← Back
BuildNYC
Elevator apt, semi-fireproof without stores
128 WEST 167TH STREET
BRONX · BIN 2130975
💬 Discuss this project
2022Year Built
7Stories
D1Building Class
R7-1Zoning
21,710 sfGross Floor Area
33Units
Rent Stabilized5 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 128W 167 LLC · 5,000 sf lot · 4.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTemporary roof protection installation61p · 2 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 7Unit 7A, Unit 7B, Unit 7C +269p · 2 filings · 20 docs
Floor 6Unit 6A, Unit 6B, Unit 6C +270p · 2 filings · 20 docs
Floor 5Temporary pipe scaffold installation89p · 2 filings · 20 docs
Floor 4Temporary pipe scaffold installation89p · 2 filings · 20 docs
Floor 3Temporary pipe scaffold installation89p · 2 filings · 20 docs
Floor 2Temporary pipe scaffold installation89p · 2 filings · 20 docs
Floor 1Unit 1A, Unit 1B, Unit 1C97p · 3 filings · 20 docs
Site & exteriorTemporary construction fence installation76p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Skyrock NYC2507/08/2026
128W 167 LLC203/22/2026
TML Housing103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/21/2021$650K—TML HOUSING LLC → 122W LLC— not available
06/28/2016$380K—Private party → TML HOUSING LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Builders Services1203/21/2026
AE Design Solution1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold1007/08/2026
B Contractors GroupGeneral Contractor707/08/2026
B Contractors GroupScaffold407/08/2026
Tuxedo Electrical ContractingElectrical203/21/2026
Superb Construction ManagementGeneral Contractor103/21/2026
B Contractors Groupspecialty_contractor107/08/2026
Mpi PlumbingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394803/05/2025
HRF Services5616112/15/2021
Building Lifecycle
09/08/2026
Elevator Category 1 inspection report filed
04/17/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT BATHTUB IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st…
HPD violation · closed
02/11/2026
§ 27-2033 ADM code provide ready access to buildings heating system door locked at boiler room
HPD violation · closed
02/11/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD violation · closed
02/11/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD violation · closed
142 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offB Contractors Group11/03/2023
DOB NOWCurb CutSigned-offB Contractors Group10/27/2023
DOB NOWGeneral ConstructionPermit IssuedB Contractors Group07/18/2023
DOB NOWSprinklersSigned-offAmb Mechanical05/24/2023
DOB NOWConstruction FenceSigned-offB Contractors Group02/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems10/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems10/28/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems10/28/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems10/27/2022
DOB NOWPlumbingSigned-offYG Services09/13/2022
DOB NOWGeneral ConstructionPermit IssuedB Contractors Group08/01/2022
DOB NOWEarth WorkPermit IssuedB Contractors Group05/19/2022
DOB NOWStructuralSigned-offB Contractors Group05/19/2022
DOB NOWConstruction FenceSigned-offB Contractors Group03/02/2022
BIS—ISSUEDSuperb Construction Management03/23/2022
1 project · most recent 03/05/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/05/2025Signed-offMpi PlumbingGas, Storm, Water/Sanitary
4 projects · most recent 06/26/2024
General Wiring
FiledStatusContractorScope
06/26/2024CancelledTuxedo Electrical Contracting—
06/18/2024CompleteTuxedo Electrical Contracting—
09/20/2022CompleteHivolts ElectricalGeneral Wiring
06/12/2022CompleteHivolts Electrical—
1 project · most recent 03/05/2025
Concrete
FiledStatusContractorScope
03/05/2025Signed-offB Contractors GroupConcrete
1 project · most recent 03/05/2025
Earthwork
FiledStatusContractorScope
03/05/2025Signed-offB Contractors GroupEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/09/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
10/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/17/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/07/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
03/06/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/06/2025Energy Code Compliance InspectionsPaul Raymondprogress
03/06/2025Fire-Resistance Rated ConstructionPaul Raymondprogress
03/06/2025Interior lighting powerPaul Raymondenergy_progress
03/06/2025Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
03/06/2025Maintenance informationPaul Raymondenergy_progress
03/06/2025MeteringPaul Raymondenergy_progress
03/06/2025Insulation placement and R valuesPaul Raymondenergy_progress
03/06/2025Air barrier - visual inspectionPaul Raymondenergy_progress
03/06/2025Fenestration areasPaul Raymondenergy_progress
03/06/2025Fenestration air leakagePaul Raymondenergy_progress
03/05/2025MeteringPaul Raymondenergy_progress
03/05/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/05/2025Energy Code Compliance InspectionsPaul Raymondprogress
03/05/2025Fire-Resistance Rated ConstructionPaul Raymondprogress
03/05/2025Maintenance informationPaul Raymondenergy_progress
03/05/2025Fenestration areasPaul Raymondenergy_progress
03/05/2025Insulation placement and R valuesPaul Raymondenergy_progress
03/05/2025Air barrier - visual inspectionPaul Raymondenergy_progress
03/05/2025Fenestration air leakagePaul Raymondenergy_progress
03/05/2025Interior lighting powerPaul Raymondenergy_progress
03/05/2025Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
09/18/2024Maintenance informationPaul Raymondenergy_progress
09/18/2024HVAC-R and service water heating equipmentPaul Raymondenergy_progress
09/18/2024HVAC-R and service water heating system controlsPaul Raymondenergy_progress
Latest 25 of 58.
202 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account