Two family brick
1293 MYRTLE AVENUE
BROOKLYN · BIN 3073410
💬 Discuss this project
2008Year Built
3Stories
B1Building Class
R6Zoning
2,100 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · 1,014 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KL DUOZ252107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.605/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL BOROUGH GROUP SVC INCGeneral Contractor307/08/2026
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613505/09/2022
Building Lifecycle
All (61)Filed (6)Permit Issued (4)Signed Off (4)Violation (3)Inspection (6)Objection (10)Special Inspection (28)
11/25/2024
Violation issued (ECB, open)
Construction
05/20/2022
Signed off — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00548342. INSTALL 1 COMBI-BOILER, 1 FLOOR DRAIN, 1 KITCHEN & 1 BATHROOM ON 2ND & 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00548355-I1
05/20/2022
Signed off — Alteration
RENOVATE CELLAR, 1ST, 2ND & 3RD FLOOR FOR AN EXISTING 3 STORY, 2 FAMILIES MIXED-USE BUILDING. NEW PARTITION, WINDOW & DOOR WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNOW # B00548355. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00548342-I1
05/13/2022
Special inspection requirement — Interior lighting power
Fran Huang
05/13/2022
Special inspection requirement — Air barrier - visual inspection
Fran Huang
05/13/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
05/13/2022
Special inspection requirement — Fenestration areas
Fran Huang
05/13/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
05/13/2022
Special inspection requirement — Permanent certificate
Fran Huang
05/13/2022
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
05/13/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
05/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
05/13/2022
Special inspection requirement — Final
Fran Huang
05/11/2022
Objection raised — Other
05/11/2022
Objection resolved — Addressed
05/09/2022
Filed — Alteration
RENOVATE CELLAR, 1ST, 2ND & 3RD FLOOR FOR AN EXISTING 3 STORY, 2 FAMILIES MIXED-USE BUILDING. NEW PARTITION, WINDOW & DOOR WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNOW # B00548355. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00548342-P1
05/09/2022
Special inspection requirement — Fenestration areas
Fran Huang
05/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
05/09/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
05/09/2022
Special inspection requirement — Final
Fran Huang
05/09/2022
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
05/09/2022
Special inspection requirement — Air barrier - visual inspection
Fran Huang
05/09/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
05/09/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
05/09/2022
Special inspection requirement — Permanent certificate
Fran Huang
05/09/2022
Special inspection requirement — Interior lighting power
Fran Huang
04/27/2022
Signed off — Alteration
INSTALL 8' HIGH CONSTRUCTION WOOD FENCE IN-CONJUNCTION WITH DOBNOW JOB # B00548342.
B00619972-I1
04/27/2022
Signed off — Alteration
FILE BOILER WORK IN-CONJUNCTION WITH DOBNOW PL JOB#: B00548355 & GC JOB # B00548342. INSTALL 1 NEW COMBI-BOILER ON 2ND & 3RD FLOOR FOR APARTMENT USE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00711182-I1
04/15/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/12/2022
Permit issued — Boiler Equipment
B00711182-I1-BE
04/05/2022
Filed — Alteration
FILE BOILER WORK IN-CONJUNCTION WITH DOBNOW PL JOB#: B00548355 & GC JOB # B00548342. INSTALL 1 NEW COMBI-BOILER ON 2ND & 3RD FLOOR FOR APARTMENT USE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00711182-I1
04/01/2022
Special inspection requirement — Heating Systems
Fran Huang
03/30/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/29/2022
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00548342. INSTALL 1 COMBI-BOILER, 1 FLOOR DRAIN, 1 KITCHEN & 1 BATHROOM ON 2ND & 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00548355-P1
03/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
03/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
03/29/2022
Special inspection requirement — Maintenance information
Fran Huang
03/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
03/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
03/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
03/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/29/2021
Permit issued — Construction Fence
B00619972-I1-FN
10/28/2021
Permit issued — Plumbing
B00548355-I1-PL
10/27/2021
Filed — Alteration
INSTALL 8' HIGH CONSTRUCTION WOOD FENCE IN-CONJUNCTION WITH DOBNOW JOB # B00548342.
