← Back
BuildNYC
Gas or electric utility
128 WEST END AVENUE
MANHATTAN · BIN 1030342
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-4Zoning
0 sfGross Floor Area
0Units
0 Active Violations
Gas or electric utility · Owner of record: Consolidated Edison Co of N.Y · 59,296 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofConsolidated Edison14p · 3 filings · 16 docs
Floor 3Consolidated Edison1p · 1 filing · 11 docs
Floor 2Consolidated Edison1p · 1 filing · 11 docs
Floor 1
Sub-BasementConsolidated Edison1 filing · 12 docs
Site & exteriorConsolidated Edison3p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Consolidated Edison Company of New York14904/09/2026
Con Edison of Company1103/21/2026
ABC203/21/2026
Consolidation Edison Co203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Superstructures Engineering + Architects103/21/2026
J.A.M. Associates403/21/2026
Taccetta Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PJP InstallersScaffold203/21/2026
Acme IndustrialGeneral Contractor203/21/2026
Con Edison CompanyGeneral Contractor203/21/2026
Monpat ConstructionGeneral Contractor203/21/2026
Richard Decastro & Sons EElectrical103/21/2026
CarrierGeneral Contractor104/09/2026
Citi-Wide ElectricElectrical103/21/2026
Consolidated Edison CoElectrical103/21/2026
Alliance Elevator CompanyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sterling Engineering Service1012105/20/2025
Tectonic Engineering Cons106201/31/2022
Catalpa Special Inspectio2004211/29/2021
Building Lifecycle
All (66)Filed (7)Permit Issued (5)Signed Off (5)Violation (28)Special Inspection (21)
05/01/2026
Signed off — Alteration
REPLACE EXISTING AIR HANDLER AND CONDENSING UNITS. CONNECTING TO EXISTING DUCTWORK AND SUPPORTED BY EXISTING STEEL DUNNAGE.
M01204361-I1
12/19/2025
Signed off — Alteration
M01044769-I1
06/06/2025
Permit issued — Mechanical Systems
M01204361-I1-MS
05/20/2025
Filed — Alteration
REPLACE EXISTING AIR HANDLER AND CONDENSING UNITS. CONNECTING TO EXISTING DUCTWORK AND SUPPORTED BY EXISTING STEEL DUNNAGE.
M01204361-I1
04/03/2025
Signed off — Alteration
M01067968-I1
04/02/2025
Special inspection requirement — Shutoff dampers
THomas DeLorenzo
04/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
THomas DeLorenzo
04/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
THomas DeLorenzo
04/02/2025
Special inspection requirement — Mechanical Systems
THomas DeLorenzo
04/02/2025
Special inspection requirement — Final
THomas DeLorenzo
04/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
THomas DeLorenzo
04/02/2025
Special inspection requirement — Maintenance information
THomas DeLorenzo
07/18/2024
Permit issued — General Construction
M01044769-I1-GC
07/17/2024
Filed — Alteration
M01067968-I1
07/17/2024
Permit issued — Sidewalk Shed
M01067968-I1-SH
06/06/2024
Filed — Alteration
M01044769-I1
08/17/2022
Signed off — Alteration
REPLACE EXISITNG STEAM PIPE WITH 2' DIAMETER BRASS PIPE AS PER PLAN.NO CHANGE TO EGRESS OCCUPANCY OR USE INVOLVED IN THIS APPLICATION
M00581237-I1
01/31/2022
Filed — Alteration
REPLACE EXISITNG STEAM PIPE WITH 2' DIAMETER BRASS PIPE AS PER PLAN.NO CHANGE TO EGRESS OCCUPANCY OR USE INVOLVED IN THIS APPLICATION
M00581237-P1
01/31/2022
Special inspection requirement — Final
EDUARDO LIEVANO
01/31/2022
Special inspection requirement — Post-installed Anchors
EDUARDO LIEVANO
01/31/2022
Special inspection requirement — Mechanical Systems
EDUARDO LIEVANO
01/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARDO LIEVANO
01/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/17/2021
Signed off — Alteration
Replace existing AC units on third floor roof. New units to be installed on existing dunnage.
M00487990-I1
12/17/2021
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
12/17/2021
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/17/2021
Special inspection requirement — Final
GEORGE GHEBRYAL
12/01/2021
Special inspection requirement — Final
Sanford Berger
12/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
Sanford Berger
12/01/2021
Special inspection requirement — Mechanical Systems
Sanford Berger
11/29/2021
Filed — Alteration
Replace existing AC units on third floor roof. New units to be installed on existing dunnage.
