3 Open Violations 0 unresolved · 3 paperwork only▸
ECB10/15/2025FTM ISSUED ON 7/11/24 FRONT YARD PLANTING PER ZR23-613(OLD ZR23-451STIPULATES 20 PERCENT),ILLEGAL DRIVEWAY NOT COMPLY ZR25-622 STIPULATES SINGLE DRIVEWAY FOR LOT FRONTAGE LESS 33 FEET,BIS INDICATES 20 FEET. ATONothing owed — awaiting certificate of correction
ECB10/15/2025FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS NOTED : VIOLATION #34859198H ISSUED, WWP FOR CONCRETE PARKING PAD AND CURB CUT CREATING A 2NDNothing owed — awaiting certificate of correction
ECB07/03/2010WORK WITHOUT PERMIT WORK NOTED: AT FRONT & LEFT SIDE INSTALLED APPROX 1500 SQ FT PARKING PAD (CONCRETE) TO CREATE 2ND DRIVEWAY WITH LOW CURB(CURB CUT). PARKING PAD/DRIVEWAY HAS NO FLOOR DRAINAGE AS PER LL 103/8Nothing owed — awaiting certificate of correction
Two family converted from one family · 5,042 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.