B00619972-I1
10/27/2021
Permit issued — General Construction
B00548342-I1-GC
10/27/2021
Special inspection requirement — Final
Fran Huang
10/22/2021
Objection resolved — Addressed
10/22/2021
Objection resolved — Addressed
08/02/2021
Objection raised — Structural
08/02/2021
Objection raised — Mechanical
07/28/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B00548342. INSTALL 1 COMBI-BOILER, 1 FLOOR DRAIN, 1 KITCHEN & 1 BATHROOM ON 2ND & 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00548355-I1
07/28/2021
Objection resolved — Addressed
07/28/2021
Objection resolved — Addressed
07/02/2021
Objection raised — Scope
07/02/2021
Objection raised — Scope
06/30/2021
Filed — Alteration
RENOVATE CELLAR, 1ST, 2ND & 3RD FLOOR FOR AN EXISTING 3 STORY, 2 FAMILIES MIXED-USE BUILDING. NEW PARTITION, WINDOW & DOOR WORK AS PER PLAN SUBMITTED. PLUMBING WORK TO BE FILED UNDER DOBNOW # B00548355. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00548342-I1
11/11/1997
Violation issued (ECB, closed)
Construction
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offT & T PLUMBING INC04/12/2022
DOB NOWConstruction FenceSigned-offALL BOROUGH GROUP SVC INC10/29/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/28/2021
DOB NOWGeneral ConstructionSigned-offALL BOROUGH GROUP SVC INC10/27/2021
BISOTISSUEDN\A10/28/2005
1 project · most recent 12/08/2021
General Wiring
FiledStatusContractorScope
12/08/2021CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/15/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/13/2022Interior lighting powerFran Huangenergy_progress
05/13/2022Air barrier - visual inspectionFran Huangenergy_progress
05/13/2022Fenestration and door U-factor and product ratingsFran Huangenergy_progress
05/13/2022Fenestration areasFran Huangenergy_progress
05/13/2022Fenestration air leakageFran Huangenergy_progress
05/13/2022Permanent certificateFran Huangenergy_progress
05/13/2022Fire-Resistance Rated ConstructionFran Huangprogress
05/13/2022Energy Code Compliance InspectionsFran Huangprogress
05/13/2022Fire-Resistant Penetrations and JointsFran Huangspecial
05/13/2022FinalFran Huangprogress
05/09/2022Fenestration areasFran Huangenergy_progress
05/09/2022Fire-Resistant Penetrations and JointsFran Huangspecial
05/09/2022Energy Code Compliance InspectionsFran Huangprogress
05/09/2022FinalFran Huangprogress
05/09/2022Fire-Resistance Rated ConstructionFran Huangprogress
05/09/2022Air barrier - visual inspectionFran Huangenergy_progress
05/09/2022Fenestration and door U-factor and product ratingsFran Huangenergy_progress
05/09/2022Fenestration air leakageFran Huangenergy_progress
05/09/2022Permanent certificateFran Huangenergy_progress
05/09/2022Interior lighting powerFran Huangenergy_progress
04/01/2022Heating SystemsFran Huangspecial
03/29/2022Fire-Resistant Penetrations and JointsFran Huangspecial
03/29/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
03/29/2022Maintenance informationFran Huangenergy_progress
03/29/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
Latest 25 of 28.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00548355-I1Request digital key ↗
09/01/2026B00548355-P1Request digital key ↗
08/31/2026B00619972-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature24
08/28/2026B00548342-I1Open ↗
08/28/2026B00548342-I1Open ↗
08/28/2026B00548342-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00548342-I1Open ↗
09/01/2026B00548342-P1Open ↗
09/01/2026B00548355-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00711182-I1Open ↗
08/28/2026B00548342-I1Open ↗
08/26/2026B00548355-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00548355-P1Open ↗
09/01/2026B00548355-I1Open ↗
08/15/2026B00548342-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00548342-I1Open ↗
08/13/2026B00548355-I1Open ↗