M00487990-P1
11/18/2021
Special inspection requirement — Mechanical Systems
Sanford Berger
11/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
Sanford Berger
11/18/2021
Special inspection requirement — Final
Sanford Berger
10/27/2021
Permit issued — General Construction
M00581237-I1-GC-CX
09/23/2021
Filed — Alteration
REPLACE EXISITNG STEAM PIPE WITH 2' DIAMETER BRASS PIPE AS PER PLAN.NO CHANGE TO EGRESS OCCUPANCY OR USE INVOLVED IN THIS APPLICATION
M00581237-I1
05/26/2021
Permit issued — Mechanical Systems
M00487990-I1-MS
05/18/2021
Filed — Alteration
Replace existing AC units on third floor roof. New units to be installed on existing dunnage.
M00487990-I1
01/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2019
Violation issued (ECB, closed)
Site Safety
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/29/2018
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/29/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/29/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/28/2017
Violation issued (ECB, closed)
Construction
03/28/2017
Violation issued (ECB, closed)
Construction
05/08/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/08/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/05/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/05/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/10/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/30/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/30/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/28/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/28/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/29/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/29/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/10/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/10/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCarrier06/06/2025
DOB NOWGeneral ConstructionSigned-offMonpat Construction07/18/2024
DOB NOWSidewalk ShedSigned-offPJP Installers07/17/2024
DOB NOWGeneral ConstructionSigned-offCon Edison Company10/27/2021
DOB NOWMechanical SystemsSigned-offAcme Industrial05/26/2021
BISFPISSUEDGrinnell08/03/2020
BISFPISSUEDGrinnell06/26/2020
BISOTISSUEDO'Leary Construction05/20/2020
BISOTISSUEDO'Leary Construction05/20/2020
BISOTISSUEDO'Leary Construction05/20/2020
BISOTISSUEDO'Leary Construction05/20/2020
BISOTISSUEDO'Leary Construction05/20/2020
BISMHISSUEDD'Onofrio General Contractors07/10/2019
BISOTISSUEDD'Onofrio General Contractors07/10/2019
BISOTISSUEDO'Leary Construction05/16/2019
BISOTISSUEDO'Leary Construction05/16/2019
BISOTISSUEDO'Leary Construction05/16/2019
BISOTISSUEDO'Leary Construction05/16/2019
BISOTISSUEDO'Leary Construction05/16/2019
BISOTRE-ISSUEDO'Leary Construction01/16/2019
BISOTISSUEDO'Leary Construction01/16/2019
BISOTISSUEDO'Leary Construction01/11/2019
BISOTISSUEDO'Leary Construction01/10/2019
BISOTISSUEDO'Leary Construction01/10/2019
BISFPISSUEDGrinnell01/02/2019
BISFPISSUEDGrinnell01/02/2019
BISMHISSUEDD'Onofrio General Contractors07/02/2018
BISOTISSUEDD'Onofrio General Contractors07/02/2018
BISSPISSUEDNew York Plumbing-Heating-Cool02/28/2018
BISFPISSUEDGrinnell11/29/2017
BISMHISSUEDCon Edison Company11/14/2017
BISFPISSUEDGrinnell10/23/2017
BISSPISSUEDNew York Plumbing-Heating-Cool10/18/2017
BISMHISSUEDCon Edison Company09/21/2017
BISMHISSUEDGianfia07/21/2017
BISOTISSUEDGianfia07/21/2017
BISOTISSUEDGianfia07/21/2017
BISOTISSUEDD'Onofrio General Contractors06/29/2017
BISMHISSUEDD'Onofrio General Contractors06/29/2017
BISFPISSUEDGrinnell04/20/2017
+ 15 more permits on file
9 projects · most recent 08/09/2024
FiledStatusContractorScope
08/09/2024CompleteConsolidated Edison Co—
07/07/2020CompleteConsolidated Edison Co—
01/08/2020CompleteConsolidated Edison Co—
08/28/2019CompleteConsolidated Edison Co—
02/07/2019CompleteConsolidated Edison Co—
09/17/2018CompleteConsolidated Edison Co—
07/24/2018CompleteConsolidated Edison Co—
06/06/2018CompleteConsolidated Edison Co—
01/22/2018CompleteConsolidated Edison Co—
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/02/2025Shutoff dampersTHomas DeLorenzoenergy_progress
04/02/2025HVAC-R and service water piping design and insulationTHomas DeLorenzoenergy_progress
04/02/2025HVAC-R and service water heating system controlsTHomas DeLorenzoenergy_progress
04/02/2025Mechanical SystemsTHomas DeLorenzospecial
04/02/2025FinalTHomas DeLorenzoprogress
04/02/2025HVAC-R and service water heating equipmentTHomas DeLorenzoenergy_progress
04/02/2025Maintenance informationTHomas DeLorenzoenergy_progress
01/31/2022FinalEDUARDO LIEVANOprogress
01/31/2022Post-installed AnchorsEDUARDO LIEVANOspecial
01/31/2022Mechanical SystemsEDUARDO LIEVANOspecial
01/31/2022Fire-Resistant Penetrations and JointsEDUARDO LIEVANOspecial
01/14/2022Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/17/2021Mechanical SystemsGEORGE GHEBRYALspecial
12/17/2021Post-installed AnchorsGEORGE GHEBRYALspecial
12/17/2021FinalGEORGE GHEBRYALprogress
12/01/2021FinalSanford Bergerprogress
12/01/2021HVAC-R and service water heating equipmentSanford Bergerenergy_progress
