← Back
One story retail building
128 WEST FORDHAM ROAD
BRONX · BIN 2014948
💬 Discuss this project
1920Year Built
1Stories
K1Building Class
R7-1Zoning
10,000 sfGross Floor Area
4Units
2 Open Violations 0 unresolved · 2 paperwork only ▸
One story retail building · Owner of record: MAIRE MGMT INC · 11,830 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 20 docs
Floor 113p · 3 filings · 20 docs
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MAIRE MANAGEMENT307/29/2026
OWNER OF 130-132 WEST FOR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC1207/30/2026
LEON SKVIRSKY PE107/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKNK WASTE REMOVAL INCGeneral Contractor303/21/2026
HYDRAULICS MECHANICAL INCPlumbing207/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
PAUL SIGNSScaffold107/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WELLDONE INSPECTION INC.8628312/18/2024
CEYLAN DESIGN AND CONSULT8422110/08/2023
Building Lifecycle
All (123)Filed (13)Permit Issued (4)Signed Off (1)Violation (11)Inspection (15)Objection (49)Special Inspection (30)
08/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
07/30/2026
Filed — Alteration
PLUMBING WORK TYPE IN FILED TO REGISTER EXISTING GAS EQUIPMENT, AS PER PLAN SUBMITTED.
X01068430-P2
07/28/2026
Permit issued — Sign
X01425246-I1-SG
07/23/2026
Filed — Alteration
X01425246-I1
07/01/2026
Special inspection requirement — Final
LEON SKVIRSKY
06/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2025
Permit issued — Plumbing
X01068430-I1-PL
03/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2025
Signed off — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH LAA # X00971767-I1 (SPRINKLER HEAD RELOCATION) AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00944959-I1
01/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/30/2024
Filed — Alteration
PLUMBING WORK TYPE IN FILED TO REGISTER EXISTING GAS EQUIPMENT, AS PER PLAN SUBMITTED.
X01068430-P1
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Final
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Shutoff dampers
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Maintenance information
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Fenestration air leakage
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Fenestration areas
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Lighting controls
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Air barrier - visual inspection
SERDAR CEYLAN
12/20/2024
Special inspection requirement — Duct leakage testing, insulation and design
QIUFAN JIANG
12/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SERDAR CEYLAN
12/18/2024
Filed — Alteration CO
APPLICATION FILED TO PROPOSE A LAUNDRY ESTABLISHMENT IN EXISTING RETAIL SPACE AS PER PLANS SUBMITTED. THE APPLICATION IS ALSO FILED TO OBTAIN A CERTIFICATE OF OCCUPANCY.
X00965060-P2
12/18/2024
Special inspection requirement — Fenestration air leakage
SERDAR CEYLAN
12/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
12/18/2024
Special inspection requirement — Lighting controls
SERDAR CEYLAN
12/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SERDAR CEYLAN
12/18/2024
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
12/18/2024
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
12/18/2024
Special inspection requirement — Maintenance information
SERDAR CEYLAN
12/18/2024
Special inspection requirement — Fenestration areas
SERDAR CEYLAN
12/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
12/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2024
Filed — Alteration
PLUMBING WORK TYPE IN FILED TO REGISTER EXISTING GAS EQUIPMENT, AS PER PLAN SUBMITTED.
X01068430-I1
10/04/2024
Filed — Alteration
X01068549-I1
09/03/2024
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH LAA # X00971767-I1 (SPRINKLER HEAD RELOCATION) AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00944959-P3
08/06/2024
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH LAA # X00971767-I1 (SPRINKLER HEAD RELOCATION) AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00944959-P2
08/06/2024
Filed — Alteration CO
APPLICATION FILED TO PROPOSE A LAUNDRY ESTABLISHMENT IN EXISTING RETAIL SPACE AS PER PLANS SUBMITTED. THE APPLICATION IS ALSO FILED TO OBTAIN A CERTIFICATE OF OCCUPANCY.
