HPD11/02/2026§ 27-2005 ADM code & 309 m/d law abate the nuisance consisting of water leak at boiler at boiler room
HPD05/19/2026§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHROOM AND IN THE KITCHEN LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/19/2026§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHROOM AND IN THE KITCHEN LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/11/2026§ 27-2033 ADM code provide ready access to buildings heating system celler door locked leadind to boiler room at boiler room
HPD05/11/2026§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
ECB04/29/2026Failure to maintain building appurtenances. Noted: metal rolldown gate observed defective. Gate in open position & chain wrapped around motor casing to prevent it from inadvertently closing& trapping someone in$5K due
HPD07/02/2025§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS WALLS DOORS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
HPD05/08/2025§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT NORTH , SOUTH AND WEST WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''west''
HPD05/08/2025§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER COUNTER BALANCE AT 2ND WINDOW FROM SOUTH IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''west''
HPD05/08/2025§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''west''
ECB07/25/2022Note: observed sidewalk shed at EXP1,2 have missing screw caps several area creating sharp edge (3307.6.5.6) & cut hazard for pedestrian ; loose/open cross bracing creating unsafe(3307.6.5.1) or collapse hazard$2K due
ECB07/27/2020Failure to maintain building exterior walls/facade and appurtenances:at the time of inspections observed defected conditions at various exposures. Exposure 1 west elevations. Broken window pane at 5 fl and 4 fl$630 due
HPD03/21/2019HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4I, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD03/21/2019HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4I, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
ECB07/28/2021Failure to maintain building in code-compliant manner. At time of inspection, observed, in the rear of the building retaining wall have lots of vertical, step and horizontal big cracks and is in a state of disrNothing owed — awaiting certificate of correction
ECB12/07/2020Failure to maintain buildings exterior walls/facade and appurtenances.note:at the time of inspections view at exposure 1 west elevation crack and step crack deteriorating and damaged joints. Exposure 3 cracks,bNothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB11/14/2025Violation issued-failure to file 2024 external low pressure inspectionAnswered on the city's records: a 2024 boiler inspection report was accepted (Apr 21, 2024)
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB02/22/2023Failed to file FISP cycle 9B technical report by 2/21/2023Issued 2023; DOB's record still lists it as active
DOB12/15/2022Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09Issued 2022; DOB's record still lists it as active
DOB10/27/2021Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2021; DOB's record still lists it as active
DOB08/12/2021A) provide immediate temporary stabilization of the stone rw along ent ire length of the rear of the building(along the NYC parks property)(b provide temporary fencing delineating safe egress pathway from fire- escapes to the public right-away(c)partial demolition of stone rwalong rear top corner of exp'S2&3.(d)remove all trees growing outof rw wallsIssued 2021; DOB's record still lists it as active
DOB07/26/2021Emergency work. Owner is directed to immed retain a lic structural engineer to provide stabilization and reconstruction dwgs regarding the defective r/w located at the rear of the bldg adj to 1291 grant ave park. S/s stabilization sketches to be provided by aug. 6, 2021 file and permit work with 48 hrs of commencing workIssued 2021; DOB's record still lists it as active
DOB01/31/2019Failed to file FISP cycle 8B technical report by 02/21/2018Issued 2019; DOB's record still lists it as active