← Back
Two family frame
129-12 133RD STREET
QUEENS · South Ozone Park · BIN 4624283
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3-2Zoning
2,650 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof4p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/23/2021$315K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP712/16/2023
TABRIZ GROUP ENTERPRISES310/02/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRD BROTHERS INCGeneral Contractor903/21/2026
W.R. PLBG AND HTG CORPPlumbing307/08/2026
BDS ELECTRIC CORP.Electrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275612/16/2023
TRIANGLE INSPECTION & TES7495412/16/2023
Building Lifecycle
All (60)Filed (10)Permit Issued (6)Signed Off (3)Inspection (11)Special Inspection (30)
07/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/08/2024
Signed off — Alteration
FILING FOR A STEEL SLEEVE AND APPROXIMATELY 5 LINEAR FEET OF 6" XHCI PIPING
Q00790634-I1
12/28/2023
Signed off — Alteration
FILING FOR A STEEL SLEEVE AND APPROXIMATELY 5 LINEAR FEET OF 6" XHCI PIPING
Q00790634-S1
12/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Special inspection requirement — Sprinkler Systems
BAKHTIAR SHAMLOO
12/20/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/16/2023
Filed — Alteration
FILING FOR A STEEL SLEEVE AND APPROXIMATELY 5 LINEAR FEET OF 6" XHCI PIPING
Q00790634-P3
12/15/2023
Special inspection requirement — Sprinkler Systems
BAKHTIAR SHAMLOO
12/15/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2023
Filed — Alteration
FILING FOR A STEEL SLEEVE AND APPROXIMATELY 5 LINEAR FEET OF 6" XHCI PIPING
Q00790634-P2
11/14/2023
Special inspection requirement — Sprinkler Systems
BAKHTIAR SHAMLOO
11/14/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/02/2023
Signed off — Alteration
PROPOSED 8 FEET CURBCUT IN CONJUNCTION WITH NB#Q00732615
Q00756633-I1
11/01/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/17/2023
Filed — Alteration
PROPOSED 8 FEET CURBCUT IN CONJUNCTION WITH NB#Q00732615
Q00756633-P1
10/12/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
10/12/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Final
HARI SONI
10/12/2023
Special inspection requirement — Subgrade Inspections
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
10/12/2023
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
10/02/2023
Filed — New Building
NEW 2-STORY AND CELLAR TWO FAMILY BUILDING.
Q00732615-P2
09/26/2023
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
09/22/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/21/2023
Filed — Alteration
FILING FOR A STEEL SLEEVE AND APPROXIMATELY 5 LINEAR FEET OF 6" XHCI PIPING
Q00790634-P1
09/07/2023
Permit issued — Curb Cut
Q00756633-I1-CC
07/20/2023
Filed — Alteration
PROPOSED 8 FEET CURBCUT IN CONJUNCTION WITH NB#Q00732615
Q00756633-I1
06/09/2023
Inspection — Certified Gas-Gas-Piping-Underground
Certified
View inspection ↗
06/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/01/2023
Permit issued — Plumbing
Q00790634-S1-PL
05/01/2023
Permit issued — Plumbing
Q00790634-I1-PL
04/20/2023
Filed — Alteration
FILING FOR A STEEL SLEEVE AND APPROXIMATELY 5 LINEAR FEET OF 6" XHCI PIPING
Q00790634-S1
03/29/2023
Permit issued — Plumbing
Q00790634-I1-PL
11/15/2022
Permit issued — General Construction
Q00732615-I1-FO-EA
11/15/2022
Permit issued — Foundation
Q00732615-I1-GC
11/04/2022
Filed — New Building
NEW 2-STORY AND CELLAR TWO FAMILY BUILDING.
Q00732615-P1
09/14/2022
Filed — Alteration
FILING FOR A STEEL SLEEVE AND APPROXIMATELY 5 LINEAR FEET OF 6" XHCI PIPING
Q00790634-I1
05/24/2022
Filed — New Building
NEW 2-STORY AND CELLAR TWO FAMILY BUILDING.
