiring
1 project · most recent 06/01/2026
FiledStatusContractorScope
06/01/2026Permit IssuedSKYLINE ACCESS LLC—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/27/2026Post-installed AnchorsAsma Hashmispecial
08/27/2026FinalAsma Hashmiprogress
08/27/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/27/2026Heating SystemsAsma Hashmispecial
08/27/2026Mechanical SystemsAsma Hashmispecial
06/08/2026HVAC-R and service water heating system controlsObaid Mianenergy_progress
06/08/2026Maintenance informationObaid Mianenergy_progress
06/08/2026HVAC-R and service water piping design and insulationObaid Mianenergy_progress
06/08/2026HVAC-R and service water heating equipmentObaid Mianenergy_progress
10/21/2025Mechanical SystemsObaid Mianspecial
10/21/2025FinalObaid Mianprogress
10/17/2025Public Assembly Emergency LightingCONNIE PISANIprogress
03/16/2022FinalCONNIE PISANIprogress
03/16/2022Mechanical SystemsCONNIE PISANIspecial
02/22/2022FinalScott Marbleprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Center for Brooklyn HistoryEducationSub-basement, Basement, Ground, Floors 1–3
Project B01377977 No Work · TA Certificate of Operation Issued · 04/02/2026
Project B01148074 No Work · Objections · 11/27/2024
Project B01081074 No Work · TA Certificate of Operation Issued · 08/12/2024
Project B01040066 No Work · TA Certificate of Operation Issued · 04/22/2024
Project B00699826 Alteration · LOC Issued · 12/29/2022
Project B00797585 No Work · TA Certificate of Operation Issued · 08/22/2022
Project B00684954 Alteration · LOC Issued · 06/14/2022
Project B00701802 No Work · TA Certificate of Operation Issued · 03/18/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 180 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch9
08/29/2026B00684954-I1Request digital key ↗
08/27/2026B00802720-I1Request digital key ↗
08/27/2026B00802633-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly8
08/30/2026B00701802-I1Request digital key ↗
08/28/2026B00797585-I1Request digital key ↗
08/26/2026B00988989-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/14/2026B01304847-I1Request digital key ↗
▸Applications & Permits25
▸DOB NOWLPC Approval/Permit8
08/29/2026B00684954-I1Open ↗
08/27/2026B00802633-P1Open ↗
08/27/2026B00802156-P1Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION7
02/01/2014320292571Open ↗
11/23/2013320292571Open ↗
02/07/2013320292571Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
06/03/2014320292571Open ↗
06/02/2014320292571Open ↗
09/05/2012320578576Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/21/2017320786119Open ↗
06/21/2017320786119Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/22/2013320292571Open ↗
▸BISPLACE OF ASSEMBLY1
07/24/2013320786119Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/16/2017320292571Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/29/2026B00684954-I1Open ↗
08/28/2026B00797585-I1Open ↗
08/28/2026B00699826-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
08/11/2017320786119Open ↗
08/11/2017320786119Open ↗
08/09/2017320786119Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01306577-I1Open ↗
09/01/2026B01306577-I1Open ↗
09/01/2026B01306577-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01306577-I1Open ↗
09/01/2026B00802156-I1Open ↗
09/01/2026B00802156-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/04/2012320548378Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/04/2012320548378Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE3
12/27/2013320292571Open ↗
12/26/2013320292571Open ↗
11/07/2012320292571Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
05/01/2014320578576Open ↗
02/14/2014320578576Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
12/27/2013320292571Open ↗
▸BISSCHEDULE B - PLUMBING1
04/08/2011320292571Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/02/2014320292571Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00684954-I1Open ↗
08/16/2026B01306577-I1Open ↗
08/14/2026B00699826-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026B00802720-I1Open ↗
08/27/2026B00802156-I1Open ↗
08/13/2026B00802633-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/08/2011320292571Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/16/2017320292571Open ↗
08/16/2017320292571Open ↗
05/20/2014320292571Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/16/2017320292571Open ↗
05/20/2014320292571Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/08/2011320292571Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/02/2014320292571Open ↗
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/29/2026B00684954-I1Open ↗
08/28/2026B00797585-I1Open ↗
08/27/2026B00802633-P1Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
08/16/2017320292571Open ↗
08/11/2017320786119Open ↗
08/09/2017320786119Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/16/2017320292571Open ↗
08/11/2017320786119Open ↗
08/09/2017320786119Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
07/24/2013320786119Open ↗
09/05/2012320578576Open ↗
09/04/2012320548378Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL4
08/13/2014320292571Open ↗
05/01/2014320578576Open ↗
09/05/2012320578576Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
04/08/2011320292571Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/16/2017320292571Open ↗
05/01/2014320578576Open ↗
04/15/2014320578576Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
09/05/2012320578576Open ↗
09/04/2012320548378Open ↗
04/08/2011320292571Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
09/10/2012320548378Open ↗
▸Other Documents13
▸DOB NOWProof of Historic Building7
08/29/2026B00684954-I1Open ↗
08/27/2026B00802633-P1Open ↗
08/27/2026B00802156-P1Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/03/2017320786119Open ↗
03/03/2017320786119Open ↗
▸BISPLOT DIAGRAM1
04/08/2011320292571Open ↗
▸DOB NOWIRA Certification1
08/16/2026B01407313-I1Open ↗
▸DOB NOWAlternate Plan 21
08/14/2026B01304847-I1Open ↗
▸DOB NOWAlternate Plan 31
08/14/2026B01304847-I1Open ↗