← Back
BuildNYC
Office with commercial, 7-19 stories
13 LAIGHT STREET
MANHATTAN · BIN 1002735
💬 Discuss this project
1900Year Built
8Stories
O6Building Class
C6-2AZoning
97,814 sfGross Floor Area
3Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: No Report FiledFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: 15 Laight NY · 13,868 sf lot · 7.05 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects13-17 Laight NY LLC1 filing
Floor 24Heavy duty sidewalk shed installation2p · 1 filing · 20 docs
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 613-17 Laight NY LLC4p · 3 filings · 17 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Pipe scaffold installation3 filings · 14 docs
Mezzanine13-17 Laight NY LLC1p · 3 filings · 17 docs
Site & exteriorTemporary construction plywood fence installation7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
13-17 Laight NY4507/08/2026
Mazda Realty Associates4003/21/2026
Vanbarton Group2403/21/2026
Tribeca Enterprises303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/15/2023$273.5M—13-17 Laight NY → 15 LAIGHT NY LLC$2,796/sf building
09/22/2016$90.0M—810-VE LAIGHT, LLC → 13-17 Laight NY$920/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Syska Hennessy Group110/26/2021
Vocon109/13/2021
Arcadian Design Services108/26/2021
Asif Jamil, RA705/04/2021
Wavic Engineering101/07/2020
Green Design506/13/2019
Ashraf106/05/2018
Patuxent Engineering102/08/2018
KZ Engineering110/31/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mbe Code Zoning603/21/2026
Green Studio1403/21/2026
KD Designs103/21/2026
Atlantic Building Supply1003/21/2026
Patuxent Engineering203/21/2026
Spring Scaffolding203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold1207/08/2026
Classic Consulting GroupScaffold1107/08/2026
Alba ServicesScaffold1003/21/2026
DK Construction OneGeneral Contractor407/08/2026
Spring ScaffoldingScaffold407/08/2026
Access Solutions GroupScaffold307/08/2026
Neptune MechanicalFire Protection207/08/2026
Cma Plumbing & HeatingFire Protection207/08/2026
American Sign & Electrical ConSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423210/26/2021
Atlantic Engineeringlabor1381101/07/2020
Building Lifecycle
All (134)Filed (19)Permit Issued (29)Signed Off (12)Violation (60)Inspection (4)Special Inspection (10)
02/22/2024
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/08/2023
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00090333-I1
02/08/2023
Signed off — Alteration
M00090308-I1
02/08/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK BRIDGE APPROXIMATELY 410' LINEAR FEET LONG AS PER PLANS DURING FACADE RENOVATION FOR PEDESTRIAN SAFETY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY, SIDEWALK BRIDGE TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2014.
M00017837-I1
01/20/2023
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
01/17/2023
Signed off — Alteration
INSTALL TEMPORARY STANDPIPE AS PER PLANS
M00265651-I1
12/27/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00047460-I1
12/27/2022
Permit issued — Construction Fence
M00047460-I1-FN
06/04/2022
Permit issued — Sign
M00709157-I1-SG
05/17/2022
Signed off — Alteration
Modify sprinkler heads and related piping as shown on drawings.
M00581905-I1
04/25/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/19/2022
Permit issued — Sprinklers
M00581905-I1-EW-SP
04/19/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/17/2022
Signed off — Alteration
Construct interior partitions, ceilings and doors as shown on drawings.
M00581900-I1
02/16/2022
Violation issued (HPD, closed)
A
11/19/2021
Permit issued — Sprinklers
M00581905-I1-EW-SP
10/29/2021
Permit issued — General Construction
M00581900-I1-GC
10/26/2021
Filed — Alteration
Modify sprinkler heads and related piping as shown on drawings.
M00581905-I1
09/22/2021
Permit issued — General Construction
M00581900-I1-GC
09/13/2021
Filed — Alteration
Construct interior partitions, ceilings and doors as shown on drawings.
