← Back
Two stories - detached, small or mid-size
130-20 135 PLACE
QUEENS · South Ozone Park · BIN 4255645
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3-2Zoning
1,166 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC109/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272109/20/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Violation (1)Special Inspection (5)
09/30/2024
Permit issued — Solar
Q01112589-I1-SL
09/20/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01112589-I1
09/17/2024
Special inspection requirement — Final
Walid Abdulla
09/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/17/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/25/2003
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/30/2024
1 project · most recent 09/20/2024
FiledStatusContractorScope
09/20/2024CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 09/20/2024
FiledStatusContractorScope
09/20/2024Signed-offSUNRUN INSTALLATION SVC10 panels, 4.1 kw, 211.3 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/17/2024FinalWalid Abdullaprogress
09/17/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/17/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/17/2024Energy Code Compliance InspectionsWalid Abdullaprogress
09/17/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01112589-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026Q01112589-I1Open ↗
09/02/2026Q01112589-I1Open ↗
09/02/2026Q01112589-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01112589-I1Open ↗
09/02/2026Q01112589-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01112589-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01112589-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01112589-I1Open ↗