Condo, residential unit in 2-10 unit building
128 WOODPOINT ROAD
BROOKLYN · BIN 3429771
💬 Discuss this project
2023Year Built
4Stories
R1Building Class
R6BZoning
6,815 sfGross Floor Area
5Units
Rent StabilizedFDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: 128 WOODPOINT LLC · 2,673 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof32p · 1 filing · 20 docs
Floor 435p · 1 filing · 20 docs
Floor 333p · 1 filing · 20 docs
Floor 232p · 1 filing · 20 docs
Floor 135p · 1 filing · 20 docs
Cellar31p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
128 WOODPOINT7507/08/2026
OWNERS REP804/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHARON ENGINEERING, P.C1604/16/2024
STUDIOSC ARCHITECTURE PLLC704/16/2024
PAUL PERDEK, PROF. ENG. PLLC510/12/2023
ANTHONY GENNARO, PE106/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING4603/21/2026
AE DESIGN SOLUTION1003/21/2026
IOR DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E&M BUILDERS GROUP CORPGeneral Contractor1704/09/2026
A.A.Z ENTERPRISES CORPGeneral Contractor307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor204/09/2026
MARTINEZ ELECTRICAL CONTElectrical103/22/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161804/16/2024
Building Lifecycle
All (181)Filed (29)Permit Issued (22)Signed Off (14)Inspection (10)Objection (76)Special Inspection (30)
10/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/05/2024
Signed off — Alteration
CONSTRUCT ONE 10'-0" CURB CUT ON WOODPOINT ROAD.
B00758793-I1
07/31/2024
Signed off — Alteration
PROPOSE FOUNDATION FOR NEW RETAINING WALL AT REAR YARD FILED IN CONJUNCTION WITH GC # B01025810-I1.
B01025810-S2
07/31/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/25/2024
Signed off — Alteration
B01022916-I1
07/25/2024
Signed off — New Building
Propose plumbing work filed in conjunction with NB-GC # B00748466-I1.
B00748466-S1
07/15/2024
Signed off — Alteration
PROPOSE FOUNDATION FOR NEW RETAINING WALL AT REAR YARD FILED IN CONJUNCTION WITH GC # B01025810-I1.
B01025810-I1
07/12/2024
Signed off — Alteration
PROPOSE FOUNDATION FOR NEW RETAINING WALL AT REAR YARD FILED IN CONJUNCTION WITH GC # B01025810-I1.
B01025810-S1
06/11/2024
Signed off — New Building
Propose plumbing work filed in conjunction with NB-GC # B00748466-I1.
B00748466-S5
06/11/2024
Signed off — New Building
Propose plumbing work filed in conjunction with NB-GC # B00748466-I1.
B00748466-S6
05/24/2024
Permit issued — Support of Excavation
B01025810-S1-SE
05/22/2024
Permit issued — Foundation
B01025810-S2-FO
05/22/2024
Permit issued — General Construction
B01025810-I1-GC
05/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/08/2024
Objection raised — Other
05/08/2024
Objection resolved — Addressed
05/08/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/02/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
04/29/2024
Objection resolved — Addressed
04/26/2024
Objection raised — Scope
04/26/2024
Objection raised — Scope
04/26/2024
Objection raised — Scope
04/26/2024
Objection raised — Other
04/25/2024
Objection raised — Structural
04/25/2024
Objection raised — Structural
04/25/2024
Objection raised — Other
04/25/2024
Objection raised — Inspections
04/25/2024
Objection raised — Structural
04/25/2024
Objection raised — Other
04/25/2024
Objection raised — Energy
04/24/2024
Objection raised — Admin
04/24/2024
Objection raised — Structural
04/24/2024
Objection raised — Other
04/24/2024
Objection raised — Admin
Latest 60 of 181 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offA.A.Z ENTERPRISES CORP05/24/2024
DOB NOWFoundationSigned-offA.A.Z ENTERPRISES CORP05/22/2024
DOB NOWGeneral ConstructionSigned-offA.A.Z ENTERPRISES CORP05/22/2024
DOB NOWConstruction FenceSigned-offE&M BUILDERS GROUP CORP04/04/2024
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC03/11/2024
DOB NOWCurb CutSigned-offE&M BUILDERS GROUP CORP02/05/2024
DOB NOWGeneral ConstructionPermit IssuedE&M BUILDERS GROUP CORP10/27/2023
DOB NOWFoundationSigned-offE&M BUILDERS GROUP CORP10/27/2023
DOB NOWMechanical SystemsSigned-offE&M BUILDERS GROUP CORP10/27/2023
DOB NOWStructuralSigned-offE&M BUILDERS GROUP CORP10/27/2023
DOB NOWConstruction FenceSigned-offE&M BUILDERS GROUP CORP10/27/2023
DOB NOWConstruction FenceSigned-offE&M BUILDERS GROUP CORP09/07/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/16/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/16/2023
DOB NOWPlumbingSigned-offPLBG P & H INC03/17/2023
DOB NOWMechanical SystemsSigned-offE&M BUILDERS GROUP CORP12/19/2022
DOB NOWStructuralSigned-offE&M BUILDERS GROUP CORP12/16/2022
DOB NOWFoundationSigned-offE&M BUILDERS GROUP CORP12/16/2022
DOB NOWSupport of ExcavationSigned-offE&M BUILDERS GROUP CORP12/16/2022
DOB NOWGeneral ConstructionPermit IssuedE&M BUILDERS GROUP CORP12/16/2022
DOB NOWGeneral ConstructionPermit IssuedE&M BUILDERS GROUP CORP12/14/2022
DOB NOWConstruction FenceSigned-offE&M BUILDERS GROUP CORP10/04/2022
1 project · most recent 03/31/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2023Signed-offE&M BUILDERS GROUP CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric HYPER-HEATING MXZ-SM48NAMHZ-U1 48,000 BTU · Condensing Unit ×3
HYPER-HEATING PUZ-HA30NKA 30,000 BTU · Condensing Unit ×2
Heating
Mitsubishi Electric HYPER-HEATING MXZ-SM48NAMHZ-U1 54,000 BTU · Condensing Unit ×3
HYPER-HEATING PUZ-HA30NKA 32,000 BTU · Condensing Unit ×2
Ventilation
Greenheck AS-10-420-A 200 CFM · Exhaust Fan ×1
G-097-VG 150 CFM · Exhaust Fan ×1
1 project · most recent 03/31/2023
Sprinkler System
FiledStatusContractorScope
03/31/2023Signed-offPLBG P & H INCSprinkler System
1 project · most recent 03/31/2023
Storm Water/Sanitary
FiledStatusContractorScope
03/31/2023Signed-offPLBG P & H INCStorm, Water/Sanitary
3 projects · most recent 08/04/2024
General Wiring
FiledStatusContractorScope
