← Back
BuildNYC
Over six families without stores
1298 NEW YORK AVENUE
BROOKLYN · BIN 3428709
💬 Discuss this project
2022Year Built
4.5Stories
C1Building Class
R6Zoning
6,093 sfGross Floor Area
9Units
Rent Stabilized11 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1296-1298 Nya · 2,028 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential building with cellar55p · 4 filings · 17 docs
PenthouseResidential building with cellar56p · 3 filings · 15 docs
Floor 4Residential building with cellar56p · 3 filings · 15 docs
Floor 3Residential building with cellar52p · 3 filings · 15 docs
Floor 2Residential building with cellar54p · 3 filings · 15 docs
Floor 1Residential building with cellar55p · 4 filings · 20 docs
CellarResidential building with cellar61p · 5 filings · 20 docs
Site & exteriorSidewalk shed and pipe scaffolding12p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cavu Property Group1307/08/2026
2288 Atlantic1307/08/2026
1296 NY Ave403/21/2026
1296-1298 Nya103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M Engineering Design & Inspection109/09/2022
Chosen MEP307/01/2022
Christies206/13/2022
Walter Hollien Architect105/19/2022
Christie Engineering104/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ellipses Design403/21/2026
Advanced Builders Services303/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & Y DevelopersGeneral Contractor1607/08/2026
Manhattan D EnterprisesScaffold407/08/2026
M & Y DevelopersScaffold303/21/2026
Best Mechanical ServicesPlumbing207/08/2026
Rightway Plumbing and HeatingFire Protection207/08/2026
Master InsideGeneral Contractor103/22/2026
Tafadzwa MwandiambiraElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616507/01/2022
Building Lifecycle
05/12/2023
Signed off — Alteration
B00754137-I1
05/10/2023
Signed off — Alteration
B00374396-I1
05/08/2023
Permit issued — Structural
B00754137-I1-ST
05/01/2023
Signed off — Alteration
PLUMBING AND SPRINKLER APPLICATION HEREBY FILED IN CONJUNCTION TO NB #321588233.
B00374420-I1
04/24/2023
Permit issued — Mechanical Systems
B00374396-I1-MS
48 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offM & Y Developers05/08/2023
DOB NOWMechanical SystemsSigned-offM & Y Developers04/24/2023
DOB NOWSprinklersSigned-offRightway Plumbing and Heating11/02/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises09/12/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises09/12/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating07/29/2022
DOB NOWPlumbingSigned-offBest Mechanical Services07/29/2022
DOB NOWFoundationSigned-offM & Y Developers06/08/2022
DOB NOWConstruction FenceSigned-offM & Y Developers05/24/2022
DOB NOWSupport of ExcavationSigned-offM & Y Developers05/13/2022
DOB NOWFoundationSigned-offM & Y Developers05/13/2022
BIS—ISSUEDM & Y Developers06/03/2022
3 projects · most recent 04/03/2023
General Wiring
FiledStatusContractorScope
04/03/2023CompletePower Direct ElectricGeneral Wiring
09/13/2022CompleteSolas Electrical—
09/02/2022CompletePower Direct Electric—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/22/2022Seismic Isolation SystemsFAHAD FATEHspecial
07/22/2022Sprinkler SystemsFAHAD FATEHspecial
07/22/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/22/2022Post-installed AnchorsFAHAD FATEHspecial
07/22/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/22/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
06/13/2022Structural Steel - DetailsFAHAD FATEHspecial
06/08/2022FinalFAHAD FATEHprogress
06/08/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
06/08/2022MasonryFAHAD FATEHspecial
06/08/2022Structural Cold-Formed SteelFAHAD FATEHspecial
06/08/2022Subgrade InspectionsFAHAD FATEHspecial
04/26/2022Subgrade InspectionsFAHAD FATEHspecial
04/26/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
03/21/2022FinalFAHAD FATEHprogress
03/21/2022Footing and FoundationFAHAD FATEHprogress
126 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account