Dormitory
Coral Towers
125 3 AVENUE · BIN 1082118
💬 Discuss this project
1999Year Built
16Stories
H8Building Class
C1-9AZoning
113,754 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized3 Open Violations ▸
Dormitory · Owner of record: CORAL CRYSTAL LLC · 8,060 sf lot · 14.11 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Permit Issued — active, not yet Signed-off
PenthouseUnder Construction10p · 2 filings · 20 docs
Floor 16Under Construction9p · 3 filings · 20 docs
Floor 15Under Construction8p · 1 filing · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FORKOSH CONSTRUCTION5509/13/2026
OWNER OF 129 3RD AVE103/22/2026
FORKOSH CONSTRUCTION CO.I303/22/2026
OWNER OF PREMISES 129 3RD103/22/2026
OWNER OF 129 3RD AVE NYNY103/22/2026
FORHOSH CONSTRUCTION CORP103/22/2026
T.N.L CONSTRUCTION INC103/22/2026
CRYSTAL TOWER503/22/2026
TOTAL NY CONSTRUCTION103/21/2026
CORAL REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOTTOLA RINI ENGINEERS1306/22/2026
C3D ARCHITECTURE PLLC501/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Y A CONSULTING EXPEDITING3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FORKOSH CONSTRUCTION COGeneral Contractor507/08/2026
RRP PLUMBING CORPPlumbing507/08/2026
CHANDRAPAUL BHARRATTElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
RRP PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO53441406/22/2026
MOTTOLA RINI ENGINEERS, P32511106/22/2026
Building Lifecycle
All (148)Filed (18)Permit Issued (11)Signed Off (9)Violation (60)Inspection (16)Objection (4)Special Inspection (30)
08/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/13/2026
Signed off — Alteration
This application is being filed for the mechanical work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy under this application.
M01418784-I1
06/30/2026
Permit issued — Mechanical Systems
M01418784-I1-MS
06/22/2026
Filed — Alteration
This application is being filed for the mechanical work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy under this application.
M01418784-I1
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2026
Signed off — Alteration
M01278561-I1
02/13/2026
Signed off — Alteration
This alteration is being filed for plumbing work in conjunction with the Alt CO application #M01219652-I1 for new bathroom and fixtures.
M01245580-I1
02/12/2026
Signed off — Alteration
Alteration application is being filed for a sprinkler work at the subject premises in conjunction with the Alt CO application #M01219652. There are no change in use, egress or occupancy.
M01245588-I1
01/27/2026
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P4
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
01/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
01/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
01/23/2026
Special inspection requirement — Fenestration areas
MINA HANNA
01/23/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
01/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
01/21/2026
Signed off — Alteration
This application is filed for gas work related to the removal of 10 modular boilers and installation of 3 new boilers. No change in use, egress or occupancy.
M01219658-I1
01/15/2026
Signed off — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-I1
01/15/2026
Signed off — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-S1
12/29/2025
Signed off — Alteration
This application is being filed for the mechanical work type in conjunction with boiler and plumbing work type for the replacement of existing modular boilers with 3 new boilers. There are no change in use, egress or occupancy under this application
M01221164-I1
12/15/2025
Permit issued — General Construction
M01219652-I1-GC
12/10/2025
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P3
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
12/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/10/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
12/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
12/10/2025
Special inspection requirement — Fenestration areas
MINA HANNA
12/10/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
12/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
12/05/2025
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P2
12/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
12/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
12/05/2025
Special inspection requirement — Fenestration areas
MINA HANNA
12/05/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
11/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P1
11/03/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
11/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
11/03/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
11/03/2025
Special inspection requirement — Fenestration areas
MINA HANNA
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
10/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/24/2025
Filed — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-P2
10/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
10/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
10/21/2025
Permit issued — General Construction
M01219652-I1-GC
10/17/2025
Permit issued — Boiler Equipment
M01221424-S1-BE
10/14/2025
Permit issued — Mechanical Systems
M01278561-I1-MS
10/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2025
Filed — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-S1
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFORKOSH CONSTRUCTION CO06/30/2026
DOB NOWGeneral ConstructionPermit IssuedFORKOSH CONSTRUCTION CO12/15/2025
DOB NOWGeneral ConstructionPermit IssuedFORKOSH CONSTRUCTION CO10/21/2025
DOB NOWBoiler EquipmentSigned-offRRP PLUMBING CORP10/17/2025
DOB NOWMechanical SystemsSigned-offFORKOSH CONSTRUCTION CO10/14/2025
DOB NOWBoiler EquipmentSigned-offRRP PLUMBING CORP08/28/2025
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.07/03/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP06/30/2025
