← Back
BuildNYC
Three families
129 BAY 26 STREET
BROOKLYN · Bath Beach · BIN 3167913
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5Zoning
3,288 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Three families · 3,528 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof-mounted solar panel installation2p · 1 filing · 8 docs
Floor 2Unit 1A211p · 3 filings · 20 docs
Floor 1Plumbing work18p · 3 filings · 20 docs
CellarPlumbing work9p · 4 filings · 20 docs
Site & exteriorInstallation of signs and fixtures9p · 6 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/04/2024$1.4M—DMVG NY FL LLC → Private party$425/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering107/21/2026
Chun Feng, Architect903/14/2025
NY Building Associates312/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 3382403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
High Quality ConstructionGeneral Contractor506/27/2026
High Quality ConstructionScaffold406/27/2026
High Quality Constructionspecialty_contractor306/27/2026
Sunrun Installation Servicespecialty_contractor107/28/2026
American Standard P&H CororpPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272107/21/2026
NKM Engineering6244803/14/2025
J&R Design and Inspection6637112/19/2024
Sq. Arch4802203/21/2024
Building Lifecycle
11/13/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01431486-I1
07/27/2026
Permit issued — Solar
B01431486-I1-SL
07/21/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01431486-I1
07/21/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
75 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service07/27/2026
DOB NOWConstruction FenceSigned-offHigh Quality Construction01/09/2025
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction08/26/2024
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction04/02/2024
DOB NOWSupported ScaffoldSigned-offHigh Quality Construction03/26/2024
DOB NOWConstruction FenceSigned-offHigh Quality Construction03/26/2024
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction02/06/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp01/22/2024
DOB NOWMechanical SystemsSigned-offHigh Quality Construction01/17/2024
DOB NOWMechanical SystemsSigned-offHigh Quality Construction01/17/2024
2 projects · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026CompleteSunrun Solar Electl—
02/03/2025CompleteE D ElectricalGeneral Wiring
1 project · most recent 07/21/2026
FiledStatusContractorScope
07/21/2026Signed-offSunrun Installation Service—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/08/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/30/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/18/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
07/21/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/21/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/15/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/15/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/15/2026FinalWalid Abdullaprogress
03/17/2025Fenestration areasNARESH MAHANGUenergy_progress
03/17/2025Insulation placement and R valuesNARESH MAHANGUenergy_progress
03/17/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
03/17/2025Wood – Seismic ResistanceNARESH MAHANGUspecial
03/17/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/17/2025FinalChun Fengprogress
03/17/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/17/2025Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
03/17/2025Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
03/17/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
03/17/2025Fenestration air leakageNARESH MAHANGUenergy_progress
03/14/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
03/14/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/14/2025Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
03/14/2025Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
03/14/2025Fenestration areasNARESH MAHANGUenergy_progress
03/14/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
03/14/2025Insulation placement and R valuesNARESH MAHANGUenergy_progress
03/14/2025Fenestration air leakageNARESH MAHANGUenergy_progress
03/14/2025FinalChun Fengprogress
Latest 25 of 58.
71 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account