← Back
Walk-up cooperative
129 WEST 70 STREET
MANHATTAN · BIN 1029751
💬 Discuss this project
1886Year Built
4Stories
C6Building Class
R8BZoning
5,771 sfGross Floor Area
5Units
Rent Stabilized3 Open Violations ▸
Walk-up cooperative · Owner of record: CEC BROWNSTONE INC · 1,816 sf lot · 3.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof5p · 3 filings · 20 docs
Floor 41p · 2 filings · 10 docs
Floor 3
Floor 2
Floor 1
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAYMOND HO ARCHITECT603/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
GREEN POWER SOLUTIONS103/21/2026
KUSHNER STUDIOS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OPEN DOOR RENOVATIONSGeneral Contractor404/09/2026
CHATZI CONSTRUCTION INCGeneral Contractor303/21/2026
APOLLO PLBG & HTG INCPlumbing207/08/2026
RICHARD DANTSITSElectrical203/21/2026
P.S.I. MECHANICALPlumbing107/08/2026
MANHATTAN CABINETS, INCGeneral Contractor107/08/2026
CAPE PLUMBING INCPlumbing107/08/2026
ALEXANDER BERNARDIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854110/22/2025
RAYMOND HO ARCHITECT, PLL1654208/01/2025
IVAN DESIGN ENGINEERING &6983102/27/2023
CHEN ENGINEERING SERVICES1826102/14/2023
CROSSCHECK INSPECTION SER544202/02/2021
Building Lifecycle
All (54)Filed (9)Permit Issued (8)Signed Off (5)Violation (14)Inspection (6)Special Inspection (12)
08/25/2026
Signed off — Alteration
Installation of plumbing fixture as per plans filed herewith. No change to use, egress or occupancy.
M00825392-I1
08/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/26/2026
Signed off — Alteration
Structural work for private roof deck, accessory to dwelling unit directly below, as per plans filed herewith. No change to use, egress or occupancy.
M00825397-I1
10/22/2025
Filed — Alteration
M01291310-I1
08/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PING MAN HO
08/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
PING MAN HO
08/01/2025
Filed — Alteration
NEW PLUMBING WORKS IN APT 3RD LOCATED ONTHIRD FLOOR
M00814480-P1
07/16/2025
Permit issued — Plumbing
M00825392-I1-PL
06/04/2025
Violation issued (HPD, closed)
A
12/12/2024
Permit issued — Structural
M00825397-I1-ST
12/05/2024
Permit issued — General Construction
M00823458-I1-GC
11/22/2024
Violation issued (HPD, closed)
I
10/25/2024
Signed off — Alteration
INTERIOR RENOVATION AT APT 3 ON THE 3RD FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M00812644-I1
04/01/2024
Violation issued (HPD, closed)
A
12/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2023
Permit issued — Plumbing
M00814480-I1-PL
03/20/2023
Permit issued — General Construction
M00812644-I1-GC
03/16/2023
Violation issued (HPD, closed)
A
02/27/2023
Filed — Alteration
Structural work for private roof deck, accessory to dwelling unit directly below, as per plans filed herewith. No change to use, egress or occupancy.
M00825397-I1
02/14/2023
Filed — Alteration
Installation of plumbing fixture as per plans filed herewith. No change to use, egress or occupancy.