Q00732615-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJRD BROTHERS INC09/07/2023
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP05/01/2023
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP05/01/2023
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP03/29/2023
DOB NOWGeneral ConstructionSigned-offJRD BROTHERS INC11/15/2022
DOB NOWFoundationPermit IssuedJRD BROTHERS INC11/15/2022
2 projects · most recent 10/19/2023
General Wiring Lighting
FiledStatusContractorScope
10/19/2023CompleteBDS ELECTRIC CORP.General Wiring, Lighting
10/12/2023CompleteBDS ELECTRIC CORP.General Wiring, Lighting
1 project · most recent 10/02/2023
FiledStatusContractorScope
10/02/2023Signed-offJRD BROTHERS INC2 scope_items
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
09/22/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
06/09/2023Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
06/09/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
12/20/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/20/2023Sprinkler SystemsBAKHTIAR SHAMLOOspecial
12/15/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/15/2023Sprinkler SystemsBAKHTIAR SHAMLOOspecial
11/14/2023Sprinkler SystemsBAKHTIAR SHAMLOOspecial
11/14/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/12/2023Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
10/12/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
10/12/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
10/12/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
10/12/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
10/12/2023Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
10/12/2023Footing and FoundationBAKHTIAR SHAMLOOprogress
10/12/2023Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
10/12/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
10/12/2023FinalHARI SONIprogress
10/12/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
10/12/2023MasonryBAKHTIAR SHAMLOOspecial
10/12/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
10/12/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/12/2023Subgrade InspectionsBAKHTIAR SHAMLOOspecial
10/12/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
10/12/2023Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
10/12/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
10/12/2023Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
Latest 25 of 73.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026Q00732615-P2Request digital key ↗
08/24/2026Q00732615-P1Request digital key ↗
08/24/2026Q00732615-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
09/14/2022440740496Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/13/2022440740496Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00732615-P1Open ↗
08/13/2026Q00732615-P2Open ↗
08/13/2026Q00732615-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00732615-P1Open ↗
08/13/2026Q00732615-P2Open ↗
08/13/2026Q00732615-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00732615-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWSpecial Inspector Seal & Signature13
09/25/2026Q00732615-I1Open ↗
09/25/2026Q00732615-I1Open ↗
09/01/2026Q00790634-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026Q00732615-P1Open ↗
08/24/2026Q00732615-P2Open ↗
08/24/2026Q00732615-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/25/2026Q00732615-I1Open ↗
09/25/2026Q00732615-I1Open ↗
09/25/2026Q00732615-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/13/2022440740496Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/13/2022440740496Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00732615-P2Open ↗
08/13/2026Q00732615-P1Open ↗
08/13/2026Q00732615-I1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00732615-P1Open ↗
08/13/2026Q00732615-P2Open ↗
08/13/2026Q00732615-I1Open ↗
▸BISSTREET TREES SITE PLAN1
09/25/2023440740496Open ↗
▸BISSTREET TREE CHECKLIST1
09/13/2022440740496Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00732615-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00732615-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00732615-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00732615-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00732615-P1Open ↗
08/13/2026Q00732615-I1Open ↗
08/13/2026Q00732615-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00732615-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/26/2023440740496Open ↗
▸Cost, Insurance & Ownership1
▸BISDEPT OF FINANCE VERIFICATION1
09/13/2022440740496Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/13/2022440740496Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q00732615-P2Open ↗
08/13/2026Q00732615-P1Open ↗
08/13/2026Q00732615-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00732615-P1Open ↗
08/13/2026Q00732615-P2Open ↗
08/13/2026Q00732615-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00732615-P2Open ↗
08/24/2026Q00732615-P1Open ↗
08/24/2026Q00732615-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/14/2022440740496Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/14/2022440740496Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00732615-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00732615-I1Open ↗