← Back
All parking garages
129-19 METROPOLITAN AVENUE
QUEENS · Kew Gardens · BIN 4193300
💬 Discuss this project
1930Year Built
1Stories
G1Building Class
R6Zoning
770 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
All parking garages · Owner of record: 129 METROPOLITAN AVE LLC · 6,368 sf lot · 0.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof9p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 85p · 1 filing · 20 docs
Floor 77p · 1 filing · 20 docs
Floor 67p · 1 filing · 20 docs
Floor 54p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIDERIS KEFALAS ENGINEERS PC702/11/2026
WEXLER ASSOCIATES310/22/2025
GERALD CALIENDO ARCHITECTS306/13/2025
RAS PE CONSULTING ENGINEERS201/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZORIA HOUSING, LLCGeneral Contractor207/08/2026
Building Lifecycle
All (61)Filed (15)Permit Issued (2)Signed Off (1)Violation (1)Objection (12)Special Inspection (30)
05/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/19/2026
Special inspection requirement — Lighting controls
05/19/2026
Special inspection requirement — Interior lighting power
05/19/2026
Special inspection requirement — Maintenance information
05/19/2026
Special inspection requirement — Exterior lighting power
05/19/2026
Special inspection requirement — Shutoff dampers
05/19/2026
Special inspection requirement — Metering
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/19/2026
Special inspection requirement — Lighting in dwelling units
05/19/2026
Special inspection requirement — Electrical motors and elevators
05/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/19/2026
Special inspection requirement — Mechanical Systems
05/19/2026
Special inspection requirement — Final
05/01/2026
Special inspection requirement — Maintenance information
05/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/01/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
02/11/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-P4
02/11/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-P3
01/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/28/2026
Special inspection requirement — Maintenance information
01/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/28/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/26/2025
Special inspection requirement — Lighting controls
11/18/2025
Objection resolved — Resolved
11/14/2025
Objection raised — Admin
11/14/2025
Objection raised — Admin
11/14/2025
Objection raised — Admin
10/27/2025
Special inspection requirement — Vestibules
10/22/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-S8
10/22/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-S6
10/22/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-S7
10/10/2025
Objection resolved — Addressed
09/29/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-P2
09/29/2025
Objection raised — Other
09/26/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-P1
09/09/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-S4
08/13/2025
Objection resolved — Addressed
07/15/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-S3
07/11/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-S5
06/30/2025
Objection raised — Other
06/24/2025
Signed off — Full Demolition
Construction Fence Plan for demolition of existing garage
Q01158977-I1
06/13/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-S1
06/13/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-S2
04/07/2025
Permit issued — Full Demolition
Q01158977-I1-FD
04/07/2025
Permit issued — Construction Fence
Q01158977-S1-FN
03/07/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 8 STORY, 57 UNIT BUILDING. FILED IN CONJUCTION WITH NB#Q01183635-I1.
Q01183635-I1
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Other
01/15/2025
Objection raised — Other
01/08/2025
Filed — Full Demolition
Construction Fence Plan for demolition of existing garage
Q01158977-I1
01/08/2025
Filed — Full Demolition
Construction Fence Plan for demolition of existing garage
Q01158977-S1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offZORIA HOUSING, LLC04/07/2025
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC04/07/2025
1 project · most recent 02/11/2026
Sprinkler System
FiledStatusContractorScope
02/11/2026——Sprinkler System
1 project · most recent 02/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/11/2026——Storm, Water/Sanitary
1 project · most recent 02/11/2026
Concrete
FiledStatusContractorScope
02/11/2026——Concrete
2 projects · most recent 02/11/2026
Fence
FiledStatusContractorScope
02/11/2026——Fence
01/08/2025Signed-offZORIA HOUSING, LLCFence
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
05/26/2026Subsurface Investigations (Borings/Test Pits)—special
05/19/2026Metering—energy_progress
05/19/2026HVAC-R and service water heating equipment—energy_progress
05/19/2026Exterior lighting power—energy_progress
05/19/2026Shutoff dampers—energy_progress
05/19/2026Maintenance information—energy_progress
05/19/2026Final—progress
05/19/2026Mechanical Systems—special
05/19/2026Fire-Resistant Penetrations and Joints—special
05/19/2026Interior lighting power—energy_progress
05/19/2026Electrical motors and elevators—energy_progress
05/19/2026Duct leakage testing, insulation and design—energy_progress
05/19/2026HVAC-R and service water heating system controls—energy_progress
05/19/2026Lighting controls—energy_progress
05/19/2026Lighting in dwelling units—energy_progress
05/19/2026HVAC-R and service water piping design and insulation—energy_progress
05/01/2026Fire-Resistant Penetrations and Joints—special
05/01/2026HVAC-R and service water piping design and insulation—energy_progress
05/01/2026HVAC-R and service water heating equipment—energy_progress
05/01/2026HVAC-R and service water heating system controls—energy_progress
05/01/2026Maintenance information—energy_progress
05/01/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/28/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/28/2026HVAC-R and service water heating equipment—energy_progress
01/28/2026Maintenance information—energy_progress
Latest 25 of 78.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/21/2026Q01158977-I1Request digital key ↗
08/21/2026Q01158977-S1Request digital key ↗
08/18/2026Q01183635-S9Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits1
▸DOB NOWDEP Stormwater Construction Permit1
08/13/2026Q01183635-I1Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01183635-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01183635-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01183635-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/18/2026Q01183635-S5Open ↗
08/18/2026Q01183635-S3Open ↗
08/13/2026Q01183635-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01158977-I1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01183635-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q01158977-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01158977-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01158977-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01158977-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01183635-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWOER: Notice to Proceed4
08/13/2026Q01183635-S5Open ↗
08/13/2026Q01183635-I1Open ↗
08/13/2026Q01183635-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01158977-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01158977-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/18/2026Q01183635-S6Open ↗
08/13/2026Q01183635-S7Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/13/2026Q01158977-I1Open ↗
08/13/2026Q01183635-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01183635-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01158977-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01158977-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01158977-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01183635-I1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/13/2026Q01183635-S7Open ↗