M00581900-I1
09/13/2021
Special inspection requirement — Interior lighting power
Young Suh
09/13/2021
Special inspection requirement — Lighting controls
Young Suh
09/13/2021
Special inspection requirement — Maintenance information
Young Suh
09/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/26/2021
Filed — No Work
M00583019-I1
08/23/2021
Special inspection requirement — Sprinkler Systems
Young Suh
08/23/2021
Special inspection requirement — Final
Young Suh
08/20/2021
Permit issued — Standpipe
M00265651-I1-EW-SD
07/15/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND CONSTRUCTION FENCE AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00417438-I1
07/15/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND PLYWOOD FENCE AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00099521-I1
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/28/2021
Violation issued (FDNY_ORDER, closed)
05/10/2021
Violation issued (ECB, closed)
Plumbing
05/07/2021
Special inspection requirement — Final
asif jamil
05/04/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AND PLYWOOD FENCE AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00099521-P5
04/28/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AND PLYWOOD FENCE AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00099521-P4
04/15/2021
Violation issued (ECB, closed)
Plumbing
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
03/30/2021
Violation issued (ECB, closed)
Unknown
03/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/10/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AND PLYWOOD FENCE AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00099521-P3
03/04/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AND PLYWOOD FENCE AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00099521-P2
02/11/2021
Violation issued (ECB, closed)
Construction
01/27/2021
Violation issued (ECB, closed)
Unknown
12/19/2020
Violation issued (ECB, closed)
Unknown
12/19/2020
Violation issued (ECB, closed)
Construction
12/19/2020
Violation issued (ECB, closed)
Unknown
12/19/2020
Violation issued (ECB, closed)
Construction
10/28/2020
Violation issued (ECB, closed)
Construction
10/28/2020
Violation issued (ECB, closed)
Construction
10/27/2020
Permit issued — Sidewalk Shed
M00417438-I1-FN
10/27/2020
Permit issued — Sidewalk Shed
M00417438-I1-SH
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offAlba Services12/27/2022
DOB NOWSignPermit IssuedAmerican Sign & Electrical Con06/04/2022
DOB NOWSprinklersSigned-offCma Plumbing & Heating04/19/2022
DOB NOWSprinklersSigned-offCma Plumbing & Heating11/19/2021
DOB NOWGeneral ConstructionSigned-offDK Construction One10/29/2021
DOB NOWGeneral ConstructionSigned-offDK Construction One09/22/2021
DOB NOWStandpipeSigned-offNeptune Mechanical08/20/2021
DOB NOWSidewalk ShedSigned-offRock Group NY10/27/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/27/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/07/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/07/2020
DOB NOWStandpipeSigned-offNeptune Mechanical07/23/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/09/2019
DOB NOWConstruction FenceSigned-offRock Group NY10/09/2019
DOB NOWSidewalk ShedSigned-offClassic Consulting Group06/18/2019
DOB NOWSupported ScaffoldSigned-offClassic Consulting Group06/17/2019
DOB NOWConstruction FenceSigned-offAlba Services04/01/2019
DOB NOWConstruction FenceSigned-offAlba Services03/22/2019
DOB NOWConstruction FenceSigned-offAlba Services01/17/2019
DOB NOWSupported ScaffoldSigned-offClassic Consulting Group10/22/2018
DOB NOWSidewalk ShedSigned-offClassic Consulting Group10/22/2018
DOB NOWSidewalk ShedSigned-offClassic Consulting Group10/17/2018
DOB NOWSidewalk ShedSigned-offClassic Consulting Group07/16/2018
DOB NOWConstruction FenceSigned-offAlba Services06/07/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/01/2018
DOB NOWSidewalk ShedSigned-offClassic Consulting Group02/09/2018