X00965060-P1
07/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/03/2024
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH LAA # X00971767-I1 (SPRINKLER HEAD RELOCATION) AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00944959-P1
03/07/2024
Permit issued — Plumbing
X00944959-I1-PL
02/08/2024
Permit issued — General Construction
X00965060-I1-GC-CX
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPAUL SIGNS, INC07/28/2026
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP12/18/2025
DOB NOWPlumbingSigned-offHYDRAULICS MECHANICAL INC03/07/2024
DOB NOWGeneral ConstructionPermit IssuedMKNK WASTE REMOVAL INC02/08/2024
BISBLISSUEDWASOFF PLBG. & UTL.CO INC08/20/2019
BISFPISSUEDMASTER FIRE SYSTEMS, INC05/15/2018
BISOTISSUEDFELIX CASTILLO07/23/2015
BIS—ISSUEDJ. ALBERTO ROBAINA04/14/2000
BISPLISSUEDA P PLUMBING&HEATING INC09/14/1999
BISPLISSUEDA P PLUMBING&HEATING INC08/10/1999
BISMHISSUEDALHU CONST02/17/1999
BISSPISSUEDALLSTATE SPRINKLER CORP.12/10/1998
BISPLISSUEDA P PLUMBING&HEATING INC10/22/1998
BISEQISSUEDALHU CONSTRUCTION10/20/1998
BIS—ISSUEDALHU CONSTRUCTION10/20/1998
BISPLISSUEDJAY & M PLUMBING10/02/1990
BISMHISSUEDAMERICAN UNITED CONST. CORP.07/20/1990
2 projects · most recent 12/18/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2024Permit IssuedMKNK WASTE REMOVAL INCHeating and Air Conditioning Systems
Heat / Cool
York YFK60B21S 5 tons · Condensing Unit ×6
10/08/2023——Heating and Air Conditioning Systems
Heat / Cool
York YFK60B21S 5 tons · Condensing Unit ×2
1 project · most recent 07/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/30/2026Signed-offJMW PLUMBING, INCGas, Water/Sanitary
3 projects · most recent 01/09/2025
General Wiring
FiledStatusContractorScope
01/09/2025Permit IssuedUNITED ELEC'L CONT'G CORPGeneral Wiring
10/26/2023Permit IssuedUNITED ELEC'L CONT'G CORP4 meters, 1 new_meters
04/13/2018CompleteR.J.ELECTRICAL CONTRACTORGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
06/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/03/2024Fail-Final CND-Occupancy InspectionFailView ↗
12/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
08/13/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
07/01/2026FinalLEON SKVIRSKYprogress
12/20/2024Lighting controlsSERDAR CEYLANenergy_progress
12/20/2024HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
12/20/2024Fenestration areasSERDAR CEYLANenergy_progress
12/20/2024HVAC-R and service water heating system controls—energy_progress
12/20/2024Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
12/20/2024FinalSERDAR CEYLANprogress
12/20/2024Shutoff dampersSERDAR CEYLANenergy_progress
12/20/2024Interior lighting powerSERDAR CEYLANenergy_progress
12/20/2024Insulation placement and R valuesSERDAR CEYLANenergy_progress
12/20/2024Maintenance informationSERDAR CEYLANenergy_progress
12/20/2024HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
12/20/2024Fenestration and door U-factor and product ratingsSERDAR CEYLANenergy_progress
12/20/2024Air barrier - visual inspectionSERDAR CEYLANenergy_progress
12/20/2024Duct leakage testing, insulation and designQIUFAN JIANGenergy_progress
12/20/2024HVAC-R and service water piping design and insulation—energy_progress
12/20/2024Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
12/20/2024Energy Code Compliance InspectionsSERDAR CEYLANprogress
12/20/2024Mechanical SystemsQIUFAN JIANGspecial
12/20/2024Fenestration air leakageSERDAR CEYLANenergy_progress
12/18/2024Fenestration areasSERDAR CEYLANenergy_progress
12/18/2024Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
12/18/2024FinalSERDAR CEYLANprogress
12/18/2024Energy Code Compliance InspectionsSERDAR CEYLANprogress
Latest 25 of 80.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/22/2026X00943633-I1Request digital key ↗
08/21/2026X00944959-P3Request digital key ↗
08/21/2026X00944959-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
08/19/2019240260221Open ↗
05/08/2018220642053Open ↗
12/01/2015220484777Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
08/19/2019240260221Open ↗
08/19/2019240260221Open ↗
05/16/2018220642053Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026X00965060-P2Open ↗
09/02/2026X00965060-I1Open ↗
09/02/2026X00965060-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/22/2026X00943633-I1Open ↗
08/21/2026X00944959-P3Open ↗
08/21/2026X00944959-P2Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
11/20/2019240260221Open ↗
05/08/2018220642053Open ↗
11/04/2015220484777Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026X00965060-P2Open ↗
09/23/2026X00965060-P2Open ↗
09/02/2026X00965060-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/19/2019240260221Open ↗
05/08/2018220642053Open ↗
07/06/2015220466911Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/08/2018220642053Open ↗
07/22/2015220466911Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2019240260221Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/19/2019240260221Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
12/01/2015220484777Open ↗
11/04/2015220484777Open ↗
07/06/2015220466911Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/19/2019240260221Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026X00965060-P2Open ↗
08/13/2026X00965060-P1Open ↗
08/13/2026X00965060-I1Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/22/2026X00943633-I1Open ↗
08/21/2026X00944959-P3Open ↗
08/21/2026X00944959-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice to Proceed9
08/20/2026X01068430-I1Open ↗
08/13/2026X00944959-P2Open ↗
08/13/2026X00944959-P3Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/19/2019240260221Open ↗
07/22/2015220466911Open ↗
07/06/2015220466911Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026X00944959-P2Open ↗
08/13/2026X00965060-P1Open ↗
08/13/2026X00944959-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
08/19/2019240260221Open ↗
07/20/2015220466911Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/14/2008210063447Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/20/2019240260221Open ↗
11/04/2015220484777Open ↗
07/23/2015220466911Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/19/2019240260221Open ↗
▸BISNYCECC ANALYSIS1
08/19/2019240260221Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/19/2019240260221Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/20/2019240260221Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/19/2019240260221Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
08/14/2008210063447Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/21/2015220466911Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/20/2019240260221Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
11/20/2019240260221Open ↗
08/19/2019240260221Open ↗
05/08/2018220642053Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
05/08/2018220642053Open ↗
11/04/2015220484777Open ↗
07/06/2015220466911Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/19/2019240260221Open ↗
▸BISBOROUGH INTAKE FORM1
11/20/2019240260221Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/20/2026X00965060-P2Open ↗
08/20/2026X00965060-P1Open ↗
08/20/2026X00965060-I1Open ↗