← Back
Zoned commercial or Manhattan residential
13-28 133 PLACE
QUEENS · BIN 4625586
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
Zoned commercial or Manhattan residential · Owner of record: 1332 133RD PLACE LLC · 4,313 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction34p · 1 filing · 20 docs
Floor 1Under Construction36p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CIAMPA MANAGEMENT3104/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/26/2021$980K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADNAN ENGINEERING, P.C.309/10/2025
SPARK ENGINEERING208/20/2025
GINO O. LONGO, ARCHITECT509/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GINO O LONGO ARCHITECT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE MANLYN DEVELOPMENT GROUPGeneral Contractor704/09/2026
VMC PLUMBING & HEATING INPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843509/10/2025
Building Lifecycle
All (77)Filed (10)Permit Issued (8)Violation (3)Inspection (6)Objection (20)Special Inspection (30)
07/13/2026
Violation issued (ECB, open)
Construction
04/22/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2026
Violation issued (ECB, open)
Unknown
03/02/2026
Permit issued — Plumbing
Q00966795-S4-PL
02/24/2026
Permit issued — General Construction
Q00966795-I1-GC
02/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2025
Permit issued — Support of Excavation
Q00966795-Z2-SE
12/11/2025
Permit issued — General Construction
Q00966795-I1-GC
12/09/2025
Permit issued — Foundation
Q00966795-S8-FO
12/09/2025
Permit issued — Curb Cut
Q00966795-S5-CC
11/16/2025
Objection resolved — Addressed
11/10/2025
Permit issued — Structural
Q00966795-S7-ST
11/10/2025
Permit issued — Curb Cut
Q00966795-S6-CC
11/10/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/20/2025
Objection resolved — Addressed
10/20/2025
Special inspection requirement — Maintenance information
10/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/20/2025
Special inspection requirement — Shutoff dampers
10/20/2025
Special inspection requirement — Mechanical Systems
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/20/2025
Special inspection requirement — Final
10/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/26/2025
Objection raised — Other
09/24/2025
Objection raised — Other
09/10/2025
Filed — New Building
APPLICATION HERE WITH FILED FOR A NEW ROOFTOP SPLIT SYSTEM FOR COOLING AND HEATING, NEW OA UNIT AND NEW TOILET EXHAUST SYSTEM. PAA - ADDING TWO NEW TOILET EXHAUST FANS FOR TWO BATHROOMS.
Q00966795-Z2
08/20/2025
Filed — New Building
APPLICATION HERE WITH FILED FOR A NEW ROOFTOP SPLIT SYSTEM FOR COOLING AND HEATING, NEW OA UNIT AND NEW TOILET EXHAUST SYSTEM. PAA - ADDING TWO NEW TOILET EXHAUST FANS FOR TWO BATHROOMS.
Q00966795-P1
08/04/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JOHN MCMONAGLE
08/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
08/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
08/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
08/01/2025
Special inspection requirement — Final
08/01/2025
Special inspection requirement — Mechanical Systems
08/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/01/2025
Special inspection requirement — Maintenance information
08/01/2025
Special inspection requirement — Shutoff dampers
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/08/2025
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
06/27/2025
Filed — New Building
APPLICATION HERE WITH FILED FOR A NEW ROOFTOP SPLIT SYSTEM FOR COOLING AND HEATING, NEW OA UNIT AND NEW TOILET EXHAUST SYSTEM. PAA - ADDING TWO NEW TOILET EXHAUST FANS FOR TWO BATHROOMS.
Q00966795-Z1
09/13/2024
Objection raised — Other
09/13/2024
Objection raised — Other
09/13/2024
Objection raised — Other
09/05/2024
Filed — New Building
APPLICATION HERE WITH FILED FOR A NEW ROOFTOP SPLIT SYSTEM FOR COOLING AND HEATING, NEW OA UNIT AND NEW TOILET EXHAUST SYSTEM. PAA - ADDING TWO NEW TOILET EXHAUST FANS FOR TWO BATHROOMS.
Q00966795-S6
09/05/2024
Filed — New Building
APPLICATION HERE WITH FILED FOR A NEW ROOFTOP SPLIT SYSTEM FOR COOLING AND HEATING, NEW OA UNIT AND NEW TOILET EXHAUST SYSTEM. PAA - ADDING TWO NEW TOILET EXHAUST FANS FOR TWO BATHROOMS.
