C1-9Zoning
—Gross Floor Area
—Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
10,388 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionCivilGeneral
Roof3p · 2 filings · 20 docs
Floor 331p · 1 filing · 20 docs
Floor 323p · 1 filing · 20 docs
Floor 315p · 2 filings · 20 docs
Floor 301p · 1 filing · 20 docs
Floor 29
Floor 28
Floor 27
Floor 261p · 1 filing · 7 docs
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 161p · 1 filing · 20 docs
Floor 151p · 1 filing · 20 docs
Floor 141p · 1 filing · 20 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 91p · 1 filing · 20 docs
Floor 81p · 1 filing · 20 docs
Floor 71p · 1 filing · 20 docs
Floor 61p · 1 filing · 20 docs
Floor 56p · 4 filings · 20 docs
Floor 42p · 3 filings · 20 docs
Floor 34p · 3 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 14p · 3 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELAD EAST 744707/08/2026
ELAD US HOLDING3707/08/2026
RIVERSIDE CENTER BUILDING 5 OWNER L2307/08/2026
TRI BOROUGH SCAFFOLDING907/08/2026
CONTINENTAL VENTURES REALTY607/08/2026
CIVIC CENTER COMMUNITY GROUP BROADW1004/09/2026
OWNERS REP504/09/2026
PRESS BUILDERS603/22/2026
C/O EL AD US HOLDING INC103/22/2026
JEM CONTRACTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1203/21/2026
JAM CONSULTANTS, INC.3803/21/2026
DOMANI CONSULTING803/21/2026
A1 EXPEDITING SERVICE3003/21/2026
HS DESIGN STUDIO1203/21/2026
HIERARCH-E203/21/2026
VALJATO ENGINEERING P C203/21/2026
EXPEDITE DEM203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKLEDGE SCAFFOLD CORPGeneral Contractor2507/08/2026
KG SPRINKLER CORPFire Protection907/08/2026
PRESS BUILDERS INCGeneral Contractor507/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor507/08/2026
ALBA SERVICES INCGeneral Contractor307/08/2026
CONTACT PLUS ELEC'L CORPElectrical203/22/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor204/09/2026
DONATO, INCPlumbing207/08/2026
NOVA CONSTRUCTION SERVICEGeneral Contractor104/09/2026
LENDLEASE(US)CONSTRUCTIONGeneral Contractor107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
V P ALTITUDEGeneral Contractor104/09/2026
PRECISE CONSTRUCTION CONRGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431512/22/2025
LOMBARDO PROF ENGINEERING8566604/24/2025
CLARKE ENGINEERING SERVIC3795211/03/2023
VALJATO ENGINEERING PC2486110/13/2023
Building Lifecycle
All (264)Filed (54)Permit Issued (52)Signed Off (24)Violation (9)Inspection (16)Objection (79)Special Inspection (30)
08/27/2026
Signed off — Alteration
SPRINKLER WORK IN CONJUNCTION WITH NB CONSTRUCTION. NB FILED UNDER #121187964.
M01176453-I1
07/29/2026
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M08005451-I1
04/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01134932-I1
04/20/2026
Signed off — Alteration
M01209619-I1
04/13/2026
Signed off — Alteration
SPRINKLER/STANDPIPE WORK IN CONJUNCTION WITH NB CONSTRUCTION. NB FILED UNDER #121187964.
M00649512-I1
04/13/2026
Signed off — Alteration
TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJACENT PROPERTIES AS PER DRAWINGS DURING NB CONST, FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00862544-I1
04/13/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00816844-I1
04/13/2026
Signed off — Alteration
SPRINKLER/STANDPIPE WORK IN CONJUNCTION WITH NB CONSTRUCTION. NB FILED UNDER #121187964.
M00649512-S2
04/13/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/06/2026
Signed off — Alteration
M01337554-I1
03/03/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00816844-S6
03/03/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00816844-S2
03/03/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00816844-S4
03/03/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00816844-S3
03/03/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00816844-S5
01/29/2026
Permit issued — General Construction
M01337554-I1-GC
01/21/2026
Permit issued — Sidewalk Shed
M00816844-I1-SH
12/22/2025
Filed — Alteration
M01337554-I1
11/14/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01164710-I1
11/14/2025
Permit issued — Suspended Scaffold
M01082703-I1-SC
11/14/2025
Violation issued (ECB, closed)
Construction
10/16/2025
Signed off — Alteration
THIS APPLICATION FILED HEREWITH FOR A TEMPORARY USE PERMIT FOR MODEL APARTMENTS ON THE 5TH FLOOR (UNIT 5C) PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002. NO CHANGE IN OCCUPANCY, USE OR EGRESS UNDER THIS APPLICATION
M01236396-I1
10/16/2025
Signed off — Alteration
M01193973-I1
10/06/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00816844-P6
09/18/2025
Permit issued — Construction Fence
M08005451-I1-FN
09/18/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/18/2025
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
09/16/2025
Filed — Alteration
SPRINKLER/STANDPIPE WORK IN CONJUNCTION WITH NB CONSTRUCTION. NB FILED UNDER #121187964.
