Miscellaneous educational facility
Bosworth Building
129 PIERREPONT STREET · BIN 3001915
💬 Discuss this project
1906Year Built
12Stories
W9Building Class
C6-4Zoning
116,863 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FISP: SAFEFDNY Report ↗
Miscellaneous educational facility · Owner of record: ST ANN'S SCHOOL · 8,100 sf lot · 14.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Roof5p · 3 filings · 20 docs
Floor 123p · 2 filings · 20 docs
Floor 111p · 1 filing · 20 docs
Floor 102p · 2 filings · 20 docs
Floor 93p · 3 filings · 20 docs
Floor 82p · 2 filings · 20 docs
Floor 71p · 1 filing · 20 docs
Floor 66p · 2 filings · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Mezzanine1p · 1 filing · 5 docs
Cellar1p · 1 filing · 20 docs
Sub-Cellar4p · 1 filing · 20 docs
8 jobs · most recent 11/19/2025
General Wiring
FiledStatusContractorScope
11/19/2025CompleteAPOLLO ELECTRIC INSDUS INGeneral Wiring
04/30/2025CompleteRICHARD NEU—
01/28/2025CompleteAPOLLO ELECTRIC INSDUS INGeneral Wiring
09/13/2023Permit IssuedPHOENIX ELECTRIC NY LLCGeneral Wiring
06/20/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
08/25/2022CompleteTEAM ELECTRIC, INCGeneral Wiring
06/30/2021CompleteNASH ELECTRIC SERVICES IN—
02/06/2018CompleteTEAM ELECTRIC, INC—
Building Lifecycle
All (262)Filed (47)Permit Issued (42)Signed Off (28)Facade (FISP) (20)Violation (60)Inspection (19)Objection (16)Special Inspection (30)
05/27/2026
Cycle 10 facade report submitted
05/14/2026
Cycle 10 facade report signed — SWARMP
03/30/2026
Cycle 10 facade inspection completed
10/22/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01216838-I1
09/24/2025
Signed off — Alteration
Filing for general construction work relating to the secondary column supports of the existing structure, The structural work is filed as subsequent filing.
B00927075-I1
09/24/2025
Signed off — Alteration
Filing for general construction work relating to the secondary column supports of the existing structure, The structural work is filed as subsequent filing.
B00927075-S1
05/29/2025
Violation issued (ECB, closed)
Construction
04/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01216838-I1
04/29/2025
Permit issued — Supported Scaffold
B01216838-I1-SF
04/29/2025
Permit issued — Sidewalk Shed
B01216838-I1-SH
03/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
03/28/2025
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
03/28/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
03/28/2025
Special inspection requirement — Structural Steel - High Strength Bolting
CONNIE PISANI
03/28/2025
Special inspection requirement — Final
CONNIE PISANI
03/26/2025
Filed — Alteration
Filing for general construction work relating to the secondary column supports of the existing structure, The structural work is filed as subsequent filing.
B00927075-P2
02/27/2025
Signed off — Alteration
Filing for mechanical work to provide new air distribution to new offices and bathrooms. No change to egress, use, or occupancy.
B00892042-S3
02/27/2025
Signed off — Alteration
Filing for interior general construction work as per plans submitted. No change to egress, use, or occupancy.
B00890770-S2
02/13/2025
Signed off — Alteration
ADJUST EXISTING EXHAUST AIR DISTRIBUTION & ADDED EXHAUST FAN ACCORDINGLY FOR UPDATED BATHROOM LAYOUTS AT 6TH FLOOR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY.
B01060297-S2
01/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/15/2025
Permit issued — Sprinklers
B00890770-S2-EW-SP
01/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/06/2025
Signed off — Alteration
MECHANICAL WORK TO ADD VENTILATION SYSTEM TO EXERCISE ROOM AT 12TH FLOOR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY.
B01111072-I1
01/06/2025
Permit issued — Sprinklers
B00892042-S3-EW-SP
12/19/2024
Violation issued (FDNY_ORDER, closed)
12/18/2024
Signed off — Alteration
ADJUST EXISTING EXHAUST AIR DISTRIBUTION & ADDED EXHAUST FAN ACCORDINGLY FOR UPDATED BATHROOM LAYOUTS AT 6TH FLOOR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY.
B01060297-S1
11/18/2024
Signed off — Alteration
Replacement of existing roof drains with associated piping back to existing risers.