Q00966795-S4
09/05/2024
Filed — New Building
APPLICATION HERE WITH FILED FOR A NEW ROOFTOP SPLIT SYSTEM FOR COOLING AND HEATING, NEW OA UNIT AND NEW TOILET EXHAUST SYSTEM. PAA - ADDING TWO NEW TOILET EXHAUST FANS FOR TWO BATHROOMS.
Q00966795-S5
09/05/2024
Filed — New Building
APPLICATION HERE WITH FILED FOR A NEW ROOFTOP SPLIT SYSTEM FOR COOLING AND HEATING, NEW OA UNIT AND NEW TOILET EXHAUST SYSTEM. PAA - ADDING TWO NEW TOILET EXHAUST FANS FOR TWO BATHROOMS.
Q00966795-S9
09/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/05/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
09/05/2024
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
09/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
09/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
09/05/2024
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedM. SPINELLI PLB & HTG INC03/02/2026
DOB NOWGeneral ConstructionPermit IssuedTHE MANLYN DEVELOPMENT GR02/24/2026
DOB NOWSupport of ExcavationPermit IssuedTHE MANLYN DEVELOPMENT GR12/19/2025
DOB NOWGeneral ConstructionPermit IssuedTHE MANLYN DEVELOPMENT GR12/11/2025
DOB NOWFoundationPermit IssuedTHE MANLYN DEVELOPMENT GR12/09/2025
DOB NOWCurb CutPermit IssuedTHE MANLYN DEVELOPMENT GR12/09/2025
DOB NOWStructuralPermit IssuedTHE MANLYN DEVELOPMENT GR11/10/2025
DOB NOWCurb CutPermit IssuedTHE MANLYN DEVELOPMENT GR11/10/2025
1 project · most recent 09/10/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/10/2025Permit IssuedTHE MANLYN DEVELOPMENT GRHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ventilation
3 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026Permit IssuedNASH ELECTRIC SERVICES IN—
02/09/2026Permit IssuedCOGEN ELEC'L SERVICES,INCGeneral Wiring
02/09/2026Permit IssuedCOGEN ELEC'L SERVICES,INC—
1 project · most recent 09/10/2025
FiledStatusContractorScope
09/10/2025Permit IssuedM. SPINELLI PLB & HTG INC3 scope_items
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/22/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
10/20/2025Maintenance information—energy_progress
10/20/2025HVAC-R and service water piping design and insulation—energy_progress
10/20/2025HVAC-R and service water heating system controls—energy_progress
10/20/2025Shutoff dampers—energy_progress
10/20/2025Mechanical Systems—special
10/20/2025Fire-Resistant Penetrations and Joints—special
10/20/2025Final—progress
10/20/2025HVAC-R and service water heating equipment—energy_progress
08/04/2025Excavations - Sheeting, Shoring, and BracingJOHN MCMONAGLEspecial
08/01/2025HVAC-R and service water heating equipment—energy_progress
08/01/2025HVAC-R and service water heating system controls—energy_progress
08/01/2025HVAC-R and service water piping design and insulation—energy_progress
08/01/2025Final—progress
08/01/2025Mechanical Systems—special
08/01/2025Fire-Resistant Penetrations and Joints—special
08/01/2025Maintenance information—energy_progress
08/01/2025Shutoff dampers—energy_progress
07/08/2025Exterior lighting powerJOHN MCMONAGLEenergy_progress
09/05/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
09/05/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/05/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
09/05/2024Maintenance informationJOHN MCMONAGLEenergy_progress
09/05/2024HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
09/05/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
09/05/2024Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
Latest 25 of 47.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/19/2026Q00966795-S4Request digital key ↗
08/19/2026Q00966795-I1Request digital key ↗
08/19/2026Q00966795-Z2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
03/06/2024440816137Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/06/2024440816137Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00966795-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q00966795-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00966795-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026Q00966795-S4Open ↗
09/01/2026Q00966795-S4Open ↗
09/01/2026Q00966795-S4Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026Q00966795-Z2Open ↗
09/01/2026Q00966795-S4Open ↗
08/25/2026Q00966795-S8Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/19/2026Q00966795-Z1Open ↗
08/13/2026Q00966795-S4Open ↗
08/13/2026Q00966795-P1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/06/2024440816137Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00966795-S4Open ↗
08/13/2026Q00966795-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
03/06/2024440816137Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00966795-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/06/2024440816137Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/13/2026Q00966795-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00966795-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00966795-Z2Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00966795-I1Open ↗