Primarily 4 family with 1 store or office
129 RUSSELL STREET
BROOKLYN · Greenpoint · BIN 3067051
💬 Discuss this project
1931Year Built
3Stories
S4Building Class
R6BZoning
5,750 sfGross Floor Area
5Units
0 Open ViolationsFDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 192 NASSAU AVE LLC · 2,500 sf lot · 2.3 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 317p · 1 filing · 20 docs
Floor 217p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
Sub-Cellar16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GW EQUITIES507/08/2026
J G CONSTRUCTION SRVCS1104/09/2026
ADOR BUILDERS103/22/2026
CONG EVANG LUTH CHURCH303/22/2026
CONG EDANG RUTH CHURCH103/22/2026
LUTHERAN CHURCH OF THE MESSIAH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP406/10/2025
CHOSEN MEP, CORP.309/23/2024
LEANDRO NILS DICKSON ARCHITECT, LLC209/03/2024
R & O ENGINEERING208/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADOR BUILDERS LLCGeneral Contractor607/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor204/09/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
SKYVIEW HTG&AIR CON CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616609/23/2024
Building Lifecycle
All (138)Filed (11)Permit Issued (13)Signed Off (8)Violation (17)Inspection (9)Objection (50)Special Inspection (30)
05/05/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (FDNY_NOV, closed)
03/18/2026
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/12/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01019860-S2
09/02/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01019860-S1
08/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01195108-I1
08/25/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01182492-I1
07/30/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01019860-S3
07/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/24/2025
Signed off — Alteration
FENCE APPLICATION FILED IN CONJUNCTION WITH ALTERATION CO JOB #B01019860.
B01104094-I1
07/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/18/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/09/2025
Permit issued — Sprinklers
B01019860-S3-EW-SP
07/08/2025
Permit issued — Plumbing
B01019860-S2-PL
06/16/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01019860-S4
06/16/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01019860-S5
06/10/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01182492-P2
06/06/2025
Violation issued (ECB, closed)
Unknown
05/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2025
Permit issued — General Construction
B01019860-I1-GC
03/19/2025
Permit issued — Sidewalk Shed
B01195108-I1-SH
03/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01195108-I1
03/18/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01182492-P1
03/14/2025
Permit issued — Sprinklers
B01019860-S3-EW-SP
03/13/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2025
Permit issued — Plumbing
B01019860-S2-PL
02/21/2025
Permit issued — Supported Scaffold
B01182492-I1-SF
02/20/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01182492-I1
12/05/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/19/2024
Objection resolved — Addressed
11/19/2024
Objection resolved — Addressed
11/19/2024
Objection resolved — Addressed
11/14/2024
Objection raised — Structural
11/14/2024
Objection raised — Structural
11/14/2024
Objection raised — Structural
11/06/2024
Objection resolved — Addressed
10/31/2024
Permit issued — Structural
B01019860-S4-ST
10/31/2024
Permit issued — Mechanical Systems
B01019860-S1-MS
10/15/2024
Objection resolved — Addressed
10/11/2024
Permit issued — Plumbing
B01019860-S2-PL
09/27/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
09/23/2024
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01019860-S2
09/23/2024
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01019860-S1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2024
Permit issued — Foundation
B01019860-S5-FO
09/19/2024
Objection raised — Scope
09/13/2024
Permit issued — Construction Fence
B01104094-I1-FN
09/11/2024
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01019860-S3
09/11/2024
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
09/11/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/09/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
09/09/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN07/09/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.07/08/2025
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC04/21/2025
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS03/19/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC03/14/2025
DOB NOWPlumbingSigned-offSKYVIEW HTG&AIR CON CORP03/06/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS02/21/2025
DOB NOWStructuralSigned-offADOR BUILDERS LLC10/31/2024
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC10/31/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC10/11/2024
DOB NOWFoundationSigned-offADOR BUILDERS LLC09/19/2024
DOB NOWConstruction FenceSigned-offADOR BUILDERS LLC09/13/2024
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC09/03/2024
BISOTISSUEDMANCINI CONST CORP12/27/2004
BISPLISSUEDGEORGE BASSOLINO INC07/21/1998
BISBLISSUEDGEORGE BASSOLINO INC07/21/1998
1 project · most recent 09/23/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2024Permit IssuedADOR BUILDERS LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Samsung SAMSUNG -AJ048BXJ5CH/AA SAMSUNG- AM048TXMDCH/AA 45,500 BTU · Vrf Outdoor ×9
SAMSUNG - AM060MXMDCH/AA 57,000 BTU · Vrf Outdoor ×2
Heating
Samsung SAMSUNG -AJ048BXJ5CH/AA SAMSUNG- AM048TXMDCH/AA 52,500 BTU · Vrf Outdoor ×9
SAMSUNG - AM060MXMDCH/AA 57,000 BTU · Vrf Outdoor ×2
Ventilation
Whisper Warm WHISPER-WARM- FV-11VH1 50 CFM · Exhaust Fan ×19
Zephyr ZEPHYR- Z5H 50 CFM · Kitchen Exhaust ×10
3 projects · most recent 10/01/2025
Boiler Controls General Wiring
FiledStatusContractorScope
10/01/2025CompleteBROOKLYN POWER ELECTRIC CBoiler Controls
08/01/2025CompleteFRIED ELECTRIC CO.General Wiring
03/18/2025CompleteRICHARD NEU—
1 project · most recent 09/23/2024
Steel
FiledStatusContractorScope
09/23/2024Signed-offAMERICAN STANDARD PLUMBINSteel
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/13/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
09/27/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
09/11/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
09/11/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
09/09/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/09/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/09/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/09/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/09/2024Maintenance informationFAHAD FATEHenergy_progress
09/09/2024Heating SystemsFAHAD FATEHspecial
09/09/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/09/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/09/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/09/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/09/2024Maintenance informationFAHAD FATEHenergy_progress
09/09/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/09/2024Post-installed AnchorsFAHAD FATEHspecial
09/09/2024Seismic Isolation SystemsFAHAD FATEHspecial
08/21/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/20/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
08/20/2024Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
08/20/2024Structural Steel - WeldingFAHAD FATEHspecial
08/20/2024Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
08/20/2024Structural Cold-Formed SteelFAHAD FATEHspecial
08/20/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/20/2024Subgrade InspectionsFAHAD FATEHspecial
Latest 25 of 35.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026B01019860-S4Request digital key ↗
08/24/2026B01019860-S3Request digital key ↗
08/24/2026B01019860-S2Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
09/15/2025300769283Open ↗
09/12/2025300769283Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01019860-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026B01019860-S4Open ↗
08/24/2026B01019860-S3Open ↗
08/24/2026B01019860-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B01019860-S2Open ↗
08/25/2026B01019860-S3Open ↗
08/25/2026B01019860-S5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B01019860-S2Open ↗
08/25/2026B01019860-S5Open ↗
08/25/2026B01019860-S4Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist1
08/13/2026B01019860-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01019860-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01019860-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01019860-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026B01019860-S3Open ↗
08/24/2026B01019860-S2Open ↗
08/24/2026B01019860-S1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01019860-S5Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01019860-S5Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/24/2026B01019860-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01019860-I1Open ↗