Church, synagogue, chapel
130-08 SPRINGFIELD BOULEVARD
QUEENS · St. Albans · BIN 4274212
💬 Discuss this project
1999Year Built
1Stories
M1Building Class
R2Zoning
11,256 sfGross Floor Area
1Units
0 Active Violations 2 likely answered ▸FDNY Report ↗
Church, synagogue, chapel · 21,649 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofChurch6p · 1 filing · 16 docs
Floor 21 filing · 6 docs
Floor 1Church12p · 3 filings · 16 docs
MezzanineChurch11p · 2 filings · 16 docs
CellarChurch16p · 3 filings · 16 docs
Filed — no permit issuedThe New Jerusalem Church of God3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New Jerusalem Church of God2403/21/2026
Church1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G R Restivo AIA807/02/2026
H G Lee Architect402/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ferrco Engineering703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vision 21General Contractor303/21/2026
G.M.A. Plumbing & HeatingPlumbing307/08/2026
Peak Fire ProtectionFire Protection207/08/2026
Intake Electric ContElectrical103/22/2026
Rigid Plumbing ContractorsFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS Engineers1442807/02/2026
Building Lifecycle
All (46)Filed (12)Permit Issued (7)Signed Off (2)Special Inspection (25)
07/07/2026
Special inspection requirement — Post-installed Anchors
Shamsul Siddique
07/02/2026
Filed — Alteration
Extension of existing gas piping on roof from existing 2" riser to new HVAC unit.
Q00982400-P2
07/01/2026
Special inspection requirement — Post-installed Anchors
Shamsul Siddique
06/05/2026
Permit issued — Plumbing
Q00982400-S1-PL
08/01/2025
Signed off — Alteration
PLANS FILE TO INSTALL NEW SPRINKLER SYSTEM TO EXISITNG COMMUNITY FACILITY. 113 SPRINKLER HEADS TO BE INSTALLED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527039-I1
05/12/2025
Permit issued — Plumbing
Q00982400-S1-PL
04/18/2025
Signed off — Alteration
Extension of existing gas piping on roof from existing 2" riser to new HVAC unit.
Q00982400-I1
03/19/2025
Permit issued — Plumbing
Q00982400-S1-PL
01/13/2025
Special inspection requirement — Duct leakage testing, insulation and design
Shamsul Siddique
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shamsul Siddique
01/13/2025
Special inspection requirement — Post-installed Anchors
Shamsul Siddique
01/13/2025
Special inspection requirement — Mechanical Systems
Shamsul Siddique
01/13/2025
Special inspection requirement — Final
Shamsul Siddique
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Shamsul Siddique
01/13/2025
Special inspection requirement — Permanent certificate
Shamsul Siddique
01/13/2025
Special inspection requirement — Maintenance information
Shamsul Siddique
01/13/2025
Special inspection requirement — Ventilation and air distribution system
Shamsul Siddique
01/10/2025
Filed — Alteration
Extension of existing gas piping on roof from existing 2" riser to new HVAC unit.
Q00982400-P1
01/10/2025
Special inspection requirement — Mechanical Systems
Shamsul Siddique
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shamsul Siddique
01/10/2025
Special inspection requirement — Post-installed Anchors
Shamsul Siddique
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Shamsul Siddique
01/10/2025
Special inspection requirement — Final
Shamsul Siddique
01/10/2025
Special inspection requirement — Ventilation and air distribution system
Shamsul Siddique
01/10/2025
Special inspection requirement — Maintenance information
Shamsul Siddique
01/10/2025
Special inspection requirement — Permanent certificate
Shamsul Siddique
01/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Shamsul Siddique
08/08/2024
Special inspection requirement — Sprinkler Systems
Shamsul Siddique
08/07/2024
Filed — Alteration
PLANS FILE TO INSTALL NEW SPRINKLER SYSTEM TO EXISITNG COMMUNITY FACILITY. 113 SPRINKLER HEADS TO BE INSTALLED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527039-P3
07/23/2024
Special inspection requirement — Sprinkler Systems
Shamsul Siddique
04/16/2024
Permit issued — Mechanical Systems
Q00982400-I1-MS
04/15/2024
Permit issued — Sprinklers
Q00527039-I1-EW-SP
03/14/2024
Permit issued — Sprinklers
Q00527039-I1-EW-SP
02/01/2024
Filed — Alteration
Extension of existing gas piping on roof from existing 2" riser to new HVAC unit.
Q00982400-I1
02/01/2024
Filed — Alteration
Extension of existing gas piping on roof from existing 2" riser to new HVAC unit.
