1299 Third Avenue, Manhattan: 26 DOB NOW job filings; 52 work permits (5 open, 47 signed off). Most recent permit issued 2026-01-29.
| Design firm | Discipline | Jobs at this building |
|---|---|---|
| Paul Perdek, Prof. Eng. PLLC | Structural | 4 |
| Baileys Engineering PC | Structural | 2 |
| Gea Consulting Engineers | MEP | 2 |
| Lombardo Professional Engineering | 2 | |
| Tohfaz Uddin PE PC | General Engineering | 2 |
| Cosentini Associates | MEP | 1 |
| Doka USA | 1 | |
| Engineering Inspection Services, PC | 1 |
| Business | Jobs at this building |
|---|---|
| Rockledge Scaffold Corp. | 4 |
| Press Builders Inc. | 3 |
| Tri Borough Scaffolding | 3 |
| Kg Sprinkler Corp. | 2 |
| Pioneer Window Mfg Corp. | 2 |
| Core Scaffold Systems Inc. | 2 |
| Nova Construction Service | 1 |
| Donato, Inc. | 1 |
Latest 25 of 52 permits.
| Issued | Work type | Status | Business | Description |
|---|---|---|---|---|
| 2026-01-29 | General Construction | Signed-off | Nova Construction Service | APT 3(PH) - MINOR PARTITIONS ON THE 31ST FLOOR FOR NEW CLOSET |
| 2026-01-21 | Sidewalk Shed | Signed-off | Rockledge Scaffold Corp. | HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| 2025-11-14 | Suspended Scaffold | Permit Issued | Pioneer Window Mfg Corp. | INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. |
| 2025-09-18 | Construction Fence | Signed-off | Rockledge Scaffold Corp. | INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR… |
| 2025-07-29 | Supported Scaffold | Signed-off | Rockledge Scaffold Corp. | TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| 2025-07-23 | Sprinklers | Signed-off | Kg Sprinkler Corp. | SPRINKLER WORK IN CONJUNCTION WITH NB CONSTRUCTION. NB FILED UNDER #121187964. |
| 2025-06-30 | General Construction | Signed-off | Press Builders Inc. | THIS APPLICATION FILED HEREWITH FOR A TEMPORARY USE PERMIT FOR MODEL APARTMENTS ON THE 5TH FLOOR (UNIT 5C) PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002.… |
| 2025-06-27 | General Construction | Signed-off | Precise Construction Conr | INSTALLATION OF SPYDER CRANE IN CONJUNCTION WITH NB 121187964. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| 2025-06-10 | Sprinklers | Signed-off | Kg Sprinkler Corp. | SPRINKLER/STANDPIPE WORK IN CONJUNCTION WITH NB CONSTRUCTION. NB FILED UNDER #121187964. |
| 2025-05-16 | Supported Scaffold | Signed-off | Rockledge Scaffold Corp. | TEMPORARY SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER TH… |
| 2025-05-06 | Protection and Mechanical Methods | Signed-off | Rockledge Scaffold Corp. | TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJACENT PROPERTIES AS PER DRAWINGS DURING NB CONST, FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC… |
| 2025-04-16 | Supported Scaffold | Signed-off | Core Scaffold Systems Inc. | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 2025-03-28 | General Construction | Signed-off | Press Builders Inc. | THIS APPLICATION FILED HEREWITH FOR A TEMPORARY USE PERMIT FOR MODEL APARTMENTS ON 26TH FLOOR (27TH MARKETING FLOOR) PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN… |
| 2025-03-13 | Protection and Mechanical Methods | Signed-off | Press Builders Inc. | Filing for Cantilever Platform system at 1299 3rd Avenue on Floor Levels 6 and 7 to support concrete building cantilever on Floor levels 7 and 8 and to support scaffoldi… |
| 2025-02-05 | Sidewalk Shed | Signed-off | Rockledge Scaffold Corp. | HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| 2025-01-08 | Suspended Scaffold | Signed-off | Pioneer Window Mfg Corp. | Installation of suspended scaffold equipment to access facade work. |
| 2024-12-16 | Standpipe | Signed-off | Kg Sprinkler Corp. | SPRINKLER/STANDPIPE WORK IN CONJUNCTION WITH NB CONSTRUCTION. NB FILED UNDER #121187964. |
| 2024-12-03 | Protection and Mechanical Methods | Signed-off | Rockledge Scaffold Corp. | TEMPORARY NEEDLE BEAM PLATFORM AT 9TH FLOOR AS PER DRAWINGS. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THI… |
| 2024-11-20 | Standpipe | Signed-off | Kg Sprinkler Corp. | Installation of temporary standpipe in conjunction with NB construction. NB filed under 121187964. |
| 2024-10-31 | Protection and Mechanical Methods | Signed-off | Core Scaffold Systems Inc. | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 2024-10-21 | Supported Scaffold | Signed-off | Rockledge Scaffold Corp. | TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| 2024-09-24 | Construction Fence | Signed-off | Rockledge Scaffold Corp. | INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR… |
| 2024-09-12 | Protection and Mechanical Methods | Signed-off | Rockledge Scaffold Corp. | TEMPORARY CANTILEVERED PLATFORM AS PER DRAWINGS. CANTILEVERED PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATI… |
| 2024-08-14 | Suspended Scaffold | Signed-off | Elm Suspension Systems | INSTALLATION OF TEMPORARY MATERIAL HOIST (COUNTERWEIGHTED SYSTEM). |
| 2024-08-02 | Supported Scaffold | Signed-off | Rockledge Scaffold Corp. | TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
Latest 25 of 26 job filings.
| Job | Filed | Type | Status |
|---|---|---|---|
| M01337554 | 2025-12-22 | Alteration | LOC Issued |
| M00816844 | 2025-10-06 | Alteration | Approved |
| M00649512 | 2025-09-16 | Alteration | Approved |
| M01236396 | 2025-06-12 | Alteration | LOC Issued |
| M01193973 | 2025-05-07 | Alteration | Approved |
| M01164710 | 2025-04-24 | Alteration | Approved |
| M01176453 | 2025-04-16 | Alteration | LOC Issued |
| M01209619 | 2025-04-11 | Alteration | LOC Issued |
| M01171479 | 2025-01-28 | Alteration | Filing Withdrawn |
| M01012606 | 2024-11-26 | Alteration | Approved |
| M01134932 | 2024-10-30 | Alteration | LOC Issued |
| M01089655 | 2024-08-13 | Alteration | LOC Issued |
| M01082703 | 2024-07-31 | Alteration | Permit Entire |
| M01016105 | 2024-03-08 | Alteration | Objections |
| M00862544 | 2024-01-16 | Alteration | Approved |
| M00892097 | 2023-10-13 | Alteration | LOC Issued |
| M00875666 | 2023-05-19 | Alteration | LOC Issued |
| M00872778 | 2023-05-16 | Alteration | LL 158-2017-Denied |
| M00872752 | 2023-05-16 | Alteration | LOC Issued |
| M08005451 | 2022-09-21 | Alteration | LOC Issued |
| M00086490 | 2018-10-24 | Alteration | Approved |
| M00046853 | 2018-06-12 | Alteration | Permit Entire |
| M00046832 | 2018-06-12 | Alteration | Permit Entire |
| M00046845 | 2018-06-11 | Alteration | Permit Entire |
| M00046825 | 2018-06-11 | Alteration | Permit Entire |
Source: NYC Department of Buildings filings, permits and violations. Sign in to BuildNYC for plans on file, inspections and the full building record.