12/01/2021Mechanical SystemsSanford Bergerspecial
11/18/2021Mechanical SystemsSanford Bergerspecial
11/18/2021HVAC-R and service water heating equipmentSanford Bergerenergy_progress
11/18/2021FinalSanford Bergerprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Consolidated EdisonOfficeEntire building
Project M01204361 Alteration · LOC Issued · 05/20/2025
Project M01044769 Alteration · LOC Issued · 06/06/2024
Project M00581237 Alteration · LOC Issued · 09/23/2021
Project M00487990 Alteration · LOC Issued · 05/18/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 687 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00487990-I1Request digital key ↗
09/03/2026M00487990-P1Request digital key ↗
09/03/2026M00581237-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits184
▸BISWORK PERMIT APPLICATION98
06/26/2020122538138Open ↗
07/10/2019121852334Open ↗
07/10/2019121852334Open ↗
Showing 3 of 98 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION84
09/23/2021122120365Open ↗
03/22/2021122744673Open ↗
01/13/2020122562235Open ↗
Showing 3 of 84 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/12/2018140726481Open ↗
02/12/2018140726481Open ↗
▸Seals & Professional Certifications163
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION83
07/15/2020122562235Open ↗
07/15/2020122562235Open ↗
01/10/2019140750033Open ↗
Showing 3 of 83 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
01/13/2020122562235Open ↗
01/10/2020122562235Open ↗
03/19/2018123214896Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
03/19/2018123214896Open ↗
02/07/2018123205646Open ↗
10/18/2017123289869Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M00581237-P1Open ↗
08/29/2026M00487990-I1Open ↗
08/29/2026M00487990-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M00581237-P1Open ↗
09/02/2026M00581237-P1Open ↗
09/02/2026M00581237-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00487990-I1Open ↗
09/03/2026M00487990-P1Open ↗
08/26/2026M01067968-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
04/12/2018140750033Open ↗
01/31/2018140726481Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment41
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
07/18/2024121905858Open ↗
03/02/2022121850746Open ↗
06/19/2018121131426Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
07/15/2020122562235Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/07/2018123205646Open ↗
10/18/2017123289869Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
07/15/2020122562235Open ↗
07/10/2020122562235Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos46
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
08/03/2018123530214Open ↗
08/03/2018123530214Open ↗
06/06/2018123587877Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00487990-P1Open ↗
09/03/2026M00487990-I1Open ↗
08/13/2026M00581237-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS INSPECTION REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
12/17/2018140726481Open ↗
12/17/2018140726481Open ↗
12/17/2018123530214Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/26/2021122120365Open ↗
07/10/2020122562235Open ↗
04/12/2018140750033Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/26/2021122120365Open ↗
07/10/2020122562235Open ↗
10/22/2018122704154Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00487990-I1Open ↗
▸Inspections & Test Reports30
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER10
01/16/2019123214896Open ↗
01/10/2019140750033Open ↗
12/17/2018140726481Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/04/2024121506094Open ↗
03/26/2021122120365Open ↗
03/26/2021122120365Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
01/16/2019123587877Open ↗
01/16/2019123214896Open ↗
01/14/2019140726481Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
12/17/2018140750033Open ↗
06/14/2018140750033Open ↗
Showing 2 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
02/07/2018123205646Open ↗
10/18/2017123289869Open ↗
10/18/2017123289869Open ↗
▸BISSOIL REPORT1
06/12/2018140750033Open ↗
▸Approvals, Objections & Sign-offs41
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
01/27/2025121905858Open ↗
03/10/2022121850746Open ↗
09/24/2021122120365Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER2
06/26/2020122538138Open ↗
09/26/2017120591779Open ↗
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT58
03/09/2022121850746Open ↗
03/29/2021122120365Open ↗
07/10/2020122562235Open ↗
Showing 3 of 58 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/27/2024121905858Open ↗
▸Filing & Intake Forms70
▸BISEFILING COVER SHEET37
10/05/2018122744673Open ↗
10/03/2018122744664Open ↗
08/03/2018123530214Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION18
12/17/2018140726481Open ↗
12/17/2018123530214Open ↗
12/17/2018123587877Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM12
06/26/2020122538138Open ↗
01/10/2020122562235Open ↗
05/22/2019120591779Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/12/2018140750033Open ↗
01/31/2018140726481Open ↗
Showing 2 of 3 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/12/2018140750033Open ↗