08/04/2024CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
05/25/2024CompleteKENNETH FISK ELECTRIC CORGeneral Wiring
05/19/2023CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 03/31/2023
Concrete Masonry
FiledStatusContractorScope
03/31/2023Signed-offPLBG P & H INCConcrete, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/16/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/04/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 125
DateRequirementInspectorRole
04/11/2024Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
04/11/2024Footing and FoundationFAHAD FATEHprogress
04/11/2024FinalFAHAD FATEHprogress
04/11/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
04/11/2024Subgrade InspectionsFAHAD FATEHspecial
03/26/2024FinalFAHAD FATEHprogress
04/05/2023Sprinkler SystemsFAHAD FATEHspecial
04/05/2023Post-installed AnchorsFAHAD FATEHspecial
04/05/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/05/2023Seismic Isolation SystemsFAHAD FATEHspecial
04/03/2023Post-installed AnchorsFAHAD FATEHspecial
04/03/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
04/03/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/03/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
04/03/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/03/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/03/2023Maintenance informationFAHAD FATEHenergy_progress
04/03/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/03/2023On-Site Private Sewage Disposal Systems InstallationFAHAD FATEHspecial
03/29/2023On-Site Private Sewage Disposal Systems InstallationFAHAD FATEHspecial
03/29/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/29/2023Post-installed AnchorsFAHAD FATEHspecial
03/29/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
03/29/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
03/29/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
Latest 25 of 125.
▾Documents — 176 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/29/2026B00764355-I1Request digital key ↗
08/27/2026B00748466-P6Request digital key ↗
08/27/2026B00748466-S4Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits8
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/19/2024322032732Open ↗
01/19/2024322032732Open ↗
01/19/2024322032732Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
03/08/2024340859146Open ↗
01/10/2024322032732Open ↗
07/22/2022340859146Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/12/2024340859146Open ↗
07/08/2022340859146Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00748466-P4Open ↗
08/13/2026B00748466-I1Open ↗
08/13/2026B00748466-A2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00748466-A2Open ↗
08/13/2026B00748466-P4Open ↗
08/13/2026B00748466-P2Open ↗
Showing 3 of 4 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
01/31/2024322032732Open ↗
07/08/2022340859146Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/31/2024322032732Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/31/2024322032732Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
01/31/2024322032732Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/31/2024322032732Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00748466-I1Open ↗
▸Seals & Professional Certifications70
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/29/2026B00764355-I1Open ↗
08/27/2026B00748466-S4Open ↗
08/27/2026B00748466-S5Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/02/2026B00748466-P2Open ↗
09/02/2026B00748466-P2Open ↗
09/01/2026B00748466-P4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026B00748466-P2Open ↗
09/01/2026B00748466-P4Open ↗
09/01/2026B00748466-S5Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/08/2022340859146Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00748466-P2Open ↗
08/13/2026B00748466-I1Open ↗
08/13/2026B00748466-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/27/2026B00748466-P2Open ↗
08/27/2026B00748466-P4Open ↗
08/14/2026B00748466-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
07/08/2022340859146Open ↗
▸BISSTREET TREE CHECKLIST1
07/08/2022340859146Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00748466-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00748466-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00748466-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00748466-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B00748466-S3Open ↗
08/13/2026B00748466-P6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00748466-S3Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00748466-S3Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION8
01/22/2024322032732Open ↗
01/22/2024322032732Open ↗
01/22/2024322032732Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION2
09/04/2024340859146Open ↗
03/12/2024340859146Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/08/2022340859146Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/12/2024340859146Open ↗
▸BISEFILING COVER SHEET1
01/10/2024322032732Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00874249-P1Open ↗
▸Other Documents22
▸DOB NOWProperty Ownership Certification5
08/27/2026B00748466-P4Open ↗
08/27/2026B00748466-P2Open ↗
08/14/2026B00748466-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00748466-I1Open ↗
08/13/2026B00748466-P4Open ↗
08/13/2026B00748466-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00748466-P2Open ↗
08/13/2026B00748466-A2Open ↗
08/13/2026B00748466-P4Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/10/2024322032732Open ↗
01/10/2024322032732Open ↗
01/10/2024322032732Open ↗
▸BISPLOT DIAGRAM2
01/31/2024322032732Open ↗
01/19/2024322032732Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00748466-S2Open ↗
08/13/2026B01025810-S1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/31/2024322032732Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00748466-I1Open ↗