M00649512-A4
09/04/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00816844-P4
08/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2025
Permit issued — Supported Scaffold
M00816844-S2-SF
07/23/2025
Permit issued — Sprinklers
M01176453-I1-EW-SP
07/22/2025
Signed off — Alteration
M01089655-I1
07/02/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/01/2025
Signed off — Alteration
INSTALLATION OF SPYDER CRANE IN CONJUNCTION WITH NB 121187964. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00892097-I1
06/30/2025
Permit issued — General Construction
M01236396-I1-GC
06/27/2025
Permit issued — General Construction
M00892097-I1-GC
06/12/2025
Filed — Alteration
THIS APPLICATION FILED HEREWITH FOR A TEMPORARY USE PERMIT FOR MODEL APARTMENTS ON THE 5TH FLOOR (UNIT 5C) PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002. NO CHANGE IN OCCUPANCY, USE OR EGRESS UNDER THIS APPLICATION
M01236396-I1
06/10/2025
Permit issued — Sprinklers
M00649512-I1-EW-SP
06/06/2025
Violation issued (ECB, closed)
Unknown
05/16/2025
Permit issued — Supported Scaffold
M00816844-S4-SF
05/12/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/07/2025
Filed — Alteration
M01193973-P1
05/06/2025
Permit issued — Protection and Mechanical Methods
M00862544-I1-PMM
04/30/2025
Violation issued (ECB, closed)
Construction
04/30/2025
Violation issued (ECB, closed)
Construction
04/25/2025
Special inspection requirement — Post-installed Anchors
Michael Lombardo
04/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01164710-P1
04/16/2025
Filed — Alteration
SPRINKLER WORK IN CONJUNCTION WITH NB CONSTRUCTION. NB FILED UNDER #121187964.
M01176453-I1
04/16/2025
Permit issued — Supported Scaffold
M01209619-I1-SF
04/11/2025
Filed — Alteration
M01209619-I1
04/09/2025
Special inspection requirement — Post-installed Anchors
Michael Lombardo
04/03/2025
Signed off — Alteration
Filing for Cantilever Platform system at 1299 3rd Avenue on Floor Levels 6 and 7 to support concrete building cantilever on Floor levels 7 and 8 and to support scaffolding on the North side from Floor levels 7 through 31.
M00872752-I1
03/28/2025
Permit issued — General Construction
M01193973-I1-GC
03/17/2025
Signed off — Alteration
M01012606-I1
03/13/2025
Filed — Alteration
M01193973-I1
03/13/2025
Permit issued — Protection and Mechanical Methods
M00872752-I1-PMM
Latest 60 of 264 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNOVA CONSTRUCTION SERVICE01/29/2026
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP01/21/2026
DOB NOWSuspended ScaffoldPermit IssuedPIONEER WINDOW MFG CORP11/14/2025
DOB NOWConstruction FenceSigned-offROCKLEDGE SCAFFOLD CORP09/18/2025
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP07/29/2025
DOB NOWSprinklersSigned-offH M SPRINKLER INC07/23/2025
DOB NOWGeneral ConstructionSigned-offPRESS BUILDERS INC06/30/2025
DOB NOWGeneral ConstructionSigned-offPRECISE CONSTRUCTION CONR06/27/2025
DOB NOWSprinklersSigned-offH M SPRINKLER INC06/10/2025
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP05/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP05/06/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/16/2025
DOB NOWGeneral ConstructionSigned-offPRESS BUILDERS INC03/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offPRESS BUILDERS INC03/13/2025
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP02/05/2025
DOB NOWSuspended ScaffoldSigned-offPIONEER WINDOW MFG CORP01/08/2025
DOB NOWStandpipeSigned-offH M SPRINKLER INC12/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP12/03/2024
DOB NOWStandpipeSigned-offH M SPRINKLER INC11/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC10/31/2024
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP10/21/2024
DOB NOWConstruction FenceSigned-offROCKLEDGE SCAFFOLD CORP09/24/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP09/12/2024
DOB NOWSuspended ScaffoldSigned-offELM SUSPENSION SYSTEMS08/14/2024
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP08/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP06/10/2024