B01095748-I1
11/12/2024
Signed off — Alteration
ADJUST EXISTING EXHAUST AIR DISTRIBUTION & ADDED EXHAUST FAN ACCORDINGLY FOR UPDATED BATHROOM LAYOUTS AT 6TH FLOOR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY.
B01060297-I1
10/22/2024
Signed off — Alteration
Filing for mechanical work to provide new air distribution to new offices and bathrooms. No change to egress, use, or occupancy.
B00892042-I1
10/22/2024
Signed off — Alteration
Filing for mechanical work to provide new air distribution to new offices and bathrooms. No change to egress, use, or occupancy.
B00892042-S2
10/18/2024
Signed off — Alteration
FILING HEREWITH FOR FACADE REPAIRS AS PER PLANS SUBMITTED. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B00462729-I1
10/09/2024
Signed off — Alteration
REMOVE FUEL OIL TANK. ALL WORK IS BEING PERFORMED STRICTLY IN THE SUB-CELLAR.
B01088317-I1
10/07/2024
Permit issued — Mechanical Systems
B01111072-I1-MS
09/27/2024
Filed — Alteration
MECHANICAL WORK TO ADD VENTILATION SYSTEM TO EXERCISE ROOM AT 12TH FLOOR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY.
B01111072-I1
09/26/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/24/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/17/2024
Permit issued — Structural
B00927075-S1-ST
09/17/2024
Permit issued — General Construction
B00927075-I1-GC
09/16/2024
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
09/16/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
09/13/2024
Signed off — Alteration
Filing for interior general construction work as per plans submitted. No change to egress, use, or occupancy.
B00890770-I1
09/13/2024
Signed off — Alteration
Filing for interior general construction work as per plans submitted. No change to egress, use, or occupancy.
B00890770-S1
09/12/2024
Permit issued — Plumbing
B01095748-I1-PL
09/09/2024
Filed — Alteration
Replacement of existing roof drains with associated piping back to existing risers.
B01095748-I1
08/23/2024
Permit issued — General Construction
B01088317-I1-GC
08/19/2024
Filed — Alteration
REMOVE FUEL OIL TANK. ALL WORK IS BEING PERFORMED STRICTLY IN THE SUB-CELLAR.
B01088317-I1
08/19/2024
Permit issued — Sprinklers
B01060297-S2-EW-SP
08/08/2024
Filed — Alteration
ADJUST EXISTING EXHAUST AIR DISTRIBUTION & ADDED EXHAUST FAN ACCORDINGLY FOR UPDATED BATHROOM LAYOUTS AT 6TH FLOOR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY.
B01060297-P1
08/07/2024
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
08/07/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
07/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD LEMANSKY
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD LEMANSKY
07/31/2024
Special inspection requirement — Final
RICHARD LEMANSKY
07/29/2024
Filed — Alteration
Filing for interior general construction work as per plans submitted. No change to egress, use, or occupancy.
B00890770-P4
07/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 262 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAINT ANNS SCHOOL24407/08/2026
PLATINUM SERVICES NY604/09/2026
ST ANN'S SCHOOL5003/22/2026
570 ATLANTIC OWNERS LLC203/22/2026
OWNER OF PREMISES103/22/2026
ST ANNS SCHOOL C O COLGATE ENTE803/21/2026
ST ANNS SCHOOL C O CS BRIDGE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO7203/21/2026
SYNERGY BUILDING CONSULTANTS703/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YORKE CONSTRUCTION CORPGeneral Contractor2107/08/2026
PRECISION HOIST & SCAFFO*General Contractor1107/08/2026
NYC MAINT & RESTORATION IGeneral Contractor1007/08/2026
UNITED PLBG MECHANICAL INCFire Protection507/08/2026
CITY/SUBURBAN PLBG CORPPlumbing507/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor204/09/2026
GO PRO FIRE PROTECTION CFire Protection207/08/2026
SAINT ANN'S SCHOOLGeneral Contractor207/08/2026
APOLLO ELECTRIC INSDUS INElectrical103/22/2026
NEW YORK HEATING CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842803/26/2025
RICHMOND TESTING LAB2631607/29/2024
LEE KANTOR, P.E.5988309/11/2023
KLINE ENGINEERING, PC1007310/04/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC04/29/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/29/2025
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC01/15/2025
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC01/06/2025
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP10/07/2024
DOB NOWStructuralSigned-offYORKE CONSTRUCTION CORP09/17/2024
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP09/17/2024
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP09/12/2024
DOB NOWGeneral ConstructionSigned-offNEW YORK HEATING CORP08/23/2024
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC08/19/2024
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP07/05/2024
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP06/28/2024
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP06/27/2024
DOB NOWGeneral ConstructionSigned-offNYC MAINT & RESTORATION I04/09/2024
