ECB01/05/2026WORK WITHOUT A PERMIT. NOTED : AT TIME OF INSPECTION, OBSERVED AT REAR OF BUILDING, THE CMU BLOCK SHED WAS DEMOLISHED , THERE IS NO PERMIT IN DEPT RECORDS FOR THIS WORK ., OBTAIN PERMIT OR RESTORE PREMISES TO P$500 due
ECB04/01/2025FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OF A 2,5-STORY BUILDING 2-FAMILY DWELLING IN M1-1 LIGHT MANUFACTURING DISTRICT. I OBSERVED AT SEVERAL CRACKS TO THE EXTERIOR BUILDI$500 due
Two family frame · 3,900 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.