← Back
BuildNYC
Over six families without stores
Bayswater Gardens
13-19 EGGERT PLACE · BIN 4452154
💬 Discuss this project
1949Year Built
3Stories
C1Building Class
R5Zoning
104,463 sfGross Floor Area
126Units
LL97 CoveredRent Stabilized110 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: Bayswater Gardens · 120,950 sf lot · 0.86 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation on existing roof4p · 2 filings · 20 docs
Floor 32p · 1 filing · 18 docs
Floor 22p · 1 filing · 18 docs
Floor 12p · 1 filing · 18 docs
Cellar7p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bayswater Gardens2607/08/2026
Indus Realty303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company309/13/2024
NY Building Associates105/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company603/21/2026
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYS Essential PowerGeneral Contractor303/21/2026
Premier Solar SolutionsGeneral Contractor303/21/2026
Pos Electrical ContractorsElectrical103/22/2026
A & C Heating Servicesspecialty_contractor107/08/2026
A & C Heating ServicesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851309/13/2024
NKM Engineering6244105/21/2024
Building Lifecycle
All (99)Filed (4)Permit Issued (5)Signed Off (4)Violation (60)Inspection (3)Objection (8)Special Inspection (15)
03/17/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE INUSE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
Q01036453-I1
02/26/2025
Signed off — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER TO EXISTING GAS PIPING.
Q01101142-I1
02/26/2025
Signed off — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER TO EXISTING GAS PIPING.
Q01101142-S1
02/26/2025
Signed off — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER TO EXISTING GAS PIPING.
Q01101142-S2
02/07/2025
Permit issued — Solar
Q01036453-I1-SL
01/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/27/2024
Permit issued — Plumbing
Q01101142-S1-PL
09/26/2024
Permit issued — General Construction
Q01101142-S2-GC
09/26/2024
Permit issued — Boiler Equipment
Q01101142-I1-BE
09/13/2024
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER TO EXISTING GAS PIPING.
Q01101142-I1
09/13/2024
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER TO EXISTING GAS PIPING.
Q01101142-S1
09/13/2024
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER TO EXISTING GAS PIPING.
Q01101142-S2
09/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
09/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/23/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
08/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/23/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
08/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/23/2024
Special inspection requirement — Chimneys and vents
LOUIS ARENA
08/23/2024
Special inspection requirement — Final
LOUIS ARENA
08/21/2024
Permit issued — Solar
Q01036453-I1-SL
06/12/2024
Objection resolved — Addressed
06/12/2024
Objection resolved — Addressed
05/30/2024
Objection resolved — Addressed
05/30/2024
Objection resolved — Addressed
05/24/2024
Objection raised — Other
05/24/2024
Objection raised — Other
05/24/2024
Objection raised — Other
05/24/2024
Objection raised — Other
05/21/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE INUSE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
Q01036453-I1
04/16/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
04/16/2024
Special inspection requirement — Final
NARESH MAHANGU
11/16/2023
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
C
11/16/2023
Violation issued (HPD, closed)
C
11/16/2023
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
C
11/16/2023
Violation issued (HPD, closed)
C
11/16/2023
Violation issued (HPD, closed)
A
11/11/2023
Violation issued (HPD, closed)
B
11/11/2023
Violation issued (HPD, closed)
C
11/11/2023
Violation issued (HPD, closed)
C
11/11/2023
Violation issued (HPD, closed)
C
11/11/2023
Violation issued (HPD, closed)
B
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2022
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
B
11/15/2022
Violation issued (HPD, closed)
B
11/15/2022
Violation issued (HPD, closed)
C
06/07/2022
Violation issued (HPD, closed)
B
06/07/2022
Violation issued (HPD, closed)
B
06/07/2022
Violation issued (HPD, closed)
C
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYS Essential Power02/07/2025
DOB NOWPlumbingSigned-offDMC Plumbing & Heating09/27/2024
DOB NOWGeneral ConstructionSigned-offA & C Heating Services09/26/2024
DOB NOWBoiler EquipmentSigned-offA&C Heating Services09/26/2024
DOB NOWSolarSigned-offPremier Solar Solutions08/21/2024
BISFBISSUEDA & C Combstn Services01/24/2000
BISPLISSUEDA & C Heating Services01/24/2000
2 projects · most recent 04/15/2024
General Wiring
FiledStatusContractorScope
04/15/2024CompleteBertram Electric Contng—
03/28/2021CompletePos Electrical ContractorsGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/13/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
09/13/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/23/2024Maintenance informationLOUIS ARENAenergy_progress
08/23/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/23/2024Heating SystemsLOUIS ARENAspecial
08/23/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/23/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/23/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/23/2024Chimneys and ventsLOUIS ARENAspecial
08/23/2024FinalLOUIS ARENAprogress
04/16/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
04/16/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/16/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
04/16/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/16/2024FinalNARESH MAHANGUprogress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026Q01036453-I1Request digital key ↗
08/21/2026Q01101142-I1Request digital key ↗
08/21/2026Q01101142-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026Q01101142-I1Open ↗
09/23/2026Q01101142-I1Open ↗
09/23/2026Q01101142-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q01101142-I1Open ↗
09/23/2026Q01101142-I1Open ↗
09/05/2026Q01101142-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026Q01036453-I1Open ↗
08/13/2026Q01101142-S1Open ↗
08/13/2026Q01101142-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q01036453-I1Open ↗
08/13/2026Q01101142-I1Open ↗
08/13/2026Q01101142-S2Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01036453-I1Open ↗