← Back
BuildNYC
Dormitory
Coral Tower
129 3RD AVENUE · Name © OpenStreetMap contributors · Gramercy · BIN 1082118
💬 Discuss this project
1999Year Built
16Stories
H8Building Class
C1-9AZoning
113,754 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸
Dormitory · Owner of record: Coral Crystal · 8,060 sf lot · 14.11 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCoral Crystal LLC7p · 1 filing · 16 docs
PenthouseCoral Crystal LLC26p · 5 filings · 20 docs
Floor 17Coral Crystal LLC14p · 3 filings · 20 docs
Floor 16Coral Crystal LLC23p · 5 filings · 20 docs
Floor 15Convert mechanical spaces to residential8p · 1 filing · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Coral Tower project1p · 1 filing · 4 docs
Floor 1Coral Tower project1p · 1 filing · 4 docs
Site & exteriorSidewalk shed3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Coral Crystal1803/22/2026
Crystal1303/21/2026
Coral Realty703/21/2026
321 Bowery403/21/2026
LJP Realty403/21/2026
NYU103/21/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C3D Architecture609/30/2026
Mottola Rini Engineers1306/22/2026
Scalar Architecture112/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Y A Consulting Expediting3203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold507/08/2026
Forkosh Construction CoGeneral Contractor507/08/2026
RRP PlumbingPlumbing507/08/2026
Volvie Herman ContractingElectrical203/21/2026
Herman WilliamElectrical203/21/2026
MNBC ElectricalElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
RRP PlumbingFire Protection107/08/2026
Syed-Naqvi AltafElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab Co53441509/30/2026
Mottola Rini Engineers, P32511106/22/2026
Building Lifecycle
All (149)Filed (20)Permit Issued (14)Signed Off (10)Violation (60)Inspection (11)Objection (4)Special Inspection (30)
09/30/2026
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P6
09/28/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
09/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/28/2026
Special inspection requirement — Fenestration areas
MINA HANNA
09/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
09/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
09/28/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
09/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
07/13/2026
Signed off — Alteration
This application is being filed for the mechanical work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy under this application.
M01418784-I1
06/30/2026
Permit issued — Mechanical Systems
M01418784-I1-MS
06/22/2026
Filed — Alteration
This application is being filed for the mechanical work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy under this application.
M01418784-I1
02/13/2026
Signed off — Alteration
M01278561-I1
02/13/2026
Signed off — Alteration
This alteration is being filed for plumbing work in conjunction with the Alt CO application #M01219652-I1 for new bathroom and fixtures.
M01245580-I1
02/12/2026
Signed off — Alteration
Alteration application is being filed for a sprinkler work at the subject premises in conjunction with the Alt CO application #M01219652. There are no change in use, egress or occupancy.
M01245588-I1
01/27/2026
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P4
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
01/23/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
01/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
01/23/2026
Special inspection requirement — Fenestration areas
MINA HANNA
01/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
01/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
01/21/2026
Signed off — Alteration
This application is filed for gas work related to the removal of 10 modular boilers and installation of 3 new boilers. No change in use, egress or occupancy.
M01219658-I1
01/15/2026
Signed off — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-I1
01/15/2026
Signed off — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-S1
12/29/2025
Signed off — Alteration
This application is being filed for the mechanical work type in conjunction with boiler and plumbing work type for the replacement of existing modular boilers with 3 new boilers. There are no change in use, egress or occupancy under this application
M01221164-I1
12/15/2025
Permit issued — General Construction
M01219652-I1-GC
12/10/2025
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P3
12/10/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
12/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
12/10/2025
Special inspection requirement — Fenestration areas
MINA HANNA
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
12/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/10/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
12/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
12/05/2025
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P2
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
12/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
12/05/2025
Special inspection requirement — Fenestration areas
MINA HANNA
12/05/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
11/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Filed — Alteration CO
This Alteration CO application is being filed to change the use of 15 and 16 from mechanical spaces to residential spaces.
