← Back
Two family frame
129-16 133RD STREET
QUEENS · South Ozone Park · BIN 4255563
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3-2Zoning
2,650 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,000 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Roof3p · 1 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/23/2021$900K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP812/16/2023
TABRIZ GROUP ENTERPRISES310/02/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRD BROTHERS INCGeneral Contractor707/08/2026
W.R. PLBG AND HTG CORPPlumbing307/08/2026
BDS ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275612/16/2023
TRIANGLE INSPECTION & TES7495512/16/2023
Building Lifecycle
All (75)Filed (11)Permit Issued (6)Signed Off (4)Violation (6)Inspection (8)Objection (10)Special Inspection (30)
02/05/2024
Signed off — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL.
Q00790636-I1
01/08/2024
Signed off — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL.
Q00790636-S1
12/20/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/20/2023
Special inspection requirement — Sprinkler Systems
BAKHTIAR SHAMLOO
12/16/2023
Filed — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL.
Q00790636-P4
12/15/2023
Special inspection requirement — Sprinkler Systems
BAKHTIAR SHAMLOO
12/15/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
11/16/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2023
Filed — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL.
Q00790636-P3
11/14/2023
Special inspection requirement — Sprinkler Systems
BAKHTIAR SHAMLOO
11/14/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Final
HARI SONI
10/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
10/11/2023
Special inspection requirement — Subgrade Inspections
BAKHTIAR SHAMLOO
10/02/2023
Filed — New Building
NEW 2-STORY AND CELLAR TWO FAMILY BUILDING.
Q00735629-P4
09/27/2023
Filed — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL.
Q00790636-P2
09/27/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
09/25/2023
Signed off — Alteration
PROPOSED 10 FEET CURB CUT IN CONJUNCTION WITH NB# Q00735629.
Q00756638-I1
09/22/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/21/2023
Filed — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL.
Q00790636-P1
09/20/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
09/14/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE TO SAFE GUARD CONSTRUCTION / DEMOLITION SITE FOR RESIDENTIAL BUILDINGS. APPLICATIONS # Q00732615, Q00735629,Q00742657,Q00735699,421808039,421804373
Q00699266-I1
09/07/2023
Permit issued — Curb Cut
Q00756638-I1-CC
07/20/2023
Filed — Alteration
PROPOSED 10 FEET CURB CUT IN CONJUNCTION WITH NB# Q00735629.
Q00756638-I1
06/09/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/02/2023
Permit issued — Plumbing
Q00790636-S1-PL
05/01/2023
Permit issued — Plumbing
Q00790636-I1-PL
04/20/2023
Filed — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL.
Q00790636-S1
03/29/2023
Permit issued — Plumbing
Q00790636-I1-PL
03/15/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/09/2022
Permit issued — Earth Work
Q00735629-I1-GC-CX
11/04/2022
Filed — New Building
NEW 2-STORY AND CELLAR TWO FAMILY BUILDING.
Q00735629-P1
09/28/2022
Permit issued — Construction Fence
Q00699266-I1-FN
09/23/2022
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE TO SAFE GUARD CONSTRUCTION / DEMOLITION SITE FOR RESIDENTIAL BUILDINGS. APPLICATIONS # Q00732615, Q00735629,Q00742657,Q00735699,421808039,421804373
Q00699266-I1
09/14/2022
Filed — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL.
Q00790636-I1
07/15/2022
Objection resolved — Addressed
07/15/2022
Objection resolved — Addressed
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJRD BROTHERS INC09/07/2023
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP05/02/2023
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP05/01/2023
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP03/29/2023
DOB NOWEarth WorkPermit IssuedJRD BROTHERS INC11/09/2022
DOB NOWConstruction FenceSigned-offJRD BROTHERS INC09/28/2022
BIS—ISSUEDJRD BROTHERS INC10/18/2022
BISPLISSUEDTHE PLUMBING COMPANY08/25/2005
BISPLISSUEDIDEAL P & H CO INC07/05/2002
2 projects · most recent 10/02/2023
General Wiring Lighting
FiledStatusContractorScope
10/02/2023CompleteBDS ELECTRIC CORP.General Wiring, Lighting
04/12/2022CompleteBDS ELECTRIC CORP.—
1 project · most recent 10/02/2023
FiledStatusContractorScope
10/02/2023Permit IssuedJRD BROTHERS INC2 scope_items
1 project · most recent 10/02/2023
Earthwork
FiledStatusContractorScope
10/02/2023Permit IssuedJRD BROTHERS INCEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/22/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/15/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
12/20/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/20/2023Sprinkler SystemsBAKHTIAR SHAMLOOspecial
12/15/2023Sprinkler SystemsBAKHTIAR SHAMLOOspecial
12/15/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
11/14/2023Sprinkler SystemsBAKHTIAR SHAMLOOspecial
11/14/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/11/2023HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
10/11/2023Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
10/11/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
10/11/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
10/11/2023Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
10/11/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
10/11/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
10/11/2023MeteringBAKHTIAR SHAMLOOenergy_progress
10/11/2023Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
10/11/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
10/11/2023Footing and FoundationBAKHTIAR SHAMLOOprogress
10/11/2023FinalHARI SONIprogress
10/11/2023HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
10/11/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
10/11/2023Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
10/11/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
10/11/2023MasonryBAKHTIAR SHAMLOOspecial
10/11/2023HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
10/11/2023Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
Latest 25 of 52.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026Q00790636-I1Request digital key ↗
08/25/2026Q00790636-S1Request digital key ↗
08/25/2026Q00790636-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/16/2022421804373Open ↗
▸BISWORK PERMIT APPLICATION1
10/25/2022421804373Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00735629-P1Open ↗
08/13/2026Q00735629-I1Open ↗
08/13/2026Q00735629-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00735629-I1Open ↗
08/13/2026Q00735629-P4Open ↗
08/13/2026Q00735629-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00735629-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026Q00790636-P4Open ↗
08/25/2026Q00790636-I1Open ↗
08/25/2026Q00790636-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00790636-I1Open ↗
09/01/2026Q00790636-I1Open ↗
09/01/2026Q00790636-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/24/2026Q00735629-P1Open ↗
08/24/2026Q00735629-P1Open ↗
08/24/2026Q00735629-P1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00735629-I1Open ↗
08/13/2026Q00735629-P4Open ↗
08/13/2026Q00735629-P1Open ↗
▸BISGAS CUT-OFF1
10/25/2022421804373Open ↗
▸BISELECTRIC CUT-OFF1
10/25/2022421804373Open ↗
▸BISSEWER CUT-OFF1
10/25/2022421804373Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/24/2026Q00735629-P1Open ↗
08/24/2026Q00735629-P4Open ↗
08/14/2026Q00735629-I1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/25/2022421804373Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/25/2022421804373Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00735629-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00735629-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00735629-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/25/2022421804373Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00735629-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/25/2022421804373Open ↗
10/25/2022421804373Open ↗
10/25/2022421804373Open ↗
Showing 3 of 5 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
10/25/2022421804373Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
05/16/2022421804373Open ↗
▸BISEFILING COVER SHEET1
05/16/2022421804373Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026Q00735629-P4Open ↗
08/13/2026Q00735629-I1Open ↗
08/13/2026Q00735629-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00735629-I1Open ↗
08/13/2026Q00735629-P1Open ↗
08/13/2026Q00735629-P4Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00735629-P1Open ↗
08/24/2026Q00735629-P4Open ↗
08/14/2026Q00735629-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00735629-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00735629-I1Open ↗