← Back
BuildNYC
Cape Cod
130-13 FOCH BOULEVARD
QUEENS · South Ozone Park · BIN 4252798
💬 Discuss this project
1930Year Built
2Stories
A0Building Class
R3-2Zoning
1,800 sfGross Floor Area
1Units
Cape Cod · 4,200 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed Photovoltaic Power System1 filing · 5 docs
Floor 2Convert one family to two family house with interior renovat1 filing · 9 docs
Floor 1Convert one family to two family house with interior renovat1 filing · 9 docs
CellarConvert one family to two family house with interior renovat1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/11/2025$920K—Private party → Private party$511/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering110/09/2026
SU Architect206/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSspecialty_contractor110/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841110/09/2026
SU Architect6857206/05/2025
Building Lifecycle
11/04/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Q01471018-I1
10/15/2026
Permit issued — Solar
Q01471018-I1-SL
10/09/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Q01471018-I1
10/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
10/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
32 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS10/15/2026
1 project · most recent 06/05/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/05/2025——Gas, Water/Sanitary
1 project · most recent 10/09/2026
FiledStatusContractorScope
10/09/2026CompleteNY Solar Electrical—
1 project · most recent 10/09/2026
FiledStatusContractorScope
10/09/2026Signed-offNYSS—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/07/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
10/07/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
10/07/2026Energy Code Compliance InspectionsROBERT MASONEprogress
10/07/2026FinalROBERT MASONEprogress
10/07/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
05/02/2025Fenestration areasQIANG SUenergy_progress
05/02/2025Air barrier - visual inspectionQIANG SUenergy_progress
05/02/2025Fenestration air leakageQIANG SUenergy_progress
05/02/2025Fenestration and door U-factor and product ratingsQIANG SUenergy_progress
05/02/2025Fire-Resistant Penetrations and JointsQIANG SUspecial
05/02/2025Permanent certificateQIANG SUenergy_progress
05/02/2025MeteringQIANG SUenergy_progress
05/02/2025Interior lighting powerQIANG SUenergy_progress
05/02/2025Maintenance informationQIANG SUenergy_progress
05/02/2025Tenant Protection Plan ComplianceQIANG SUspecial
05/02/2025Energy Code Compliance InspectionsQIANG SUprogress
05/02/2025Fire-Resistance Rated ConstructionQIANG SUprogress
05/02/2025Air barrier — testing QIANG SUenergy_progress
14 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account