M01219652-P1
11/03/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
11/03/2025
Special inspection requirement — Fenestration areas
MINA HANNA
10/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/24/2025
Filed — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-P2
10/21/2025
Permit issued — General Construction
M01219652-I1-GC
10/17/2025
Permit issued — Boiler Equipment
M01221424-S1-BE
10/14/2025
Permit issued — Mechanical Systems
M01278561-I1-MS
10/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2025
Filed — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-S1
09/15/2025
Filed — Alteration
This application is being filed for the mechanical work type in conjunction with boiler and plumbing work type for the replacement of existing modular boilers with 3 new boilers. There are no change in use, egress or occupancy under this application
M01221164-P1
09/15/2025
Filed — Alteration
This application is being filed for the boiler work type for the replacement of exist. modular boilers with 3 new boilers. Boilers 1 & 2 are filed under this application & the 3rd boiler filed under a subsequent filing.
M01221424-P1
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offForkosh Construction Co06/30/2026
DOB NOWGeneral ConstructionPermit IssuedForkosh Construction Co12/15/2025
DOB NOWGeneral ConstructionPermit IssuedForkosh Construction Co10/21/2025
DOB NOWBoiler EquipmentSigned-offRRP Plumbing10/17/2025
DOB NOWMechanical SystemsSigned-offForkosh Construction Co10/14/2025
DOB NOWBoiler EquipmentSigned-offRRP Plumbing08/28/2025
DOB NOWSprinklersSigned-offRalph W. Landolfi JR07/03/2025
DOB NOWPlumbingSigned-offRRP Plumbing06/30/2025
DOB NOWMechanical SystemsSigned-offForkosh Construction Co06/12/2025
DOB NOWPlumbingSigned-offRRP Plumbing05/09/2025
DOB NOWPlumbingSigned-offRRP Plumbing04/05/2022
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding04/02/2021
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding04/02/2020
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding12/26/2019
BISOTISSUEDForkosh Construction Co08/30/2022
BISOTISSUEDForkosh Construction Co05/10/2022
BISOTISSUEDForkosh Construction Co06/13/2020
BIS—ISSUEDA.M.A. Holdings04/03/2012
BIS—ISSUEDA.M.A. Holdings04/03/2012
BIS—ISSUEDA.M.A. Holdings04/03/2012
BIS—ISSUEDA.M.A. Holdings04/03/2012
BISPLISSUEDMetrocity Group03/28/2012
BISSPISSUEDSpeedway Plumbing03/26/2012
BISOTISSUEDDuane Reade09/01/2011
BISEQISSUEDDuane Reade09/01/2011
BISOTISSUEDTower Building Services07/14/2011
BISEQISSUEDTotal NY Construction04/04/2011
BISOTISSUEDTKM Communication11/21/2006
BIS—ISSUEDA.M.A. Holdings04/12/2001
BIS—ISSUEDA.M.A. Holdings04/12/2001
BIS—RE-ISSUEDA.M.A. Holdings04/12/2001
BIS—ISSUEDA.M.A. Holdings04/12/2001
BISSPISSUEDA.R.L. Plumbing & Heating02/15/2001
BISMHISSUEDForkosh Construction Co01/19/2001
BISPLISSUEDNeptune Mechanical11/13/2000
BISMHISSUEDDaboco Inc. Duane Reade10/20/2000
BISBLISSUEDDual Fuel Plumbing & Heating08/25/2000
BISSDISSUEDN.k.plmb & Heating05/03/2000
BISEQISSUEDSpring Enterpris03/29/2000
BISEQISSUEDSpring Enterpris03/29/2000
+ 14 more permits on file
4 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedMNBC ElectricalGeneral Wiring
11/17/2025CompleteCMY ElectricalGeneral Wiring
06/27/2025CompleteCMY Electrical—
02/21/2020CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
09/28/2026Fenestration areasMINA HANNAenergy_progress
09/28/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
09/28/2026Tenant Protection Plan Compliance—special
09/28/2026Energy Code Compliance InspectionsMINA HANNAprogress
09/28/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
09/28/2026Fenestration air leakageMINA HANNAenergy_progress
09/28/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
01/23/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
01/23/2026Tenant Protection Plan Compliance—special
01/23/2026Energy Code Compliance InspectionsMINA HANNAprogress
01/23/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
01/23/2026Fenestration areasMINA HANNAenergy_progress
01/23/2026Fenestration air leakageMINA HANNAenergy_progress
01/23/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/10/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/10/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/10/2025Fenestration air leakageMINA HANNAenergy_progress
12/10/2025Fenestration areasMINA HANNAenergy_progress
12/10/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
12/10/2025Energy Code Compliance InspectionsMINA HANNAprogress
12/10/2025Tenant Protection Plan Compliance—special
12/05/2025Fenestration areasMINA HANNAenergy_progress
12/05/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/05/2025Tenant Protection Plan Compliance—special
12/05/2025Energy Code Compliance InspectionsMINA HANNAprogress
Latest 25 of 63.
