← Back
Two stories - detached, small or mid-size
13-15 CROSS BAY BOULEVARD
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R3AZoning
831 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,540 sf lot · 0.33 FAR built · Flood zone AE
Locations of Work
Electrical
Roof2p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/29/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/29/2026
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (6)
07/09/2026
Signed off — Alteration
Q01352445-I1
02/05/2026
Permit issued — Solar
Q01352445-I1-SL
01/29/2026
Filed — Alteration
Q01352445-I1
01/29/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
01/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/29/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/28/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/05/2026
BISOTISSUEDSUNRUN INSTALLATION SVC08/31/2017
1 project · most recent 01/29/2026
FiledStatusContractorScope
01/29/2026CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/29/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
01/29/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/29/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
01/28/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/28/2026Energy Code Compliance InspectionsWalid Abdullaprogress
01/28/2026FinalWalid Abdullaprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01352445-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/30/2017440430696Open ↗
▸BISWORK PERMIT APPLICATION1
08/30/2017440430696Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01352445-I1Open ↗
08/25/2026Q01352445-I1Open ↗
08/25/2026Q01352445-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026Q01352445-I1Open ↗
08/25/2026Q01352445-I1Open ↗
08/25/2026Q01352445-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/30/2017440430696Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/30/2017440430696Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2017440430696Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01352445-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/30/2017440430696Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/30/2017440430696Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01352445-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/27/2017440430696Open ↗
08/30/2017440430696Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/30/2017440430696Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/27/2017440430696Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
11/27/2017440430696Open ↗
▸BISNYCECC ANALYSIS1
08/30/2017440430696Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/30/2017440430696Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/27/2017440430696Open ↗
08/30/2017440430696Open ↗
▸Approvals, Objections & Sign-offs4
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
11/27/2017440430696Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/27/2017440430696Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/27/2017440430696Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01352445-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/27/2017440430696Open ↗
08/30/2017440430696Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2017440430696Open ↗