Q00982400-S1
08/29/2023
Filed — Alteration
PLANS FILE TO INSTALL NEW SPRINKLER SYSTEM TO EXISITNG COMMUNITY FACILITY. 113 SPRINKLER HEADS TO BE INSTALLED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527039-P2
07/17/2023
Filed — Alteration
PLANS FILE TO INSTALL NEW SPRINKLER SYSTEM TO EXISITNG COMMUNITY FACILITY. 113 SPRINKLER HEADS TO BE INSTALLED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527039-P1
06/26/2023
Special inspection requirement — Sprinkler Systems
Shamsul Siddique
03/02/2023
Special inspection requirement — Public Assembly Emergency Lighting
He Gin Lee
02/10/2023
Filed — No Work
Q08038758-P1
02/10/2023
Special inspection requirement — Public Assembly Emergency Lighting
He Gin Lee
01/03/2023
Filed — No Work
Q08038758-I1
09/23/2021
Permit issued — Sprinklers
Q00527039-I1-EW-SP
09/21/2021
Filed — Alteration
PLANS FILE TO INSTALL NEW SPRINKLER SYSTEM TO EXISITNG COMMUNITY FACILITY. 113 SPRINKLER HEADS TO BE INSTALLED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00527039-I1
05/15/2020
Filed — Alteration
1. NEW TEMP. CONSTRUCTION FENCE. 2. IN CONJUNCTION WITH JOB#421861471.
Q00296146-P1
03/05/2020
Filed — Alteration
1. NEW TEMP. CONSTRUCTION FENCE. 2. IN CONJUNCTION WITH JOB#421861471.
Q00296146-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedG.M.A. Plumbing & Heating06/05/2026
DOB NOWPlumbingPermit IssuedG.M.A. Plumbing & Heating05/12/2025
DOB NOWPlumbingPermit IssuedG.M.A. Plumbing & Heating03/19/2025
DOB NOWMechanical SystemsSigned-offVision 2104/16/2024
DOB NOWSprinklersSigned-offRigid Plumbing Contractors04/15/2024
DOB NOWSprinklersSigned-offPeak Fire Protection03/14/2024
DOB NOWSprinklersSigned-offPeak Fire Protection09/23/2021
BIS—ISSUEDA.N.C. Contracting Co06/18/2024
BIS—ISSUEDTemple Developers08/08/2023
BIS—ISSUEDTemple Developers05/04/2022
BISPLISSUEDRka Piping and Heating09/23/2021
BISPLISSUEDBT's Plumbing and Heating11/25/2020
BIS—ISSUEDTemple Developers09/01/2020
BIS—ISSUEDTemple Developers03/17/2020
BISPLISSUEDDavid Jablon03/21/2016
BISFPISSUEDFire Command Co03/17/2016
BISPLISSUEDDavid Jablon02/19/2015
BISOTISSUEDNew Jerusalem Church of God10/01/2014
BISPLISSUEDDavid Jablon04/01/2014
BISPLISSUEDDavid Jablon07/09/2013
BISMHISSUEDLa Croix01/18/2013
BISFPISSUEDFire Command Co08/27/2001
BISPLISSUEDM & J Plumbing & Heating Mechanical01/04/2001
BISOTISSUEDBedkris Realty04/26/2000
BIS—ISSUEDBL Sherman Cons04/26/2000
BISPLISSUEDByrne & Sons12/15/1999
BISMHISSUEDSherman Construction11/04/1999
BIS—ISSUEDBL Sherman Cons03/12/1999
BISEQISSUEDB.L. Sherman Construction, Ltd/02/18/1999
BIS—ISSUEDB.L. Sherman Construction, Ltd/02/18/1999
BIS—ISSUEDBL Sherman Cons04/06/1998
BIS—ISSUEDBL Sherman Cons03/10/1998
1 project · most recent 07/02/2026
Gas
FiledStatusContractorScope
07/02/2026Permit IssuedG.M.A. Plumbing & HeatingGas
1 project · most recent 10/25/2023
General Wiring
FiledStatusContractorScope
10/25/2023CompleteIntake Electric ContGeneral Wiring
1 project · most recent 05/15/2020
Fence
FiledStatusContractorScope
05/15/2020——Fence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/07/2026Post-installed AnchorsShamsul Siddiquespecial
07/01/2026Post-installed AnchorsShamsul Siddiquespecial
01/13/2025Duct leakage testing, insulation and designShamsul Siddiqueenergy_progress
01/13/2025Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
01/13/2025Post-installed AnchorsShamsul Siddiquespecial
01/13/2025Mechanical SystemsShamsul Siddiquespecial
01/13/2025FinalShamsul Siddiqueprogress
01/13/2025Energy Code Compliance InspectionsShamsul Siddiqueprogress
01/13/2025Permanent certificateShamsul Siddiqueenergy_progress
01/13/2025Maintenance informationShamsul Siddiqueenergy_progress
01/13/2025Ventilation and air distribution systemShamsul Siddiqueenergy_progress
01/10/2025Mechanical SystemsShamsul Siddiquespecial
01/10/2025Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
01/10/2025Post-installed AnchorsShamsul Siddiquespecial
01/10/2025Energy Code Compliance InspectionsShamsul Siddiqueprogress
01/10/2025FinalShamsul Siddiqueprogress
01/10/2025Ventilation and air distribution systemShamsul Siddiqueenergy_progress
01/10/2025Maintenance informationShamsul Siddiqueenergy_progress
01/10/2025Permanent certificateShamsul Siddiqueenergy_progress
01/10/2025Duct leakage testing, insulation and designShamsul Siddiqueenergy_progress
08/08/2024Sprinkler SystemsShamsul Siddiquespecial
07/23/2024Sprinkler SystemsShamsul Siddiquespecial
06/26/2023Sprinkler SystemsShamsul Siddiquespecial
03/02/2023Public Assembly Emergency LightingHe Gin Leeprogress
02/10/2023Public Assembly Emergency LightingHe Gin Leeprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
ChurchReligiousCellar, Floor 1, Mezzanine, Roof
