← Back
Office with commercial, 7-19 stories
13 WEST 36 STREET
MANHATTAN · BIN 1015931
💬 Discuss this project
1920Year Built
8Stories
O6Building Class
M1-9A/R12Zoning
17,786 sfGross Floor Area
8Units
1 Open Violation ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 1336 VENTURE LLC · 2,370 sf lot · 7.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof4p · 4 filings · 17 docs
CellarUnder Construction3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M RAPAPORT1507/08/2026
1336 VENTURE603/22/2026
OWNER OF 13 WEST 36 STREE103/22/2026
PHOENIX203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO203/21/2026
ADG ARCHITECTURE DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE METRO GROUP, INCGeneral Contractor303/21/2026
GRECO, STEVEElectrical203/21/2026
KAN ELEVATOR INCElectrical203/21/2026
SCHNEIDER, ALLANElectrical203/21/2026
A.MIRANDA CONTRACTING CORElectrical103/21/2026
JJ INNOVATIVE CORPGeneral Contractor107/08/2026
RUN RITE MECHANICAL CORPGeneral Contractor107/08/2026
JEONG YUNGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JKM ARCHITECTURE P.C.8906105/08/2026
ROYAL CONSTRUCTION P.E. S462102/09/2025
VINCENT J. LIOTTA P. E.1974103/18/2022
BRAD E. COHEN, PE434109/20/2019
Building Lifecycle
All (111)Filed (6)Permit Issued (10)Signed Off (3)Facade (FISP) (12)Violation (60)Inspection (6)Objection (3)Special Inspection (11)
07/28/2026
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01437019-I1
07/27/2026
Special inspection requirement — Final
Thomas Cataldo
07/09/2026
Signed off — Alteration
INSTALLATION OF SPLIT TYPE OF A/C UNIT AND EXTEND EXISITNG KITCHEN HOOD. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
M01383725-I1
05/28/2026
Permit issued — Mechanical Systems
M01383725-I1-MS
05/14/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Filed — Alteration
INSTALLATION OF SPLIT TYPE OF A/C UNIT AND EXTEND EXISITNG KITCHEN HOOD. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
M01383725-I1
05/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YOUNGSAM YU
04/23/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2026
Special inspection requirement — Final
John Min
04/07/2026
Special inspection requirement — Mechanical Systems
John Min
03/30/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/10/2026
Permit issued — Boiler Equipment
M00223414-I1-BE
01/08/2026
Signed off — Alteration
Chimney Replacement as per plans filed herewith. No changes to egress, use or occupancy.
M01168745-I1
10/08/2025
Permit issued — Mechanical Systems
M01168745-I1-MS
09/26/2025
Violation issued (FDNY_NOV, closed)
03/31/2025
Violation issued (FDNY_ORDER, closed)
03/31/2025
Violation issued (FDNY_ORDER, closed)
03/31/2025
Violation issued (FDNY_NOV, closed)
02/09/2025
Filed — Alteration
Chimney Replacement as per plans filed herewith. No changes to egress, use or occupancy.
M01168745-I1
10/29/2024
Permit issued — Boiler Equipment
M00223414-I1-BE
08/31/2023
Permit issued — Boiler Equipment
M00223414-I1-BE
09/13/2022
Permit issued — Boiler Equipment
M00223414-I1-BE
04/01/2022
Signed off — Alteration
REPLACEMENT OF 3 UNITS ON THE ROOFTOP WITH A TOTAL CAPACIT OF 13 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00693946-I1
03/30/2022
Permit issued — Mechanical Systems
M00693946-I1-MS
03/18/2022
Filed — Alteration
REPLACEMENT OF 3 UNITS ON THE ROOFTOP WITH A TOTAL CAPACIT OF 13 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00693946-I1
03/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
03/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
03/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
03/10/2022
Special inspection requirement — Maintenance information
Vincent Liotta
03/08/2022
Special inspection requirement — Final
Vincent Liotta
03/08/2022
Special inspection requirement — Mechanical Systems
Vincent Liotta
01/31/2022
Cycle 9 facade report submitted
01/31/2022
Cycle 9 facade report signed — SWARMP
01/25/2022
Cycle 9 facade inspection completed
08/30/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/30/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2021
Permit issued — Boiler Equipment
M00223414-I1-BE
11/17/2020
Permit issued — Boiler Equipment
M00223414-I1-BE
09/02/2020
Violation issued (FDNY_NOV, closed)
08/13/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/13/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/19/2019
Objection raised — Admin
12/19/2019
Objection raised — Other
12/19/2019
Objection raised — Energy
12/17/2019
Filed — Alteration
M00264724-I1
10/28/2019
Violation issued (FDNY_NOV, closed)
10/09/2019
Permit issued — Boiler Equipment
M00223414-I1-BE
09/20/2019
Filed — Alteration
M00223414-I1
09/06/2019
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Brad Cohen
07/08/2019
Violation issued (FDNY_NOV, closed)
07/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/10/2018
Violation issued (FDNY_NOV, closed)
10/10/2018
Violation issued (FDNY_NOV, closed)
09/05/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2018
Cycle 8 facade report submitted
01/29/2018
Cycle 8 facade report signed — SAFE
01/09/2018
Cycle 8 facade inspection completed
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJJ INNOVATIVE CORP05/28/2026
DOB NOWBoiler EquipmentPermit IssuedCOMMERCIAL COMBUSTION SER02/10/2026
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC10/08/2025
DOB NOWBoiler EquipmentSigned-offCOMMERCIAL COMBUSTION SER10/29/2024
DOB NOWBoiler EquipmentPermit IssuedCOMMERCIAL COMBUSTION SER08/31/2023
DOB NOWBoiler EquipmentPermit IssuedCOMMERCIAL COMBUSTION SER09/13/2022
DOB NOWMechanical SystemsSigned-offRUN RITE MECHANICAL CORP03/30/2022
DOB NOWBoiler EquipmentSigned-offCOMMERCIAL COMBUSTION SER03/23/2021
DOB NOWBoiler EquipmentSigned-offCOMMERCIAL COMBUSTION SER11/17/2020
DOB NOWBoiler EquipmentSigned-offCOMMERCIAL COMBUSTION SER10/09/2019