▾Documents — 263 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch18
09/02/2026M00686092-I1Request digital key ↗
08/23/2026M01219658-I1Request digital key ↗
08/23/2026M01221164-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00284160-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION15
04/17/2020140893031Open ↗
05/24/2012121008471Open ↗
05/10/2012120792721Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION11
06/13/2020140893031Open ↗
04/10/2012121001192Open ↗
04/06/2012121029458Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp6
10/05/2026M01219652-P6Open ↗
08/13/2026M01219652-I1Open ↗
08/13/2026M01219652-P1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications104
▸DOB NOWProgress Inspector Seal & Signature39
10/05/2026M01219652-P6Open ↗
10/05/2026M01219652-P6Open ↗
10/05/2026M01219652-P6Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
10/05/2026M01219652-P6Open ↗
09/05/2026M00284160-I1Open ↗
08/23/2026M01219658-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
10/05/2026M01219652-P6Open ↗
10/03/2026M01245588-P1Open ↗
09/23/2026M01221424-S1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
08/13/2012120792721Open ↗
04/05/2012121029092Open ↗
04/04/2012121029458Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
05/17/2012121008471Open ↗
04/05/2012121029083Open ↗
04/05/2012121029092Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
05/24/2012121008471Open ↗
04/05/2012121029092Open ↗
04/04/2012121029458Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/17/2020140893031Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/17/2020140893031Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/17/2020140893031Open ↗
▸Trade Schedules & Equipment14
▸BISEQUIPMENT USE PERMITS6
08/13/2012120792721Open ↗
08/07/2012120792721Open ↗
08/07/2012120792721Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
05/10/2012120792721Open ↗
04/25/2012120792721Open ↗
03/28/2012120792721Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/13/2012120792721Open ↗
08/07/2012120792721Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/24/2012120792721Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist6
10/05/2026M01219652-P6Open ↗
08/13/2026M01219652-P1Open ↗
08/13/2026M01219652-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
04/17/2020140893031Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00284160-I1Open ↗
▸Environmental & Asbestos30
▸DOB NOWOER: Notice to Proceed11
08/13/2026M01221164-P1Open ↗
08/13/2026M01221424-I1Open ↗
08/13/2026M01221424-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
08/13/2026M01219658-I1Open ↗
08/13/2026M01221424-S1Open ↗
08/13/2026M01221164-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
05/17/2012121008471Open ↗
03/15/2012121001192Open ↗
06/10/2011120715529Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
03/23/2023140893031Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
04/17/2020140893031Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/05/2011120647452Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
08/22/2011120792721Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY2
05/17/2012121008471Open ↗
08/23/2011120792721Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/23/2023140893031Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/23/2023140893031Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/13/2012120792721Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/17/2020140893031Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/17/2020140893031Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/17/2020140893031Open ↗
04/17/2020140893031Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/23/2023140893031Open ↗
▸Approvals, Objections & Sign-offs14
▸BISADMINISTRATIVE OBJECTIONS9
05/24/2012121008471Open ↗
04/05/2012121029092Open ↗
04/04/2012121029458Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/27/2023140893031Open ↗
08/13/2012120792721Open ↗
10/07/2011120715529Open ↗
▸BISFINAL1
03/24/2023140893031Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/05/2012121029092Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
04/17/2020140893031Open ↗
08/13/2012120792721Open ↗
08/13/2012120792721Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/24/2023140893031Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET9
05/24/2012121008471Open ↗
04/05/2012121029092Open ↗
04/04/2012121029458Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/17/2020140893031Open ↗
▸BISADDITIONAL INFORMATION1
06/24/2011120647452Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification6
10/05/2026M01219652-P6Open ↗
08/19/2026M01219652-P4Open ↗
08/19/2026M01219652-P3Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/06/2012121029467Open ↗
04/06/2012121029083Open ↗