M00825392-I1
02/14/2023
Filed — Alteration
M00823458-I1
02/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ivan Luk
02/14/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Ivan Luk
02/14/2023
Special inspection requirement — Post-installed Anchors
Ivan Luk
02/14/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Ivan Luk
02/14/2023
Special inspection requirement — Structural Steel - Welding
Ivan Luk
02/13/2023
Filed — Alteration
INTERIOR RENOVATION AT APT 3 ON THE 3RD FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M00812644-I1
02/13/2023
Filed — Alteration
NEW PLUMBING WORKS IN APT 3RD LOCATED ONTHIRD FLOOR
M00814480-I1
02/07/2023
Special inspection requirement — Structural Steel - Details
Ivan Luk
02/07/2023
Special inspection requirement — Final
Ivan Luk
02/07/2023
Special inspection requirement — Structural Cold-Formed Steel
Ivan Luk
01/13/2023
Special inspection requirement — Final
PING MAN HO
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
01/05/2022
Signed off — Alteration
REPLACEMENT AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00463808-I1
12/17/2021
Signed off — Alteration
M00458048-I1
12/17/2021
Permit issued — Plumbing
M00463808-I1-PL
04/07/2021
Permit issued — Plumbing
M00463808-I1-PL
03/16/2021
Permit issued — General Construction
M00458048-I1-GC
02/02/2021
Filed — Alteration
REPLACEMENT AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00463808-I1
02/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
01/26/2021
Filed — Alteration
M00458048-I1
10/26/2016
Violation issued (HPD, closed)
I
11/26/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2000
Violation issued (HPD, open)
B
12/13/2000
Violation issued (HPD, open)
A
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAPE PLUMBING INC07/16/2025
DOB NOWStructuralSigned-offOPEN DOOR RENOVATIONS12/12/2024
DOB NOWGeneral ConstructionPermit IssuedOPEN DOOR RENOVATIONS12/05/2024
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL03/27/2023
DOB NOWGeneral ConstructionSigned-offMANHATTAN CABINETS, INC03/20/2023
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC12/17/2021
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC04/07/2021
DOB NOWGeneral ConstructionSigned-offCHATZI CONSTRUCTION INC03/16/2021
BISPLISSUEDP.S.I. MECHANICAL05/09/2016
BISOTISSUEDTIMELINE RENOVATIONS INC04/19/2016
BISBLISSUEDDUNDEE P/H11/16/2006
BISOTISSUEDMODERN ERA DEVELOPMENT CORP07/19/2005
BISPLISSUEDDUNDEE PLUMB HEAT05/31/2005
BISOTISSUEDMODERN ERA DEVELOPMENT CORP03/18/2005
BISOTISSUEDMODERN ERA DEVELOPMENT CORP03/18/2005
2 jobs · most recent 08/01/2025
Water/Sanitary Gas
FiledStatusContractorScope
08/01/2025Signed-offP.S.I. MECHANICALGas, Water/Sanitary
02/14/2023Signed-offCAPE PLUMBING INCWater/Sanitary
5 jobs · most recent 10/15/2025
General Wiring
FiledStatusContractorScope
10/15/2025Permit IssuedBERNARDI ELECTRIC INC.—
07/15/2025Permit IssuedL J ELEC'L SERV. INC.General Wiring
10/04/2023CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
03/21/2023CompletePHILIP A. ROBINSONGeneral Wiring
11/11/2021CompleteDEMAND ELECTRIC INCGeneral Wiring
1 job · most recent 02/27/2023
Steel
FiledStatusContractorScope
02/27/2023Signed-offOPEN DOOR RENOVATIONSSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/05/2025Fire-Resistant Penetrations and JointsPING MAN HOspecial
08/05/2025Tenant Protection Plan CompliancePING MAN HOspecial
02/14/2023Structural Stability – Alterations of existing buildingsIvan Lukspecial
02/14/2023Construction Operations Influencing Adjacent StructuresIvan Lukspecial
02/14/2023Post-installed AnchorsIvan Lukspecial
02/14/2023Structural Steel - High Strength BoltingIvan Lukspecial
02/14/2023Structural Steel - WeldingIvan Lukspecial
02/07/2023Structural Steel - DetailsIvan Lukspecial
02/07/2023FinalIvan Lukprogress
02/07/2023Structural Cold-Formed SteelIvan Lukspecial
01/13/2023FinalPING MAN HOprogress
02/01/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/31/2026M00812644-I1Request digital key ↗
08/31/2026M00823458-I1Request digital key ↗
08/31/2026M00825392-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00463808-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00458048-I1Request digital key ↗
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit9
08/13/2026M00463808-I1Open ↗
08/13/2026M00823458-I1Open ↗
08/13/2026M01291310-I1Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION2
05/23/2016122714376Open ↗
04/22/2016122714376Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/21/2016122714376Open ↗
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M00825397-I1Open ↗
09/01/2026M00825397-I1Open ↗
09/01/2026M00825397-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/04/2026M00458048-I1Open ↗
08/13/2026M00814480-P1Open ↗
08/13/2026M01291310-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/11/2016122714376Open ↗
07/11/2016122714376Open ↗
07/11/2016122714376Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00825397-I1Open ↗
08/29/2026M00812644-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/21/2016122714376Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/21/2016122714376Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/21/2016122714376Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00458048-I1Open ↗
08/13/2026M00814480-I1Open ↗
08/13/2026M00814480-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M01291310-I1Open ↗
08/13/2026M00823458-I1Open ↗
08/13/2026M00825397-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/11/2016122714376Open ↗
04/21/2016122714376Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/11/2016122714376Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLANDMARKS APPROVAL1
04/21/2016122714376Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/11/2016122714376Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
07/11/2016122714376Open ↗
04/21/2016122714376Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
04/22/2016122714376Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/21/2016122714376Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M00823458-I1Open ↗
08/13/2026M00825392-I1Open ↗