DOB08/17/2026OBSERVED MULTIPLE UNIDENTIFIED WORKERS (<7 INDIVIDUALS) ENTERING AND EXITING PROPERTY MULTIPLE TIMES WITH TOOLS AND MATERIALS. DRILLING, HAMMERING AND CONSTRUCTION DEBRIS HEARD AND SEEN AT PROPERTY. VIOLATION ISSUED FOR UNLAWFULLY CONTINUING WORK WHILE ON STOP WORK ORDER.
ECB08/03/2026ATOI OBSERVED MISCELLANEOUS CONSTRUCTION DEBRIS AT THE REAR OF PROPERTY EXP 3. DEBRIS COMPOSED OF WOOD, PLYWOOD, AND OTHER COMBUSTIBLE CONTRUCTION MATERIALS. THIS CAN CREATE HAZARDOUS CONDITION TO ADJACENT PROP$2K due
ECB07/14/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE 3(REAR) AT FACADE 3RD FLOOR WINDOW MISSING SECTIONS OF MASONRY, VERTICAL CRACK & SPALLING, BALCONY NETTING LOOSE$1K due
ECB07/14/2026TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON SITE EXPIRED PERMIT. NOTED PERMIT# B01238163-S2-FN EXPIRED ON 07/06/2026., RENEW PERMIT$1K due
ECB04/15/2025OBSERVED CONSTRUCTION OPERATION IN PROGRESS AT REAR OF PREMISES ( EXPOSURE#3) WITH VERTICAL UNPROTECTED REBARS AND OPEN EXCAVATION APPROX. 6FT (DEEP)WITH IN ADEQUATE BRACING / UNGAURDED, CREATING A HAZARDOUS CO$12K due
DOB04/07/2025OBSERVED CONSTRUCTION OPERATION IN PROGRESS AT REAR OF PREMISES ( EXPOSURE#3) WITH VERTICAL UNPROTECTED REBARS AND OPEN EXCAVATION APPROX. 6FT (DEEP)WITH IN ADEQUATE BRACING / UNGAURDED, CREATING A HAZARDOUS CONDITION.
ECB06/16/2026ATOI 12:30PM. OBSERVED 2 SPLIT UNITS INSTALLED IN THE ROOF OF UNPERMITTED HORIZONTAL AND VERTICAL STRUCTURE. SPLIT UNIT IS INSTALLED AT TOP OF DUNNAGE. ELECTRICAL WORK IS HAZARDOUS CAN CREATE FIRE, IF IMPROPERLHearing held — result not yet published$2K proposed
ECB06/16/2026ATOI OBSERVED ADDITIONAL FLOOR HAS BEEN ADDED IN THE PROPERTY WHILE ON NOTICE OF FSWO. APPROX SIZE TO ADDED STRUCTURE IS 10'H X 10'W X 30'L. UNPERMITTED STRUCTURE IS 70% COMPLETED. NOTICE AS WELL INSTALLATION OHearing held — result not yet published$10K proposed