Project Q00982400 Alteration · Permit Entire · 02/01/2024
Project Q00527039 Alteration · LOC Issued · 09/21/2021
The New Jerusalem Church of GodReligious—
Project Q00296146 Alteration · Approved · 03/05/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 182 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch8
08/21/2026Q00527039-P3Request digital key ↗
08/21/2026Q00527039-P2Request digital key ↗
08/21/2026Q00527039-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00296146-I1Request digital key ↗
08/15/2026Q00296146-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/25/2026Q08038758-I1Request digital key ↗
08/14/2026Q08038758-P1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION11
08/22/2024421861471Open ↗
12/27/2019421861471Open ↗
12/06/2019421861471Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION10
07/11/2025421861471Open ↗
06/06/2025421861471Open ↗
07/11/2022421861471Open ↗
Showing 3 of 10 on file for this type
▸BISPLACE OF ASSEMBLY8
06/29/2015420627272Open ↗
06/22/2015420627272Open ↗
04/18/2015420627272Open ↗
Showing 3 of 8 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/17/2013420789588Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
01/09/2020421861471Open ↗
▸Seals & Professional Certifications52
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
01/23/2020421861471Open ↗
10/03/2019421861471Open ↗
10/03/2019421861471Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/26/2026Q08038758-I1Open ↗
08/25/2026Q08038758-P1Open ↗
08/25/2026Q00982400-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026Q00296146-I1Open ↗
08/28/2026Q00296146-P1Open ↗
08/25/2026Q08038758-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/03/2026Q00527039-P3Open ↗
09/22/2026Q00982400-S1Open ↗
09/02/2026Q00527039-P1Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/14/2019421861471Open ↗
11/05/2015421228610Open ↗
▸BISEQUIPMENT USE PERMITS1
04/18/2013420789588Open ↗
▸BISSCHEDULE B - PLUMBING1
08/22/2024421861471Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
05/20/2014420845919Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/17/2013420789588Open ↗
▸Safety & Tenant Protection2
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/23/2020421861471Open ↗
▸BISSTREET TREE CHECKLIST1
09/09/2019421861471Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
06/10/2013420845919Open ↗
09/28/2012420627290Open ↗
09/28/2012420627272Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q00527039-P2Open ↗
08/21/2026Q00527039-P1Open ↗
08/21/2026Q00527039-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/03/2019421861471Open ↗
11/05/2015421228610Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/23/2020421861471Open ↗
10/03/2019421861471Open ↗
05/14/2019421861471Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
04/17/2013420789588Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00982400-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: SOIL INSPECTION3
03/23/2020421861471Open ↗
10/03/2019421861471Open ↗
09/09/2019421861471Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/23/2020421861471Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
10/03/2019421861471Open ↗
▸Approvals, Objections & Sign-offs37
▸BISLETTERS - SUPPORTING DOCUMENTATION12
07/14/2025421861471Open ↗
07/11/2022421861471Open ↗
05/14/2019421861471Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/21/2026Q00982400-I1Open ↗
08/21/2026Q00982400-S1Open ↗
08/21/2026Q00982400-P1Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
10/10/2019421861471Open ↗
08/06/2019421861471Open ↗
08/03/2019421861471Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/10/2013420845919Open ↗
01/08/2013420789588Open ↗
09/28/2012420627290Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/08/2017400601728Open ↗
05/31/2016421228610Open ↗
01/30/2015420845919Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
10/05/2021421861471Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT5
05/14/2019421861471Open ↗
05/31/2016421228610Open ↗
11/05/2015421228610Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
12/01/2025421861471Open ↗
07/11/2022421861471Open ↗
10/03/2019421861471Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
05/14/2019421861471Open ↗
11/05/2015421228610Open ↗
06/10/2013420845919Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
07/14/2025421861471Open ↗
12/27/2019421861471Open ↗
12/06/2019421861471Open ↗
▸BISADDITIONAL INFORMATION1
07/19/2022421861471Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
08/06/2019421861471Open ↗
05/14/2019421861471Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/23/2020421861471Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
05/31/2016421228610Open ↗