DOB NOWMechanical SystemsSigned-offFORKOSH CONSTRUCTION CO06/12/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP05/09/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP04/05/2022
BISOTISSUEDFORKOSH CONSTRUCTION CO08/30/2022
BISOTISSUEDFORKOSH CONSTRUCTION CO05/10/2022
BISOTISSUEDFORKOSH CONSTRUCTION CO06/13/2020
BISEQISSUEDTOTAL NY CONSTRUCTION CORP04/04/2011
BISOTISSUEDTKM COMMUNICATION CORP11/21/2006
BISMHISSUEDFORKOSH CONSTRUCTION CO01/19/2001
BISBLISSUEDDUAL FUEL PLUBING & HTING08/25/2000
BISSDISSUEDN.K.PLMB & HTNG CORP05/03/2000
BISSDISSUEDDUAL FUEL PLUBING & HTING03/22/2000
BISPLISSUEDMORTON CHAIT03/15/2000
BIS—RE-ISSUEDFORKOSH CONSTRUCTION CO12/28/1999
BISOTISSUEDFORKOSH CONSTRUCTION CO11/04/1999
BIS—ISSUEDDOUBLE M.DEMOLITION,INC.08/30/1999
3 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedMNBC ELECTRICAL CORPGeneral Wiring
11/17/2025CompleteCMY ELECTRICAL CORPGeneral Wiring
06/27/2025CompleteCMY ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
08/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/04/2025Pass-Final PL - UndergroundPassView ↗
07/31/2025Fail-Final PL - UndergroundFailView ↗
07/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
01/23/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
01/23/2026Tenant Protection Plan Compliance—special
01/23/2026Energy Code Compliance InspectionsMINA HANNAprogress
01/23/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
01/23/2026Fenestration areasMINA HANNAenergy_progress
01/23/2026Fenestration air leakageMINA HANNAenergy_progress
01/23/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/10/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/10/2025Tenant Protection Plan Compliance—special
12/10/2025Energy Code Compliance InspectionsMINA HANNAprogress
12/10/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
12/10/2025Fenestration areasMINA HANNAenergy_progress
12/10/2025Fenestration air leakageMINA HANNAenergy_progress
12/10/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/05/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/05/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
12/05/2025Energy Code Compliance InspectionsMINA HANNAprogress
12/05/2025Tenant Protection Plan Compliance—special
12/05/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/05/2025Fenestration areasMINA HANNAenergy_progress
12/05/2025Fenestration air leakageMINA HANNAenergy_progress
11/03/2025Tenant Protection Plan Compliance—special
11/03/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
11/03/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
11/03/2025Fenestration air leakageMINA HANNAenergy_progress
Latest 25 of 54.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/02/2026M00686092-I1Request digital key ↗
08/23/2026M01219658-I1Request digital key ↗
08/23/2026M01221164-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
04/17/2020140893031Open ↗
06/27/2011120647452Open ↗
06/24/2011120647452Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
06/13/2020140893031Open ↗
04/05/2011120647452Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWHouse Number Verification: TOPO Stamp5
08/13/2026M01219652-P4Open ↗
08/13/2026M01219652-I1Open ↗
08/13/2026M01219652-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature34
09/23/2026M01221424-I1Open ↗
09/23/2026M01221424-S1Open ↗
09/23/2026M01221424-S1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/23/2026M01219658-I1Open ↗
08/23/2026M01221164-P1Open ↗
08/23/2026M01221164-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026M01221424-S1Open ↗
09/23/2026M01221424-S1Open ↗
09/23/2026M01221424-I1Open ↗
Showing 3 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/17/2020140893031Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/17/2020140893031Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/05/2011120647452Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/17/2020140893031Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/05/2011120647452Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/05/2011120647452Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/13/2026M01219652-P3Open ↗
08/13/2026M01219652-I1Open ↗
08/13/2026M01219652-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
04/17/2020140893031Open ↗
▸Environmental & Asbestos23
▸DOB NOWOER: Notice of Satisfaction10
08/13/2026M01219658-I1Open ↗
08/13/2026M01221424-S1Open ↗
08/13/2026M01221164-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWOER: Notice to Proceed10
08/13/2026M01221164-I1Open ↗
08/13/2026M01221164-P1Open ↗
08/13/2026M01221424-I1Open ↗
Showing 3 of 10 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
03/23/2023140893031Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
04/17/2020140893031Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/05/2011120647452Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/17/2020140893031Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/17/2020140893031Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/23/2023140893031Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/23/2023140893031Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/17/2020140893031Open ↗
04/17/2020140893031Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/23/2023140893031Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/27/2023140893031Open ↗
▸BISFINAL1
03/24/2023140893031Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/05/2011120647452Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
04/17/2020140893031Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/24/2023140893031Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
04/17/2020140893031Open ↗
▸BISADDITIONAL INFORMATION1
06/24/2011120647452Open ↗
▸BISEFILING COVER SHEET1
04/05/2011120647452Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification5
08/19/2026M01219652-I1Open ↗
08/19/2026M01219652-P4Open ↗
08/19/2026M01219652-P3Open ↗
Showing 3 of 5 on file for this type