1999Year Built
14Stories
H1Building Class
C5-PZoning
54,959 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: No Report Filed
Luxury hotel · Owner of record: BDC 56 LLC · 5,025 sf lot · 10.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP407/08/2026
ACE GROUP NY607/08/2026
BDC 562103/22/2026
FUJITECH AMERICA INC103/22/2026
BDC 56 LLC ELYSLEE HOTEL103/22/2026
OWNER OF 13 WEST 56 STREE203/22/2026
BDC 56TH STREET2103/21/2026
BDC 56 STREET503/21/2026
CASPI DEVELOPMENT503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALL IN PERMIT CONSULTANTS103/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor407/08/2026
OLIVER CHRISTOPHERElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
PARK CONTRACTING GROUPGeneral Contractor107/08/2026
NATIONAL MAINTENANCEScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE J. XERAKIAS, PE1658101/21/2026
Building Lifecycle
All (91)Filed (5)Permit Issued (5)Signed Off (1)Facade (FISP) (9)Violation (60)Objection (4)Special Inspection (7)
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/15/2026
Objection raised — Scope
09/15/2026
Objection raised — Cost
08/18/2026
Filed — Alteration
REPAIR EXISTING WALL AT ROOF (WEST ELEVATION)AS PER PLANS, NEW COPPING STONE AND WATERPROOFING AS PER DETAILS. NO CHANGE TO EXISTING ROOF ELEMENT, EGRESS, USE AND OCCUPANCY.
M01438021-I1
07/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/29/2026
Special inspection requirement — Masonry
07/29/2026
Special inspection requirement — Final
04/29/2026
Violation issued (HPD, closed)
A
01/30/2026
Permit issued — Suspended Scaffold
M01267583-I1-SC
01/21/2026
Filed — Alteration
Installation of outrigger for facade repair & inspection.
M01267583-I1
12/19/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01323965-I1
12/19/2025
Permit issued — Sidewalk Shed
M01323965-I1-SH
11/17/2025
Violation issued (HPD, closed)
I
08/06/2025
Special inspection requirement — Post-installed Anchors
George Xerakias
08/06/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
06/04/2025
Violation issued (HPD, closed)
A
05/01/2025
Violation issued (ECB, open)
Local Law
11/22/2024
Violation issued (HPD, closed)
I
04/01/2024
Violation issued (HPD, closed)
A
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2023
Permit issued — Supported Scaffold
M00840826-I1-SF
03/17/2023
Permit issued — Supported Scaffold
M00840826-I1-SH
03/16/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00840826-I1
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
06/22/2022
Violation issued (ECB, closed)
Construction
02/16/2022
Violation issued (HPD, closed)
A
01/13/2022
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY D/F BLADE SIGN FOR SONDER.
M00612440-I1
11/16/2021
Permit issued — Sign
M00612440-I1-SG
11/16/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2021
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY D/F BLADE SIGN FOR SONDER.
M00612440-I1
10/26/2021
Special inspection requirement — Final
SALVATOR CARADONNA
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
10/25/2019
Violation issued (HPD, closed)
I
10/17/2019
Cycle 8 facade report submitted
10/14/2019
Cycle 8 facade report signed — SAFE
09/12/2019
Cycle 8 facade inspection completed
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2018
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/26/2016
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/26/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/17/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/17/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/02/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedMONTERO GROUP, INC01/30/2026
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP12/19/2025
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP03/17/2023
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP03/17/2023
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC11/16/2021
BISPLISSUEDGENESIS PLBG AND HTG CORP02/10/2021
BISPLISSUEDGENESIS PLBG AND HTG CORP04/25/2019
BISOTISSUEDSAGEWOOD CONSTRUCTION & D04/18/2019
BISOTISSUEDCERTIFIED OF N.Y. INC03/04/2010
BISPLISSUEDCOLBREN PLBG & HTG INC02/09/2010
BISPLISSUEDTHE RIGHT CONNECTION P&H08/29/2006
BISEQISSUEDEVEREST SCAFFOLDING INC05/26/2006
BISBLISSUEDTHE RIGHT CONNECTION01/31/2006
BISMHISSUEDTHE RIGHT CONNECTION P&H, INC.05/27/2005
BISPLISSUEDTHE RIGHT CONNECTION P&H05/25/2005
BISPLISSUEDTHE RIGHT CONNECTION P&H05/20/2005
BISMHISSUEDTHE RIGHT CONNT PH INC.05/16/2005
BISPLISSUEDTHE RIGHT CONNECTION P&H11/14/2003
BISSPISSUEDRAM FIRE PROTECTION02/28/2001
BISPLISSUEDPACE PLUMBING CORP12/29/2000
BISBLISSUEDVILLAGE P & H NY INC12/14/2000
BISPLISSUEDVILLAGE P & H NY INC12/12/2000
BISSPISSUEDRAM FIRE PROTECTION CORP10/06/2000
BISFPISSUEDSENTINEL CONTROL INC08/31/2000
BISMHISSUEDBRONX BUILDERS05/31/2000
BISOTISSUEDBRONX BUILDERS05/31/2000
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING05/08/2000