DOB NOWSupported ScaffoldSigned-offAccess Solutions Group12/14/2017
DOB NOWSidewalk ShedSigned-offAccess Solutions Group12/14/2017
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/01/2017
BIS—ISSUEDPavarini McGovern12/28/2020
BISBLISSUEDMarine Plumbing & Mechanical12/22/2020
BIS—ISSUEDPavarini McGovern12/21/2020
BISFSISSUEDPacific Energy10/16/2020
BISSPISSUEDNeptune Mechanical10/06/2020
BISPLISSUEDNeptune Mechanical10/06/2020
BISFSISSUEDPacific Energy07/17/2020
BISFSISSUEDPacific Energy06/24/2020
BISEQISSUEDRock Group NY06/05/2020
BISEQISSUEDAlba Services04/10/2020
BISOTISSUEDAlba Services04/10/2020
+ 39 more permits on file
14 projects · most recent 08/10/2022
General Wiring Lighting
FiledStatusContractorScope
08/10/2022CompleteRobert Chimenti4 meters, 1 new_meters
05/25/2022CancelledRainbow Electric Co—
09/30/2021CompleteBrandl ElectricGeneral Wiring
09/23/2021CompleteIfazio Electric NYGeneral Wiring
09/23/2021CompleteIfazio Electric NYGeneral Wiring
01/29/2020CompleteIlluminous Electric—
01/24/2020CompleteRoz-A-Lite Electrical Contg IGeneral Wiring
10/18/2019CompleteRoz-A-Lite Electrical Contg IGeneral Wiring, Lighting
10/17/2019CompleteRoz-A-Lite Electrical Contg I—
05/21/2019CompleteRichard Neu—
05/20/2019CompleteRoz-A-Lite Electrical Contg IGeneral Wiring
11/13/2018CompleteTop Shelf Electric—
10/19/2018CompleteRichard Neu—
12/13/2017Complete4000 Electric—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/20/2023Fail-Final Construction Permit WithdrawalFailView ↗
04/25/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/22/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/19/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/13/2021Interior lighting powerYoung Suhenergy_progress
09/13/2021Lighting controlsYoung Suhenergy_progress
09/13/2021Maintenance informationYoung Suhenergy_progress
09/13/2021Fire-Resistant Penetrations and JointsYoung Suhspecial
08/23/2021Sprinkler SystemsYoung Suhspecial
08/23/2021FinalYoung Suhprogress
05/07/2021Finalasif jamilprogress
10/21/2020Finalasif jamilprogress
11/14/2019Standpipe SystemsFAWZY SALIBspecial
12/13/2017FinalBRIAN T. O'CONNORprogress
▾Documents — 1,009 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch11
09/06/2026M00001316-I1Request digital key ↗
09/06/2026M00004395-I1Request digital key ↗
09/06/2026M00005614-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence6
09/04/2026M00417438-I1Request digital key ↗
09/03/2026M00099521-P2Request digital key ↗
09/03/2026M00099521-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed6
09/04/2026M00417438-I1Request digital key ↗
09/03/2026M00099521-P4Request digital key ↗
09/03/2026M00099521-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/06/2026M00090333-I1Request digital key ↗
08/15/2026M00090333-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/03/2026M00583019-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/05/2026M00265651-I1Request digital key ↗
▸Applications & Permits194
▸BISPLAN / WORK APPROVAL APPLICATION120
03/07/2023101827114Open ↗
03/06/2023101935827Open ↗
03/06/2023102743435Open ↗
Showing 3 of 120 on file for this type
▸BISWORK PERMIT APPLICATION67
12/28/2020123683530Open ↗
12/22/2020123802536Open ↗
Showing 2 of 67 on file for this type
▸BISPLACE OF ASSEMBLY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Zoning, Tax Lot & Property Records16
▸BISZONING RESOLUTION DETERMINATION14
02/23/2021123683530Open ↗
02/22/2021123683530Open ↗
Showing 2 of 14 on file for this type
▸BISZONING DIAGRAM2
04/15/2021123683530Open ↗
04/15/2021123683530Open ↗
▸Seals & Professional Certifications159
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION83
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 83 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/06/2026M00017837-I1Open ↗
09/04/2026M00417438-I1Open ↗
09/03/2026M00099521-P4Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
10/03/2026M00417438-I1Open ↗
09/01/2026M00581900-I1Open ↗
09/01/2026M00581900-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M00581905-I1Open ↗