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP05/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP05/07/2024
DOB NOWSuspended ScaffoldSigned-offPIONEER WINDOW MFG CORP04/17/2024
DOB NOWStandpipeSigned-offH M SPRINKLER INC02/23/2024
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP02/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP12/05/2023
DOB NOWStandpipeSigned-offH M SPRINKLER INC11/28/2023
DOB NOWPlumbingSigned-offDONATO, INC11/27/2023
DOB NOWSprinklersSigned-offH M SPRINKLER INC11/20/2023
DOB NOWSprinklersSigned-offH M SPRINKLER INC11/20/2023
DOB NOWConstruction FenceSigned-offROCKLEDGE SCAFFOLD CORP09/25/2023
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP08/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP06/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRESS BUILDERS INC06/08/2023
+ 19 more permits on file
1 project · most recent 04/16/2025
FiledStatusContractorScope
04/16/2025Signed-offKG SPRINKLER CORP48 heads
10 projects · most recent 03/11/2025
General Wiring
FiledStatusContractorScope
03/11/2025Permit IssuedALBA ELECTRIC CORPGeneral Wiring
09/17/2024Permit IssuedROBERT CHIMENTI3 meters, 1 new_meters
02/08/2024Permit IssuedCONTACT PLUS ELEC'L CORP—
01/02/2024Permit IssuedJAM ELECTRICAL CORP—
09/21/2023Permit IssuedCONTACT PLUS ELEC'L CORPGeneral Wiring
06/09/2023Permit IssuedCONTACT PLUS ELEC'L CORPGeneral Wiring
04/19/2023CompleteNET POWER ELECTRIC CORP2 meters, 2 new_meters
06/06/2018Permit IssuedV. VASS ELECTRIC CORP—
06/06/2018Permit IssuedV. VASS ELECTRIC CORP—
12/12/2017Permit IssuedUSIS ELECTRIC INC—
3 projects · most recent 09/21/2022
Fence Scaffold
FiledStatusContractorScope
09/21/2022Signed-offROCKLEDGE SCAFFOLD CORPFence
10/24/2018Permit IssuedLENDLEASE(US)CONSTRUCTIONFence
06/12/2018Permit IssuedTRI BOROUGH SCAFFOLDINGScaffold
1 project · most recent 07/31/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/31/2024Permit IssuedPIONEER WINDOW MFG CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
04/13/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/12/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/18/2025Pass-Final SP - More than 10 Requested FloorsPassView ↗
01/28/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/13/2025Pass-Final SD - Up to 3 Requested FloorsPassView ↗
01/13/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/14/2024Pass-Final SD - Fire PumpPassView ↗
11/08/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/07/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/07/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/03/2023Pass-Final PL - UndergroundPassView ↗
03/27/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/18/2025Post-installed AnchorsJOHN MCMONAGLEspecial
09/18/2025Sprinkler SystemsJOHN MCMONAGLEspecial
09/18/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/18/2025Standpipe SystemsJOHN MCMONAGLEspecial
04/25/2025Post-installed AnchorsMichael Lombardospecial
04/09/2025Post-installed AnchorsMichael Lombardospecial
03/10/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/10/2025Standpipe SystemsJOHN MCMONAGLEspecial
03/10/2025Sprinkler SystemsJOHN MCMONAGLEspecial
03/10/2025Post-installed AnchorsJOHN MCMONAGLEspecial
02/04/2025Post-installed AnchorsJOHN MCMONAGLEspecial
02/04/2025Sprinkler SystemsJOHN MCMONAGLEspecial
02/04/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/28/2025Post-installed AnchorsJOHN MCMONAGLEspecial
01/28/2025Sprinkler SystemsJOHN MCMONAGLEspecial
01/28/2025Standpipe SystemsJOHN MCMONAGLEspecial
01/28/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/03/2024Post-installed AnchorsMichael Lombardospecial
11/19/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/19/2024Post-installed AnchorsJOHN MCMONAGLEspecial
11/19/2024Standpipe SystemsJOHN MCMONAGLEspecial
11/19/2024Sprinkler SystemsJOHN MCMONAGLEspecial
11/04/2024Post-installed AnchorsJOHN MCMONAGLEspecial
11/04/2024Standpipe SystemsJOHN MCMONAGLEspecial
11/04/2024Sprinkler SystemsJOHN MCMONAGLEspecial
Latest 25 of 40.