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING05/08/2000
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING05/02/2000
BIS—ISSUEDHRH CONSTRUCTION CORP02/25/2000
BISEQISSUEDHRH CONSTRUCTION CORP.02/25/2000
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING01/06/2000
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING01/05/2000
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING11/01/1999
BISSPISSUEDLRAM FIRE PROTECTION CORP10/18/1999
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING10/12/1999
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING10/12/1999
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING09/08/1999
BISPLRE-ISSUEDVILLAGE P & H NY INC08/06/1999
BIS—ISSUEDHRH CONSTRUCTION CORP08/02/1999
+ 2 more permits on file
3 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedRICHARD NEU—
11/28/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
04/24/2019Permit IssuedTRINCITY ELECTRIC, INCGeneral Wiring
1 project · most recent 08/18/2026
Steel Masonry
FiledStatusContractorScope
08/18/2026——Steel, Masonry
2 projects · most recent 12/19/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
12/19/2025Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
03/16/2023Permit IssuedACE GROUP NY CORPScaffold, Sidewalk Shed
1 project · most recent 01/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/21/2026Permit IssuedMONTERO GROUP, INCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/29/2026Tenant Protection Plan Compliance—special
07/29/2026Structural Stability – Alterations of existing buildings—special
07/29/2026Masonry—special
07/29/2026Final—progress
08/06/2025Post-installed AnchorsGeorge Xerakiasspecial
08/06/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
10/26/2021FinalSALVATOR CARADONNAprogress
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00612440-I1Request digital key ↗
08/31/2026M00840826-I1Request digital key ↗
08/19/2026M01438021-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
01/19/2022123515240Open ↗
01/12/2022123515240Open ↗
05/06/2021123515240Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION3
04/26/2019123515240Open ↗
04/18/2019123515240Open ↗
03/08/2010120214133Open ↗
▸BISPLACE OF ASSEMBLY2
08/28/2019102691268Open ↗
08/14/2019102691268Open ↗
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION4
07/22/2010120238590Open ↗
07/21/2010120214133Open ↗
03/25/2019123515240Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026M00840826-I1Open ↗
08/19/2026M01438021-I1Open ↗
08/13/2026M01267583-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/25/2019123515240Open ↗
02/05/2014121912706Open ↗
12/02/2009120214133Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/25/2019123515240Open ↗
02/05/2014121912706Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026M01267583-I1Open ↗
08/25/2026M01267583-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/02/2009120214133Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M00612440-I1Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE4
08/04/2010120238590Open ↗
06/28/2010120238590Open ↗
06/08/2010120238590Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/19/2019123515240Open ↗
08/12/2019123515240Open ↗
03/25/2019123515240Open ↗
▸BISSCHEDULE B - PLUMBING2
01/12/2022123515240Open ↗
01/06/2010120238590Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
03/26/2019123515240Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
01/06/2010120238590Open ↗
12/02/2009120214133Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/25/2019123515240Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/16/2021123515240Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2021123515240Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/16/2021123515240Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS2
01/06/2010120238590Open ↗
12/02/2009120214133Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
07/22/2010120238590Open ↗
07/21/2010120214133Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/22/2010120238590Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
03/25/2019123515240Open ↗
07/22/2010120238590Open ↗
07/21/2010120214133Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/18/2021123515240Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION4
01/19/2022123515240Open ↗
05/06/2021123515240Open ↗
10/15/2019102691268Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
03/25/2019123515240Open ↗
02/05/2014121912706Open ↗
01/06/2010120238590Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
08/28/2019102691268Open ↗
08/14/2019102691268Open ↗
08/12/2019123515240Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸BISSupporting Document: Fee Exempt1
07/21/2010120214133Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/05/2014121912706Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01267583-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01267583-I1Open ↗