← Back
BuildNYC
Over six families without stores
1296 NEW YORK AVENUE
BROOKLYN · BIN 3428918
💬 Discuss this project
2022Year Built
4.5Stories
C1Building Class
R6Zoning
6,094 sfGross Floor Area
9Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1296-1298 Nya · 2,028 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing and natural gas work43p · 4 filings · 20 docs
PenthousePlumbing and natural gas work47p · 4 filings · 20 docs
Floor 4Plumbing and natural gas work47p · 4 filings · 20 docs
Floor 3Plumbing and natural gas work42p · 4 filings · 20 docs
Floor 2Plumbing and natural gas work44p · 4 filings · 20 docs
Floor 1Plumbing and natural gas work43p · 5 filings · 20 docs
CellarPlumbing and natural gas work49p · 6 filings · 20 docs
Site & exteriorSidewalk shed and pipe scaffold12p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2288 Atlantic3007/08/2026
Cavu Property Group1107/08/2026
1296 NY Ave503/21/2026
1296-1298 Nya303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2021$1.5M—1296 NY AVE LLC → 1296-1298 NYA LLC— not available
09/05/2019$1.3M—AOF HOLDINGS LLC → 1296 NY AVE LLC— not available
05/29/2019$310K—Private party → AOF HOLDINGS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M Engineering Design & Inspection109/09/2022
Christies307/13/2022
Chosen MEP607/01/2022
Christie Engineering104/28/2022
Revap Consulting Engineers106/10/2020
Walter Hollien Architect104/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ellipses Design603/21/2026
Advanced Builders Services503/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & Y DevelopersGeneral Contractor1507/08/2026
M & Y DevelopersScaffold807/08/2026
Manhattan D EnterprisesScaffold407/08/2026
Rightway Plumbing and HeatingFire Protection207/08/2026
Power Direct ElectricElectrical103/22/2026
Master InsideGeneral Contractor103/22/2026
Best Mechanical ServicesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616607/13/2022
Building Lifecycle
09/23/2025
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE…
HPD violation · open
09/23/2025
§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE…
HPD violation · open
09/23/2025
§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY…
HPD violation · open
05/12/2023
Signed off — Alteration
B00754104-I1
05/10/2023
Signed off — Alteration
MECHANICAL APPLICATION HEREBY FILED IN CONJUNCTION TO NB #321588224.
B00342919-I1
69 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offM & Y Developers05/09/2023
DOB NOWMechanical SystemsSigned-offM & Y Developers04/24/2023
DOB NOWSprinklersSigned-offRightway Plumbing and Heating11/03/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises09/12/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises09/12/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating07/15/2022
DOB NOWPlumbingSigned-offBest Mechanical Services07/13/2022
DOB NOWEarth WorkSigned-offM & Y Developers05/13/2022
DOB NOWSupport of ExcavationSigned-offM & Y Developers05/12/2022
DOB NOWConstruction FenceSigned-offM & Y Developers05/10/2022
DOB NOWConstruction FenceSigned-offM & Y Developers04/07/2022
DOB NOWConstruction FenceSigned-offM & Y Developers07/17/2020
DOB NOWConstruction FenceSigned-offM & Y Developers06/12/2020
BIS—ISSUEDM & Y Developers05/10/2022
BIS—ISSUEDM & Y Developers04/18/2022
3 projects · most recent 04/03/2023
General Wiring
FiledStatusContractorScope
04/03/2023CompletePower Direct Electric—
01/04/2023CompletePower Direct ElectricGeneral Wiring
09/13/2022CompleteSolas Electrical—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
07/12/2022Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
07/05/2022Post-installed AnchorsFAHAD FATEHspecial
07/05/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/05/2022Sprinkler SystemsFAHAD FATEHspecial
07/05/2022Seismic Isolation SystemsFAHAD FATEHspecial
07/01/2022Fire-Resistant Penetrations and Joints—special
07/01/2022Post-installed Anchors—special
07/01/2022Seismic Isolation Systems—special
06/28/2022Sprinkler Systems—special
06/02/2020Maintenance information—energy_progress
06/02/2020HVAC and service water heating system controls —energy_progress
06/02/2020HVAC insulation and sealing —energy_progress
06/02/2020Electrical energy consumption—energy_progress
06/02/2020Fire-Resistant Penetrations and Joints—special
06/02/2020Heating Systems—special
06/02/2020Mechanical Systems—special
06/02/2020Final—progress
06/02/2020Energy Code Compliance Inspections—progress
06/02/2020Fire-Resistance Rated Construction—progress
06/02/2020HVAC and service water heating equipment —energy_progress
132 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account