← Back
Predominantly retail with other uses
1297 CLOVE ROAD
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5015448
💬 Discuss this project
1980Year Built
2Stories
K4Building Class
R2Zoning
3,800 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: JP LAMA HOLDINGS LLC · 4,000 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 6 docs
Floor 212p · 3 filings · 20 docs
Floor 112p · 3 filings · 20 docs
Cellar13p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANSELMO S. GENOVESE ARCHITECT PC507/28/2023
PERMANENT ENGINEERING P.C.112/30/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEMSTAR CONSTRUCTION CORP.General Contractor403/21/2026
SCARAN OIL SERVICE INCGeneral Contractor107/08/2026
MPC PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANSELMO S. GENOVESE ARCHI2377507/28/2023
C.M. TESTING LABORATORY,1352307/28/2023
RELIANCE ENGINEERING, P.C322112/30/2022
Building Lifecycle
All (43)Filed (6)Permit Issued (4)Signed Off (2)Violation (2)Inspection (6)Objection (12)Special Inspection (11)
12/17/2025
Violation issued (FDNY_NOV, closed)
10/20/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/13/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/28/2023
Filed — Alteration CO
AS PER CONSTRUCTION INSPECTOR'S COMMENTS PLANS SUBMITTED HEREWITH HAVE BEEN REVISED TO SHOW REVISED FIRST FLOOR TOILET DOOR SWING AND SHOW EXISTING BARBED WIRE FENCE ON PARAPET PAGES A-002.02, & A-004.02
S00637088-P2
06/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/31/2023
Filed — Alteration CO
AS PER CONSTRUCTION INSPECTOR'S COMMENTS PLANS SUBMITTED HEREWITH HAVE BEEN REVISED TO SHOW REVISED FIRST FLOOR TOILET DOOR SWING AND SHOW EXISTING BARBED WIRE FENCE ON PARAPET PAGES A-002.02, & A-004.02
S00637088-P1
05/02/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/21/2023
Signed off — Alteration
AMENDMENT FILED FOR PLUMBING FIXTURE CHANGES
S00637007-I1
04/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2023
Permit issued — General Construction
S00637088-I1-GC-CX
02/21/2023
Signed off — Alteration
S08049076-I1
01/25/2023
Permit issued — General Construction
S08049076-I1-GC-CX
12/30/2022
Filed — Alteration
S08049076-I1
12/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/14/2022
Filed — Alteration
AMENDMENT FILED FOR PLUMBING FIXTURE CHANGES
S00637007-P1
12/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anselmo Genovese
12/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anselmo Genovese
12/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anselmo Genovese
12/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anselmo Genovese
12/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Ralph Giorgio
12/03/2022
Special inspection requirement — Preliminary
Ralph Giorgio
12/03/2022
Special inspection requirement — Final
Ralph Giorgio
12/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ralph Giorgio
12/03/2022
Special inspection requirement — Maintenance information
Ralph Giorgio
12/03/2022
Special inspection requirement — Heating Systems
Ralph Giorgio
12/03/2022
Special inspection requirement — Mechanical Systems
Ralph Giorgio
06/15/2022
Permit issued — Plumbing
S00637007-I1-PL
06/14/2022
Permit issued — Foundation
S00637088-I1-GC-CX
05/12/2022
Filed — Alteration
AMENDMENT FILED FOR PLUMBING FIXTURE CHANGES
S00637007-I1
02/01/2022
Objection raised — Scope
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Accessibility
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Inspections
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Accessibility
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Accessibility
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Accessibility
02/01/2022
Objection resolved — Addressed
12/22/2021
Filed — Alteration CO
AS PER CONSTRUCTION INSPECTOR'S COMMENTS PLANS SUBMITTED HEREWITH HAVE BEEN REVISED TO SHOW REVISED FIRST FLOOR TOILET DOOR SWING AND SHOW EXISTING BARBED WIRE FENCE ON PARAPET PAGES A-002.02, & A-004.02
S00637088-I1
10/15/1997
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGEMSTAR CONSTRUCTION CORP.03/17/2023
DOB NOWGeneral ConstructionSigned-offSCARAN OIL SERVICE INC01/25/2023
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN06/15/2022
DOB NOWFoundationPermit IssuedGEMSTAR CONSTRUCTION CORP.06/14/2022
BISOTISSUEDMAD SIGNS INC05/04/2004
BISPLISSUEDS.B.A. PLUMBING CORP01/30/2004
BISOTISSUEDFEDERAL CODE CONSULTING INC04/04/2002
BISMHISSUEDNATU'RAL HAIR REPLACEMENT12/24/1997
1 project · most recent 11/29/2022
General Wiring
FiledStatusContractorScope
11/29/2022CompletePLAZA ELEC'L CONTR'S. INCGeneral Wiring
1 project · most recent 07/28/2023
Steel Wood
FiledStatusContractorScope
07/28/2023Permit IssuedGEMSTAR CONSTRUCTION CORPSteel, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/13/2023Fail-Final CND-Occupancy InspectionFailView ↗
06/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2023Fail-Final CND-Occupancy InspectionFailView ↗
04/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
12/14/2022Fire-Resistant Penetrations and JointsAnselmo Genovesespecial
12/14/2022HVAC-R and service water piping design and insulationAnselmo Genoveseenergy_progress
12/14/2022Fire-Resistant Penetrations and JointsAnselmo Genovesespecial
12/14/2022HVAC-R and service water piping design and insulationAnselmo Genoveseenergy_progress
12/03/2022Energy Code Compliance InspectionsRalph Giorgioprogress
12/03/2022PreliminaryRalph Giorgioprogress
12/03/2022FinalRalph Giorgioprogress
12/03/2022HVAC-R and service water heating equipmentRalph Giorgioenergy_progress
12/03/2022Maintenance informationRalph Giorgioenergy_progress
12/03/2022Heating SystemsRalph Giorgiospecial
12/03/2022Mechanical SystemsRalph Giorgiospecial
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00637007-I1Request digital key ↗
08/24/2026S00637007-P1Request digital key ↗
08/23/2026S08049076-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION6
06/15/2023500685127Open ↗
06/15/2023500685127Open ↗
06/15/2023500685118Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00637088-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026S00637007-I1Open ↗
08/24/2026S00637007-P1Open ↗
08/23/2026S00637088-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026S08049076-I1Open ↗
08/28/2026S08049076-I1Open ↗
08/26/2026S00637007-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026S08049076-I1Open ↗
08/26/2026S00637007-I1Open ↗
08/26/2026S00637007-P1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026S00637088-I1Open ↗
08/13/2026S00637088-P2Open ↗
08/13/2026S00637088-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026S00637007-P1Open ↗
08/24/2026S00637007-I1Open ↗
08/23/2026S00637088-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026S08049076-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026S00637088-I1Open ↗
08/13/2026S00637007-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLetter from Homeowner for Withdrawal6
06/15/2023500685127Open ↗
06/15/2023500685118Open ↗
06/08/2023500520509Open ↗
Showing 3 of 6 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/23/2026S00637088-P2Open ↗
08/23/2026S00637088-P1Open ↗
08/14/2026S00637088-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00637088-I1Open ↗