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP09/11/2023
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC09/07/2023
DOB NOWStructuralSigned-offYORKE CONSTRUCTION CORP09/07/2023
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC09/07/2023
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP07/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*07/24/2023
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP07/21/2023
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP07/20/2023
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP07/20/2023
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP07/20/2023
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*06/29/2023
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*06/29/2023
DOB NOWGeneral ConstructionSigned-offNYC MAINT & RESTORATION I04/13/2023
DOB NOWBoiler EquipmentSigned-offCITY/SUBURBAN PLBG CORP10/13/2022
DOB NOWStructuralSigned-offYORKE CONSTRUCTION CORP08/29/2022
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP08/02/2022
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*07/03/2022
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*07/01/2022
DOB NOWMechanical SystemsSigned-offYORKE CONSTRUCTION CORP06/29/2022
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP06/14/2022
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP04/20/2022
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C03/11/2022
DOB NOWGeneral ConstructionSigned-offNYC MAINT & RESTORATION I02/22/2022
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C08/13/2021
DOB NOWGeneral ConstructionSigned-offSAINT ANN'S SCHOOL07/26/2021
DOB NOWMechanical SystemsSigned-offSAINT ANN'S SCHOOL07/26/2021
+ 52 more permits on file
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
01/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/26/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/24/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/18/2022Pass-Final Boiler Equipment InspectionPassView ↗
10/17/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
10/05/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
03/28/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
03/28/2025Structural Steel - WeldingCONNIE PISANIspecial
03/28/2025Structural Steel - DetailsCONNIE PISANIspecial
03/28/2025Structural Steel - High Strength BoltingCONNIE PISANIspecial
03/28/2025FinalCONNIE PISANIprogress
09/16/2024Post-installed AnchorsCONNIE PISANIspecial
09/16/2024Sprinkler SystemsCONNIE PISANIspecial
09/16/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
08/07/2024Post-installed AnchorsCONNIE PISANIspecial
08/07/2024Sprinkler SystemsCONNIE PISANIspecial
08/07/2024Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
07/31/2024Structural Stability – Alterations of existing buildingsRICHARD LEMANSKYspecial
07/31/2024Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
07/31/2024FinalRICHARD LEMANSKYprogress
07/23/2024FinalRICHARD LEMANSKYprogress
07/23/2024Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
07/23/2024Sprinkler SystemsRICHARD LEMANSKYspecial
07/23/2024Mechanical SystemsRICHARD LEMANSKYspecial
07/23/2024FinalRICHARD LEMANSKYprogress
07/23/2024Structural Stability – Alterations of existing buildingsRICHARD LEMANSKYspecial
06/06/2024Mechanical SystemsCONNIE PISANIspecial
06/06/2024Post-installed AnchorsCONNIE PISANIspecial
06/06/2024FinalCONNIE PISANIprogress
05/09/2024Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
05/09/2024Structural Steel - DetailsCONNIE PISANIspecial
Latest 25 of 55.
▾Documents — 906 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch45
09/01/2026B00550000-P4Request digital key ↗
09/01/2026B00550000-P3Request digital key ↗
09/01/2026B00550000-P1Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00462729-I1Request digital key ↗
09/01/2026B00462729-P1Request digital key ↗
▸Applications & Permits177
▸BISPLAN / WORK APPROVAL APPLICATION75
11/14/2025320908531Open ↗
11/05/2025320908531Open ↗
10/27/2021321683264Open ↗
Showing 3 of 75 on file for this type
▸BISWORK PERMIT APPLICATION60
03/09/2020320908531Open ↗
07/19/2018320908531Open ↗
04/13/2018321779811Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWLPC Approval/Permit32
08/29/2026B00729070-P4Open ↗
08/29/2026B00729070-P5Open ↗
08/29/2026B00729070-P6Open ↗
Showing 3 of 32 on file for this type
▸BISPLACE OF ASSEMBLY7
12/03/2018321685725Open ↗
10/04/2018321685725Open ↗
03/29/2018320526579Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
01/30/2018320908531Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISMUST UPDATE THE PW1 (SECTION 9;ZONING EXHIBIT RECORD (I,II,III,ETC)IF NO CRFN NUMBERS EXIST UNDER THIS JOB. THIS IS TO BE RESOLVED PRIOR TO THE ISSUANCE OF THE FINAL CO.1
01/06/2026320908531Open ↗
▸Seals & Professional Certifications211
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION84
03/15/2019320908531Open ↗
