← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1290 EAST 19TH STREET
BROOKLYN · Midwood · BIN 3180706
💬 Discuss this project
1931Year Built
6Stories
D1Building Class
R7AZoning
50,658 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized6 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 1290 E 19th · 10,560 sf lot · 4.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Site & exteriorFront parapet wall replacementUnder Construction3p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Unique Restoration Construction110/13/2026
1290 E 19th103/22/2026
1290 East 19th Street103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering109/08/2026
Mohammad Haque108/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Unique Restoration ConstructionGeneral Contractor109/13/2026
Ace Group NYScaffold108/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Asr Engineering8404109/08/2026
Building Lifecycle
All (67)Filed (2)Permit Issued (2)Violation (60)Special Inspection (3)
10/14/2026
Violation issued (ECB, open)
Construction
10/14/2026
Violation issued (ECB, open)
Unknown
10/14/2026
Violation issued (ECB, open)
Unknown
09/11/2026
Permit issued — General Construction
B01446569-I1-GC
09/08/2026
Filed — Alteration
PROPOSED OF FRONT PARAPET WALL REPLACEMENT TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01446569-I1
08/21/2026
Filed — Alteration
B01447346-I1
08/21/2026
Permit issued — Sidewalk Shed
B01447346-I1-SH
08/17/2026
Special inspection requirement — Masonry
AKM RAHMAN
08/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
AKM RAHMAN
08/17/2026
Special inspection requirement — Final
AKM RAHMAN
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
A
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, open)
B
01/30/2026
Violation issued (HPD, closed)
B
01/09/2026
Violation issued (HPD, closed)
A
01/09/2026
Violation issued (HPD, closed)
B
01/02/2026
Violation issued (HPD, closed)
C
10/23/2025
Violation issued (HPD, closed)
C
08/11/2025
Violation issued (HPD, closed)
C
08/11/2025
Violation issued (HPD, closed)
C
08/11/2025
Violation issued (HPD, closed)
C
08/11/2025
Violation issued (HPD, closed)
C
06/20/2025
Violation issued (HPD, closed)
C
06/20/2025
Violation issued (HPD, closed)
C
06/14/2022
Violation issued (HPD, closed)
C
06/14/2022
Violation issued (HPD, closed)
C
06/14/2022
Violation issued (HPD, closed)
C
06/14/2022
Violation issued (HPD, closed)
C
06/14/2022
Violation issued (HPD, closed)
B
06/14/2022
Violation issued (HPD, closed)
A
06/14/2022
Violation issued (HPD, closed)
B
06/14/2022
Violation issued (HPD, closed)
A
06/14/2022
Violation issued (HPD, closed)
B
06/14/2022
Violation issued (HPD, closed)
B
06/14/2022
Violation issued (HPD, closed)
B
08/30/2021
Violation issued (HPD, closed)
B
08/30/2021
Violation issued (HPD, closed)
B
08/30/2021
Violation issued (HPD, closed)
B
12/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/19/2019
Violation issued (HPD, closed)
C
08/13/2019
Violation issued (HPD, closed)
B
08/13/2019
Violation issued (HPD, closed)
B
08/13/2019
Violation issued (HPD, closed)
B
08/13/2019
Violation issued (HPD, closed)
B
07/24/2019
Violation issued (HPD, closed)
C
07/24/2019
Violation issued (HPD, closed)
C
07/24/2019
Violation issued (HPD, closed)
C
03/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2018
Violation issued (HPD, closed)
A
02/11/2017
Violation issued (HPD, closed)
B
02/11/2017
Violation issued (HPD, closed)
B
01/14/2017
Violation issued (HPD, closed)
C
12/20/2016
Violation issued (HPD, closed)
B
12/20/2016
Violation issued (HPD, closed)
B
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUnique Restoration Construction09/11/2026
DOB NOWSidewalk ShedPermit IssuedAce Group NY08/21/2026
1 project · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026Permit IssuedHigh Quality Electric of NYC—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/17/2026MasonryAKM RAHMANspecial
08/17/2026Tenant Protection Plan ComplianceAKM RAHMANspecial
08/17/2026FinalAKM RAHMANprogress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
10/13/2026B01446569-I1Request digital key ↗
08/22/2026B01447346-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/14/2026B01446569-I1Open ↗
08/22/2026B01447346-I1Open ↗