▾Documents — 461 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch53
09/06/2026M00046825-I1Request digital key ↗
09/06/2026M00046845-I1Request digital key ↗
09/06/2026M00046832-I1Request digital key ↗
Showing 3 of 53 on file for this type
▸Applications & Permits61
▸BISPLAN / WORK APPROVAL APPLICATION54
10/08/2025121187964Open ↗
09/04/2025121187964Open ↗
08/14/2025121187964Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION7
01/29/2024121187964Open ↗
06/01/2023121187964Open ↗
02/22/2023121187964Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records12
▸BISZONING DIAGRAM5
12/04/2023121187964Open ↗
11/22/2022121187964Open ↗
05/12/2022121187964Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/02/2023141007755Open ↗
Showing 1 of 2 on file for this type
▸BISZONING CHALLENGE2
02/13/2024121187964Open ↗
05/13/2022121187964Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications97
▸DOB NOWDPL-1: Design Professional Seal & Signature52
09/06/2026M00030176-I1Open ↗
09/06/2026M00046825-I1Open ↗
09/06/2026M00046832-I1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/18/2026M00816844-P2Open ↗
09/05/2026M01012606-I1Open ↗
09/02/2026M00649512-P6Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/03/2022141007755Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/03/2022141007755Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING12
02/28/2025121187964Open ↗
02/10/2025121187964Open ↗
01/08/2025121187964Open ↗
Showing 3 of 12 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/04/2025121187964Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/04/2025121187964Open ↗
▸Safety & Tenant Protection9
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
03/03/2022141007755Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
02/06/2023141007755Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/06/2026M00046832-I1Open ↗
08/13/2026M00046853-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/22/2023121187964Open ↗
Showing 1 of 2 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
02/04/2025121187964Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/22/2023121187964Open ↗
▸BISINTERIOR LIGHTING POWER1
02/04/2025121187964Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/04/2025121187964Open ↗
▸BISFENESTRATION AREAS1
02/04/2025121187964Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/04/2025121187964Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/04/2025121187964Open ↗
▸BISELECTRIC MOTORS1
02/04/2025121187964Open ↗
▸Inspections & Test Reports48
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX16
06/18/2024121187964Open ↗
06/14/2023121187964Open ↗
06/14/2023121187964Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/02/2025121187964Open ↗
10/17/2024121187964Open ↗
08/30/2024121187964Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/22/2023121187964Open ↗
Showing 1 of 2 on file for this type
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
03/01/2024121187964Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/06/2024121187964Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/27/2025121187964Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/02/2025121187964Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/06/2025121187964Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/04/2025121187964Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/06/2025121187964Open ↗
▸BISMASONRY1
02/04/2025121187964Open ↗
▸BISPOST-INSTALLED ANCHORS1
02/04/2025121187964Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/06/2025121187964Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/06/2025121187964Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
01/02/2025121187964Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
01/06/2025121187964Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
03/26/2024121187964Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
10/08/2024121187964Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/26/2024121187964Open ↗
▸Approvals, Objections & Sign-offs20
▸BISSCHEDULE A - OCCUPANCY / USE16
08/14/2025121187964Open ↗
07/25/2025121187964Open ↗
01/22/2025121187964Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/07/2022121187964Open ↗
10/03/2022121187964Open ↗
Showing 2 of 4 on file for this type
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE4
02/22/2023121187964Open ↗
10/07/2022121187964Open ↗
Showing 2 of 4 on file for this type
▸Filing & Intake Forms44
▸BISADDITIONAL INFORMATION27
08/20/2025121187964Open ↗
08/04/2025121187964Open ↗
01/16/2025121187964Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWAI1 Form9
08/13/2026M00649512-P7Open ↗
08/13/2026M00649512-P9Open ↗
08/13/2026M00649512-A1Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
06/01/2023121187964Open ↗
10/07/2022121187964Open ↗
10/03/2022121187964Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents58
▸DOB NOWDHCR Document28
08/13/2026M00649512-P6Open ↗
08/13/2026M01171479-I1Open ↗
08/13/2026M01193973-P1Open ↗
Showing 3 of 28 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
02/23/2021121187964Open ↗
02/23/2021121187964Open ↗
02/23/2021121187964Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWManufacturer's Specifications6
08/13/2026M01082703-I1Open ↗
08/13/2026M01089655-I1Open ↗
08/13/2026M01164710-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCalculations6
08/13/2026M01164710-P1Open ↗
08/13/2026M01164710-I1Open ↗
08/13/2026M01082703-I1Open ↗
Showing 3 of 6 on file for this type
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)2
01/24/2025121187964Open ↗
01/24/2025121187964Open ↗
▸DOB NOWWaiver Document2
08/13/2026M00649512-S2Open ↗
08/13/2026M00649512-P5Open ↗
▸BISSHUTOFF DAMPERS1
02/04/2025121187964Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
01/06/2025121187964Open ↗
▸BISUNDERPINNING (2014)1
03/26/2024121187964Open ↗
▸BISVESTIBULES1
02/04/2025121187964Open ↗
▸BISMAINTENANCE INFORMATION1
02/04/2025121187964Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
02/04/2025121187964Open ↗
▸BISFIREPLACES1
02/04/2025121187964Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
08/13/2026M00872778-I1Open ↗