← Back
Factory, industrial, semi-fireproof
1290 VIELE AVENUE
BRONX · BIN 2007013
💬 Discuss this project
1961Year Built
1Stories
F4Building Class
M3-1Zoning
40,000 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Factory, industrial, semi-fireproof · Owner of record: UNIFIRST CORPORATION · 58,000 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof7p · 4 filings · 20 docs
Floor 12p · 1 filing · 20 docs
Mezzanine43p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNIFIRST8607/08/2026
ARSENAL SCAFFOLD, INC503/22/2026
OPTIMUS CONSTRUCTION103/22/2026
SOL BUILDING CONSULTING SERVICES103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/03/2020$14.5M—ALLIED REALTY CO. LLC → UNIFIRST CORPORATION$362/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL BUILDING CONSULTING SERVICES L3703/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
AE DESIGN SOLUTION203/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OPTIMUS CONSTRUCTION&DEV*General Contractor2007/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor504/09/2026
D.D.S. MECH PBG&HTG CORPPlumbing407/08/2026
ETRICITY ELECTRICAL CO INElectrical203/22/2026
EAGLE SCAFFOLDING SVCS INCGeneral Contractor104/09/2026
DDS MECHANICAL FPS CORPFire Protection107/08/2026
AMERICAN SIGN ELECL CONScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4231604/14/2023
Building Lifecycle
All (207)Filed (28)Permit Issued (24)Signed Off (15)Violation (13)Inspection (17)Objection (80)Special Inspection (30)
06/27/2025
Signed off — Alteration
Erect illuminated accessory business wall sign for Unifirst.
X01172353-I1
03/14/2025
Permit issued — Sign
X01172353-I1-SG
03/10/2025
Filed — Alteration
Erect illuminated accessory business wall sign for Unifirst.
X01172353-I1
01/27/2025
Special inspection requirement — Final
SALVATOR CARADONNA
06/20/2023
Signed off — Alteration
Minor foundation and for new loading docks and entry and stab replacement. No change to use occupancy or egress.
X00604249-I1
05/16/2023
Signed off — Alteration
X00791287-I1
05/02/2023
Signed off — Alteration
Proposed site work associated with building renovations.
X00631479-I1
05/02/2023
Signed off — Alteration
X00692265-I1
05/02/2023
Signed off — Alteration
X08039935-I1
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/28/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/28/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/26/2023
Signed off — Alteration
INSTALL AN AUTOMATIC FIRE SPRINKLER SYSTEM THROUGHOUT THE BUILDING IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS, AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
X00553103-I1
04/26/2023
Permit issued — Foundation
X00604249-I1-FO
04/19/2023
Signed off — Alteration
Interior fitout for a new office including heating, cooling and ventilation. Providing exhaust for bathrooms, janitors closet, storage area and truck storage.
X00553355-I1
04/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
04/17/2023
Special inspection requirement — Fenestration air leakage
Young Suh
04/17/2023
Special inspection requirement — Interior lighting power
Young Suh
04/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
04/17/2023
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
04/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Young Suh
04/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
04/17/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Young Suh
04/14/2023
Filed — Alteration CO
CONVERT EMPTY WAREHOUSE INTO TRANSPORT FACILITY FOR CLOTHES. TRUCK STAGING/PARKING WITHIN THE BUILDING, WITH NEW MEZZANINE. CHANGE IN OCCUPANCY & EGRESS. AS PER PLANS FILED HEREWITH. DEMOLITION PLANS WERE FILED & APPROVED UNDER APPLICATION #X00457301.
X00490284-P3
04/12/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/12/2023
Special inspection requirement — Interior lighting power
Young Suh
04/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
04/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
04/12/2023
Special inspection requirement — Fenestration air leakage
Young Suh
04/12/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Young Suh
04/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
04/12/2023
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
04/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Young Suh
04/10/2023
Signed off — Alteration
New secondary framing for exterior wall openings, secondary structural for new dry cleaning hangers and structural support rooftop units.