09/01/2026M00581900-I1Open ↗
08/23/2026M00265651-I1Open ↗
▸Trade Schedules & Equipment79
▸BISSCHEDULE B - PLUMBING23
06/17/2021123683530Open ↗
05/05/2021123683530Open ↗
04/22/2021123553751Open ↗
Showing 3 of 23 on file for this type
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISEQUIPMENT USE PERMITS14
09/23/2021123683530Open ↗
09/23/2021123683530Open ↗
09/23/2021123683530Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT12
09/23/2021123683530Open ↗
09/23/2021123683530Open ↗
09/23/2021123683530Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
04/20/2021123802536Open ↗
04/06/2021123802536Open ↗
03/24/2021123802527Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan4
09/04/2026M00417438-I1Open ↗
09/03/2026M00099521-P4Open ↗
09/03/2026M00099521-P3Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos98
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸DOB NOWOER: Notice to Proceed14
09/06/2026M00017837-I1Open ↗
09/04/2026M00417438-I1Open ↗
09/03/2026M00099521-P2Open ↗
Showing 3 of 14 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION11
01/18/2023140881437Open ↗
01/28/2022123663865Open ↗
01/28/2022123835564Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
09/04/2026M00417438-I1Open ↗
09/03/2026M00099521-I1Open ↗
09/03/2026M00581900-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00581900-I1Open ↗
09/03/2026M00581905-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00265651-I1Open ↗
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/11/2023123683530Open ↗
09/16/2021123869251Open ↗
07/23/2021123802536Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00581900-I1Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/08/2021123802536Open ↗
07/07/2021123683530Open ↗
06/10/2021123683530Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
07/07/2021123683530Open ↗
07/07/2021123683530Open ↗
Showing 2 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS3
03/30/2021140848279Open ↗
03/24/2021123869251Open ↗
02/23/2021123683530Open ↗
▸BISPOST-INSTALLED ANCHORS2
08/09/2021123553751Open ↗
06/10/2021123683530Open ↗
▸Approvals, Objections & Sign-offs95
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST34
02/03/2023140882604Open ↗
01/20/2023140881437Open ↗
12/19/2022123663865Open ↗
Showing 3 of 34 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE18
11/08/2021123683530Open ↗
10/21/2021123683530Open ↗
09/07/2021123683530Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
12/28/2020123683530Open ↗
Showing 1 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISCCD1-Construction Code Determination6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL4
01/20/2023140882604Open ↗
01/17/2023140881437Open ↗
03/30/2021140848279Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Cost, Insurance & Ownership55
▸BISCOST AFFIDAVIT43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
01/20/2023140882604Open ↗
12/16/2022123683530Open ↗
12/16/2022123663865Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Filing & Intake Forms109
▸BISADDITIONAL INFORMATION51
11/16/2021123683530Open ↗
11/16/2021123683530Open ↗
08/13/2021123683530Open ↗
Showing 3 of 51 on file for this type
▸BISEFILING COVER SHEET34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISBOROUGH INTAKE FORM18
12/28/2020123683530Open ↗
12/21/2020123683530Open ↗
Showing 2 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents40
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION21
08/09/2021123553751Open ↗
03/24/2021123683530Open ↗
03/24/2021123683530Open ↗
Showing 3 of 21 on file for this type
▸BISSupporting Document: Fee Exempt5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDHCR DOCUMENT4
01/25/2023140882604Open ↗
01/19/2023140881437Open ↗
12/22/2020123802536Open ↗
Showing 3 of 4 on file for this type
▸BISLOFT BOARD CERTIFICATE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDHCR Document3
09/03/2026M00581900-I1Open ↗
09/03/2026M00581905-I1Open ↗
08/13/2026M00265651-I1Open ↗