← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1286 NEW YORK AVENUE
BROOKLYN · BIN 3428830
💬 Discuss this project
2020Year Built
6Stories
D1Building Class
R6Zoning
9,792 sfGross Floor Area
14Units
Rent Stabilized19 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 1286 New York Estates · 3,280 sf lot · 2.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2361 Atlantic Estates LLC35p · 4 filings · 20 docs
Bulkhead2361 Atlantic Estates LLC1p · 1 filing · 2 docs
Floor 62361 Atlantic Estates LLC42p · 5 filings · 20 docs
Floor 52361 Atlantic Estates LLC42p · 5 filings · 20 docs
Floor 42361 Atlantic Estates LLC40p · 5 filings · 20 docs
Floor 32361 Atlantic Estates LLC40p · 5 filings · 20 docs
Floor 22361 Atlantic Estates LLC43p · 5 filings · 20 docs
Floor 12361 Atlantic Estates LLC41p · 5 filings · 20 docs
Cellar2361 Atlantic Estates LLC29p · 3 filings · 20 docs
Site & exterior2361 Atlantic Estates LLC25p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2361 Atlantic Estates2407/08/2026
2075 Pacific Estates803/22/2026
1286 New York Estates103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2020$1.1M—Private party → 1286 NEW YORK ESTATES LLC$498/sf building
11/25/2013$565K—Private party → Private party$262/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
Expediting 4 U503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rogers Developers GroupGeneral Contractor1203/22/2026
Core Scaffold SystemsScaffold307/08/2026
Rogers Builders Developmentspecialty_contractor107/08/2026
L&J PLG & Heating Co of NYPlumbing107/08/2026
Metflow Fire ControlFire Protection107/08/2026
Rogers Developers GroupScaffold107/08/2026
Core Scaffold SystemsGeneral Contractor212/14/2021
Rogers Builders and DevelopmentGeneral Contractor108/12/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394701/28/2022
Building Lifecycle
07/06/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT…
HPD violation · open
07/06/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT…
HPD violation · open
07/06/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT…
HPD violation · open
05/11/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/19/2025
Elevator Category 1 inspection report filed
80 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems12/15/2021
DOB NOWSprinklersSigned-offMetflow Fire Control06/04/2021
DOB NOWStructuralSigned-offRogers Developers Group04/08/2021
DOB NOWConstruction FenceSigned-offRogers Developers Group04/05/2021
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY02/27/2021
DOB NOWMechanical SystemsSigned-offRogers Builders and Development12/23/2020
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems12/18/2020
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems12/18/2020
BIS—ISSUEDRogers Developers Group12/21/2021
BISEQISSUEDCore Scaffold Systems12/14/2021
BIS—ISSUEDRogers Developers Group04/15/2021
BISEQISSUEDCore Scaffold Systems12/18/2020
BIS—ISSUEDRogers Builders and Development08/12/2020
4 projects · most recent 06/06/2022
General Wiring
FiledStatusContractorScope
06/06/2022CompleteStar Electrical Contractors—
12/10/2020CompleteV. Vass Electric—
08/27/2020CompleteHivolts ElectricalGeneral Wiring
08/27/2020CompleteHivolts Electrical—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/24/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
01/24/2022Heating SystemsPaul Raymondspecial
01/24/2022Mechanical SystemsPaul Raymondspecial
01/24/2022Post-installed AnchorsPaul Raymondspecial
01/24/2022FinalPaul Raymondprogress
01/24/2022Maintenance informationPaul Raymondenergy_progress
01/24/2022HVAC insulation and sealing Paul Raymondenergy_progress
01/24/2022HVAC and service water heating system controls Paul Raymondenergy_progress
01/24/2022Shutoff dampersPaul Raymondenergy_progress
01/24/2022Electrical motorsPaul Raymondenergy_progress
01/24/2022HVAC and service water heating equipment Paul Raymondenergy_progress
01/13/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
01/13/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
12/20/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/20/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
12/15/2021Sprinkler SystemsPaul Raymondspecial
12/15/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/16/2020FinalPaul Perdekprogress
64 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account