← Back
Walk-up cooperative
Bay Terrace Coop 1
13-04 BELL BOULEVARD · BIN 4616936
💬 Discuss this project
1954Year Built
2Stories
C6Building Class
R3-2Zoning
120,175 sfGross Floor Area
136Units
LL97 Covered5 Open Violations 1 unresolved · 4 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: BAY TERRACE COOPERATIVE SECTION I, INC. · 314,760 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AFM INSPECTIONS & ENGINEERING, PLLC204/30/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TLS CONSTRUCTION GROUP I*General Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AFM INSPECTIONS & ENGINEE4675204/30/2024
Building Lifecycle
All (11)Filed (2)Permit Issued (2)Signed Off (1)Special Inspection (6)
05/17/2024
Signed off — Alteration
INTERIOR ALTERATION IN UNIT #194 AT 2ND FLOOR. NO CHANGE TO BUILDING SIZE. NO CHANGE TO LOT COVERAGE. NO CHANGE TO ZONING. NO CHANGE TO OCCUPANCY, EGRESS, OR USE.
Q00928093-I1
05/14/2024
Permit issued — Structural
Q00928093-I1-ST
04/30/2024
Filed — Alteration
INTERIOR ALTERATION IN UNIT #194 AT 2ND FLOOR. NO CHANGE TO BUILDING SIZE. NO CHANGE TO LOT COVERAGE. NO CHANGE TO ZONING. NO CHANGE TO OCCUPANCY, EGRESS, OR USE.
Q00928093-P1
03/29/2024
Permit issued — Structural
Q00928093-I1-GC
02/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Marmo
02/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Marmo
02/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Anthony Marmo
02/07/2024
Special inspection requirement — Final
Anthony Marmo
02/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Marmo
02/07/2024
Special inspection requirement — Structural Wood Frame
Anthony Marmo
10/27/2023
Filed — Alteration
INTERIOR ALTERATION IN UNIT #194 AT 2ND FLOOR. NO CHANGE TO BUILDING SIZE. NO CHANGE TO LOT COVERAGE. NO CHANGE TO ZONING. NO CHANGE TO OCCUPANCY, EGRESS, OR USE.
Q00928093-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTLS CONSTRUCTION GROUP I*05/14/2024
DOB NOWStructuralSigned-offTLS CONSTRUCTION GROUP I*03/29/2024
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/07/2024Fire-Resistant Penetrations and JointsAnthony Marmospecial
02/07/2024Structural Stability – Alterations of existing buildingsAnthony Marmospecial
02/07/2024Energy Code Compliance InspectionsAnthony Marmoprogress
02/07/2024FinalAnthony Marmoprogress
02/07/2024Fire-Resistance Rated ConstructionAnthony Marmoprogress
02/07/2024Structural Wood FrameAnthony Marmoprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026Q00928093-P1Request digital key ↗
08/22/2026Q00928093-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026Q00928093-P1Open ↗
08/22/2026Q00928093-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026Q00928093-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00928093-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026Q00928093-I1Open ↗
08/22/2026Q00928093-P1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00928093-P1Open ↗