03/15/2019320908531Open ↗
12/03/2018321685725Open ↗
Showing 3 of 84 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/01/2026B00462729-P1Open ↗
09/01/2026B00462729-I1Open ↗
09/01/2026B00537793-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/29/2026B00927075-I1Open ↗
09/23/2026B00729070-S4Open ↗
09/18/2026B00892042-S2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/29/2026B00927075-I1Open ↗
09/18/2026B00892042-S2Open ↗
09/02/2026B00890770-P2Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
08/07/2020340753759Open ↗
Showing 1 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
08/07/2020340753759Open ↗
Showing 1 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
08/07/2020340753759Open ↗
Showing 1 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL/OWNER SIGNATURES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment42
▸BISSCHEDULE B - PLUMBING16
12/10/2018320908531Open ↗
05/09/2018320908531Open ↗
03/28/2018320908531Open ↗
Showing 3 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
11/14/2018321446431Open ↗
08/27/2018320908531Open ↗
08/27/2018320908531Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
03/23/2018320908531Open ↗
03/08/2018320908531Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
11/03/2025320908531Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPR1
01/06/2026320908531Open ↗
▸BISEQUIPMENT USE PERMITS1
11/29/2018320908531Open ↗
▸BISOPERABLE EXISTING STANDPIPE DURINGCONSTRUCTION1
01/08/2026320908531Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
05/02/2018320908531Open ↗
04/27/2018320908531Open ↗
02/14/2018320908531Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos46
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
09/01/2026B00462729-P1Open ↗
09/01/2026B00462729-I1Open ↗
08/29/2026B00713719-I1Open ↗
Showing 3 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
08/07/2020340753759Open ↗
08/01/2018321142857Open ↗
Showing 2 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/01/2026B00537793-I1Open ↗
09/01/2026B00541437-I1Open ↗
08/29/2026B00729070-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
02/14/2018321779811Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
03/07/2018321319523Open ↗
03/07/2018321319523Open ↗
Showing 2 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
03/07/2018321319523Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/07/2020340753759Open ↗
Showing 1 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY16
08/07/2020340753759Open ↗
08/07/2020340753759Open ↗
10/04/2018321685725Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs160
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter47
09/01/2026B00462729-P1Open ↗
09/01/2026B00462729-I1Open ↗
09/01/2026B00537793-I1Open ↗
Showing 3 of 47 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST46
02/10/2021340290401Open ↗
01/05/2021320908531Open ↗
10/19/2020320908531Open ↗
Showing 3 of 46 on file for this type
▸BISLANDMARKS APPROVAL24
08/07/2020340753759Open ↗
08/15/2018340494325Open ↗
08/15/2018340408062Open ↗
Showing 3 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
12/03/2018321685725Open ↗
12/03/2018321685725Open ↗
08/23/2018321685725Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
11/08/2018320908531Open ↗
05/10/2018320908531Open ↗
05/02/2018320908531Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER4
03/09/2020320908531Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/29/2026B00729070-I1Open ↗
08/29/2026B00729070-S1Open ↗
08/29/2026B00729070-S2Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
04/25/2018320908531Open ↗
01/30/2018320908531Open ↗
▸BISLANDMARKS SIGNOFF1
08/15/2018340408053Open ↗
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT31
08/07/2020340753759Open ↗
12/28/2018321446431Open ↗
12/13/2018321446431Open ↗
Showing 3 of 31 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
07/19/2018320908531Open ↗
Showing 1 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/07/2026320908531Open ↗
02/02/2021340290401Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms97
▸BISBOROUGH INTAKE FORM32
02/13/2020320908531Open ↗
11/22/2019320908531Open ↗
11/15/2019320908531Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION30
01/16/2019320908531Open ↗
10/04/2018321685725Open ↗
08/23/2018321685725Open ↗
Showing 3 of 30 on file for this type
▸BISEFILING COVER SHEET24
02/14/2018321779811Open ↗
Showing 1 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
08/07/2020340753759Open ↗
Showing 1 of 11 on file for this type
▸Other Documents24
▸BISFEE EXEMPTION DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWProof of Historic Building8
08/29/2026B00713719-I1Open ↗
08/29/2026B00729070-P8Open ↗
08/29/2026B00729070-I1Open ↗
Showing 3 of 8 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
06/13/2018340392168Open ↗
06/13/2018340392355Open ↗
02/14/2018321779811Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type