← Back
STATEN ISLAND
128 SPARKILL AVENUE
STATEN ISLAND · BIN 5177273
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
14 CASCADE STREET603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYRISE GENERAL CONSTRUCTGeneral Contractor208/26/2026
Building Lifecycle
All (35)Filed (2)Permit Issued (2)Objection (1)Special Inspection (30)
07/20/2026
Objection raised — Scope
07/10/2026
Permit issued — Construction Fence
S01288744-I1-FN
06/26/2026
Filed — New Building
PROPOSED DETACHED ONE FAMILY RESIDENCE WITH ACCESSORY BUILT-IN FOUR CAR GARAGE.
S01381476-I1
06/26/2026
Special inspection requirement — Ventilation and air distribution system
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/26/2026
Special inspection requirement — Structural Steel - Details
06/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/26/2026
Special inspection requirement — Structural Steel - Welding
06/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/26/2026
Special inspection requirement — Protection of exposed foundation insulation
06/26/2026
Special inspection requirement — Permanent certificate
06/26/2026
Special inspection requirement — Concrete - Cast-In-Place
06/26/2026
Special inspection requirement — Wood – Prefabricated I-Joists
06/26/2026
Special inspection requirement — Energy Code Compliance Inspections
06/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/26/2026
Special inspection requirement — Structural Wood Frame
06/26/2026
Special inspection requirement — Fenestration air leakage
06/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/26/2026
Special inspection requirement — Lighting in dwelling units
06/26/2026
Special inspection requirement — Air barrier — testing
06/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/26/2026
Special inspection requirement — Air barrier - visual inspection
06/26/2026
Special inspection requirement — Fenestration areas
06/26/2026
Special inspection requirement — Maintenance information
06/26/2026
Special inspection requirement — Insulation placement and R values
06/26/2026
Special inspection requirement — Air barrier continuity plan testing
06/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/26/2026
Special inspection requirement — Interior lighting power
06/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/01/2026
Special inspection requirement — Mechanical Systems
04/01/2026
Special inspection requirement — Footing and Foundation
04/01/2026
Special inspection requirement — Final
10/03/2025
Permit issued — Construction Fence
S01288744-I1-FN
10/01/2025
Filed — Alteration
FENCE APPLICATION FILED IN CONJUNCTION WITH FUTURE NB APPLICATIONS FOR 128 SPARKILL AVENUE AND 59 UPTON STREET.
S01288744-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSKYRISE GENERAL CONSTRUCT07/10/2026
DOB NOWConstruction FencePermit IssuedSKYRISE GENERAL CONSTRUCT10/03/2025
1 project · most recent 06/26/2026
Concrete Wood
FiledStatusContractorScope
06/26/2026——Concrete, Wood
1 project · most recent 10/01/2025
Fence
FiledStatusContractorScope
10/01/2025Permit IssuedSKYRISE GENERAL CONSTRUCTFence
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/26/2026Ventilation and air distribution system—energy_progress
06/26/2026Fire-Resistant Penetrations and Joints—special
06/26/2026Structural Steel - Details—special
06/26/2026Structural Steel - High Strength Bolting—special
06/26/2026Structural Steel - Welding—special
06/26/2026Subsurface Investigations (Borings/Test Pits)—special
06/26/2026Protection of exposed foundation insulation—energy_progress
06/26/2026Permanent certificate—energy_progress
06/26/2026Concrete - Cast-In-Place—special
06/26/2026Wood – Prefabricated I-Joists—special
06/26/2026Energy Code Compliance Inspections—progress
06/26/2026Fire-Resistance Rated Construction—progress
06/26/2026Structural Wood Frame—progress
06/26/2026Fenestration air leakage—energy_progress
06/26/2026HVAC-R and service water heating system controls—energy_progress
06/26/2026Lighting in dwelling units—energy_progress
06/26/2026Air barrier — testing —energy_progress
06/26/2026Fenestration and door U-factor and product ratings—energy_progress
06/26/2026HVAC-R and service water piping design and insulation—energy_progress
06/26/2026Air barrier - visual inspection—energy_progress
06/26/2026Fenestration areas—energy_progress
06/26/2026Maintenance information—energy_progress
06/26/2026Insulation placement and R values—energy_progress
06/26/2026Air barrier continuity plan testing—energy_progress
06/26/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 30.
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026S01288744-I1Request digital key ↗
08/15/2026S01381476-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/12/2025520471784Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026S01381476-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026S01381476-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026S01288744-I1Open ↗
08/16/2026S01381476-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026S01381476-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026S01381476-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026S01381476-I1Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026S01381476-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/12/2025520471784Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026S01381476-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026S01381476-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026S01381476-I1Open ↗