X00604257-I1
04/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
04/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
04/08/2023
Special inspection requirement — Mechanical Systems
Young Suh
04/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
04/08/2023
Special inspection requirement — Final
Kenneth Fry
04/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
04/08/2023
Special inspection requirement — Ventilation and air distribution system
Young Suh
04/07/2023
Signed off — Alteration
Interior fit out of two bathrooms, janitors closet and break room sink. Miscellaneous area drains for the sprinkler room, loading docks and truck storage area. Gas piping for a new water heater and gas fired unit heaters.
X00553364-I1
03/31/2023
Filed — Alteration
Interior fitout for a new office including heating, cooling and ventilation. Providing exhaust for bathrooms, janitors closet, storage area and truck storage.
X00553355-P4
03/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
03/30/2023
Special inspection requirement — Ventilation and air distribution system
Young Suh
03/30/2023
Special inspection requirement — Final
Kenneth Fry
03/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/30/2023
Special inspection requirement — Mechanical Systems
Young Suh
03/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
03/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2023
Filed — Alteration
Minor foundation and for new loading docks and entry and stab replacement. No change to use occupancy or egress.
X00604249-P2
03/28/2023
Permit issued — Curb Cut
X08039935-I1-CC
03/28/2023
Permit issued — Curb Cut
X00692265-I1-CC
03/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/28/2023
Objection resolved — Addressed
02/20/2023
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X08048342-I1
02/16/2023
Filed — Alteration
Interior fit out of two bathrooms, janitors closet and break room sink. Miscellaneous area drains for the sprinkler room, loading docks and truck storage area. Gas piping for a new water heater and gas fired unit heaters.
X00553364-P2
02/16/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
Latest 60 of 207 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offAMERICAN SIGN & ELECL CON03/14/2025
DOB NOWFoundationSigned-offOPTIMUS CONSTRUCTION&DEV*04/26/2023
DOB NOWCurb CutSigned-offOPTIMUS CONSTRUCTION&DEV*03/28/2023
DOB NOWCurb CutSigned-offOPTIMUS CONSTRUCTION&DEV*03/28/2023
DOB NOWGeneral ConstructionPermit IssuedOPTIMUS CONSTRUCTION&DEV*02/02/2023
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP01/05/2023
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP12/16/2022
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP12/13/2022
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC12/02/2022
DOB NOWGeneral ConstructionPermit IssuedOPTIMUS CONSTRUCTION&DEV*11/29/2022
DOB NOWMechanical SystemsSigned-offOPTIMUS CONSTRUCTION&DEV*11/28/2022
DOB NOWStructuralSigned-offOPTIMUS CONSTRUCTION&DEV*11/28/2022
DOB NOWGeneral ConstructionSigned-offOPTIMUS CONSTRUCTION&DEV*11/02/2022
DOB NOWStructuralSigned-offEAGLE SCAFFOLDING SVCS IN09/21/2022
DOB NOWFoundationSigned-offOPTIMUS CONSTRUCTION&DEV*02/14/2022
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP12/20/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC12/06/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC12/06/2021
DOB NOWStructuralSigned-offOPTIMUS CONSTRUCTION&DEV*12/02/2021
DOB NOWMechanical SystemsSigned-offOPTIMUS CONSTRUCTION&DEV*12/01/2021
DOB NOWGeneral ConstructionPermit IssuedOPTIMUS CONSTRUCTION&DEV*11/30/2021
DOB NOWGeneral ConstructionSigned-offOPTIMUS CONSTRUCTION&DEV*05/25/2021
DOB NOWMechanical SystemsSigned-offOPTIMUS CONSTRUCTION&DEV*05/25/2021
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP05/25/2021
5 projects · most recent 03/18/2025
General Wiring
FiledStatusContractorScope
03/18/2025CompletePROFF ELECTRICAL LLC—
01/06/2023CompleteETRICITY ELECTRICAL CO INGeneral Wiring
01/06/2023CompleteETRICITY ELECTRICAL CO INGeneral Wiring
12/10/2021CompleteRONEY ELECTRIC INC—
05/23/2021CompleteETRICITY ELECTRICAL CO IN—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/28/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
04/28/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/12/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/16/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/13/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