BISFPISSUEDMASTER FIRE SYSTEMS, INC05/12/2017
BISOTISSUEDCANIDO BASONAS CONSTRUCTI05/05/2017
BIS—ISSUEDMEGA WORK GROUP INC04/14/2017
BISPLISSUEDFLYTIGER P & H LTD04/14/2017
BISEQISSUEDPHOENIX SUTTON STR INC04/10/2017
BISOTISSUEDMEGA WORK GROUP INC03/15/2017
BISEQISSUEDMEGA WORK GROUP INC03/13/2017
BISMHISSUEDKABACK ENTERPRISES INC12/05/2014
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM06/20/2011
BISOTISSUEDMANIC MOORE MUSIC,INC.11/22/1999
BISEQISSUEDSPRING ENTERPRIS INC.08/30/1999
BISMHISSUEDDEDA JEWELRY CO06/02/1998
BISEQISSUEDSPRING SCAFFOLDING INC07/18/1997
1 project · most recent 05/08/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2026Signed-offJJ INNOVATIVE CORPAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-GX36NL 42,000 BTU · Exhaust Fan ×1
MUZ-GX36NL 42,000 BTU · Condensing Unit ×1
Ventilation
Delhi BI-27CW 750 CFM · Kitchen Exhaust ×1
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/14/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/30/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/27/2026FinalThomas Cataldoprogress
05/08/2026HVAC-R and service water piping design and insulationYOUNGSAM YUenergy_progress
04/07/2026FinalJohn Minprogress
04/07/2026Mechanical SystemsJohn Minspecial
03/10/2022HVAC-R and service water heating system controlsVincent Liottaenergy_progress
03/10/2022HVAC-R and service water heating equipmentVincent Liottaenergy_progress
03/10/2022HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
03/10/2022Maintenance informationVincent Liottaenergy_progress
03/08/2022FinalVincent Liottaprogress
03/08/2022Mechanical SystemsVincent Liottaspecial
09/06/2019Fuel-Oil Storage and Fuel-Oil Piping SystemsBrad Cohenspecial
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/02/2026M00693946-I1Request digital key ↗
08/24/2026M01168745-I1Request digital key ↗
08/17/2026M01383725-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00264724-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/05/2026M00223414-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION12
03/09/2018123031860Open ↗
05/23/2017123031860Open ↗
05/12/2017123031860Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION11
05/25/2017123091340Open ↗
05/15/2017123077945Open ↗
04/25/2017123031860Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/26/2017123031860Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/30/2011120726205Open ↗
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
04/20/2018123031851Open ↗
04/20/2018123031851Open ↗
02/20/2018123031860Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026M01383725-I1Open ↗
08/16/2026M01437019-I1Open ↗
08/13/2026M01168745-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
04/25/2017123077945Open ↗
04/06/2017140626614Open ↗
03/06/2017123031860Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
04/25/2017123077945Open ↗
03/06/2017123031860Open ↗
03/02/2017123031851Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/29/2026M00693946-I1Open ↗
09/29/2026M00693946-I1Open ↗
09/01/2026M01383725-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026M00693946-I1Open ↗
09/01/2026M01383725-I1Open ↗
08/22/2026M00223414-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/06/2017140626614Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/06/2017140626614Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/22/2008110173525Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE PERMITS2
07/16/2018123031860Open ↗
07/12/2016122202794Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/12/2017123031860Open ↗
03/06/2017123031860Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
12/15/2014122202794Open ↗
02/20/2018123031860Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/22/2008110173525Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
03/06/2017123031860Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/25/2017123077945Open ↗
04/21/2017123031860Open ↗
03/16/2017123031851Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M00223414-I1Open ↗
08/13/2026M01168745-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/22/2008110173525Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/22/2011120726205Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/20/2018123031851Open ↗
04/20/2018123031851Open ↗
02/20/2018123031860Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/20/2018123031851Open ↗
02/20/2018123031860Open ↗
10/12/2017123077945Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/06/2017140626614Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00693946-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00693946-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/06/2017140626614Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
04/20/2018123031851Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
04/20/2018123031851Open ↗
02/27/2018123031860Open ↗
02/20/2018123031860Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
03/09/2018123031860Open ↗
03/06/2017123031860Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/22/2011120726205Open ↗
05/22/2008110173525Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
04/20/2018123031851Open ↗
10/12/2017123077945Open ↗
09/22/2017123091340Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET7
04/25/2017123077945Open ↗
03/06/2017123031860Open ↗
03/02/2017123031851Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
04/20/2018123031851Open ↗
03/09/2018123031860Open ↗
02/27/2018123031860Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
07/05/2017123031860Open ↗
05/23/2017123031860Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/06/2017140626614Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/20/2017123031860Open ↗
03/06/2017123031860Open ↗
03/02/2017123031851Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
09/22/2017123091340Open ↗
▸BISPLOT DIAGRAM1
03/06/2017123031860Open ↗