02/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/04/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/12/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/04/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
01/27/2025FinalSALVATOR CARADONNAprogress
04/17/2023Fenestration air leakageYoung Suhenergy_progress
04/17/2023Interior lighting powerYoung Suhenergy_progress
04/17/2023Fenestration and door U-factor and product ratingsYoung Suhenergy_progress
04/17/2023Fire-Resistance Rated ConstructionYoung Suhprogress
04/17/2023Energy Code Compliance InspectionsYoung Suhprogress
04/17/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
04/17/2023Wall Panels, Curtain Walls, and VeneersYoung Suhspecial
04/17/2023Sprayed fire-resistant materialsYoung Suhspecial
04/12/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
04/12/2023Interior lighting powerYoung Suhenergy_progress
04/12/2023Fenestration and door U-factor and product ratingsYoung Suhenergy_progress
04/12/2023Fenestration air leakageYoung Suhenergy_progress
04/12/2023Fire-Resistance Rated ConstructionYoung Suhprogress
04/12/2023Energy Code Compliance InspectionsYoung Suhprogress
04/12/2023Wall Panels, Curtain Walls, and VeneersYoung Suhspecial
04/12/2023Sprayed fire-resistant materialsYoung Suhspecial
04/08/2023Ventilation and air distribution systemYoung Suhenergy_progress
04/08/2023HVAC-R and service water heating system controlsYoung Suhenergy_progress
04/08/2023HVAC-R and service water piping design and insulationYoung Suhenergy_progress
04/08/2023HVAC-R and service water heating equipmentYoung Suhenergy_progress
04/08/2023FinalKenneth Fryprogress
04/08/2023Energy Code Compliance InspectionsYoung Suhprogress
04/08/2023Mechanical SystemsYoung Suhspecial
03/30/2023HVAC-R and service water heating equipmentYoung Suhenergy_progress
Latest 25 of 72.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch25
08/25/2026X00553364-P2Request digital key ↗
08/25/2026X00553364-P1Request digital key ↗
08/25/2026X00553355-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00457668-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00458444-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026X00457301-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
12/02/2022240308715Open ↗
11/30/2022240308715Open ↗
11/28/2022240308715Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
06/21/2023240308715Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/22/2022240308715Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00490284-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/25/2026X00457668-I1Open ↗
08/25/2026X00457301-I1Open ↗
08/25/2026X00458444-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026X00604249-P2Open ↗
09/23/2026X00604249-P2Open ↗
09/20/2026X00604257-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026X00604249-P2Open ↗
09/20/2026X00604257-I1Open ↗
09/02/2026X00490284-I1Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/15/2021240308715Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/13/2026X00490284-P2Open ↗
08/13/2026X00490284-P3Open ↗
08/13/2026X00490284-P1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
11/23/2022240308715Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00490284-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00490284-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00490284-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/25/2026X00457668-I1Open ↗
08/25/2026X00458444-I1Open ↗
08/25/2026X00553364-P2Open ↗
Showing 3 of 22 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00553355-I1Open ↗
08/13/2026X00490284-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
06/21/2023240308715Open ↗
▸BISBPP: FIELD INSPECTION1
06/21/2023240308715Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026X00604249-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/21/2023240308715Open ↗
▸Cost, Insurance & Ownership2
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
06/21/2023240308715Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
06/21/2023240308715Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/21/2023240308715Open ↗
06/21/2023240308715Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/15/2021240308715Open ↗
▸Other Documents7
▸DOB NOWLowest Floor Elevation Plan2
08/23/2026X00604249-I1Open ↗
08/15/2026X00490284-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/13/2026X00457301-I1Open ↗
08/13/2026X00457668-I1Open ↗
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
06/21/2023240308715Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/21/2023240308715Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00490284-I1Open ↗