← Back
BuildNYC
Multi-story retail building (2+)
130-20 FARMERS BOULEVARD
QUEENS · BIN 4270452
💬 Discuss this project
2017Year Built
2Stories
K2Building Class
R5DZoning
18,971 sfGross Floor Area
1Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 130-20 Farmers · 27,730 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCityMD3p · 1 filing · 17 docs
Floor 2PureGym, Blink12p · 5 filings · 15 docs
Floor 1CityMD, Blink33p · 6 filings · 20 docs
Site & exteriorPureGym, CityMD12p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
130-20 Farmers3103/22/2026
Platinum Realty Associates2407/08/2026
BW 450 St Marks1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Thomas A Scibilia301/16/2026
Leon Skvirsky PE508/18/2025
Concept Design Group407/15/2022
Salvator A. Caradonna JR202/11/2021
HC Engineering502/25/2019
Enthink Engineers108/09/2018
Valentino Pompeo Architect201/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar1003/21/2026
Design42 Architecture603/21/2026
All in Permit Consultants203/21/2026
Concept Design Group203/21/2026
JP Expedite1003/21/2026
Dawn Kantor Enterprises203/21/2026
Haider Engineering, P.E103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Signs CadSign hanger507/08/2026
Capitol Design & MaintenanceSign hanger507/08/2026
Reliable EnterprisesScaffold407/08/2026
AB Capstone BuildersScaffold303/21/2026
Safety Fire SprinklerFire Protection207/08/2026
Balaton ConsultingSign hanger207/08/2026
Troy ContractorGeneral Contractor107/08/2026
Marotta & Son P&H ContractingPlumbing107/08/2026
Power Plumbing & HeatingPlumbing107/08/2026
JKT ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG Architects LLC /Dba1327407/15/2022
Building Lifecycle
All (99)Filed (22)Permit Issued (21)Signed Off (18)Violation (15)Special Inspection (23)
01/16/2026
Filed — No Work
Q01345590-I1
12/15/2025
Violation issued (FDNY_ORDER, closed)
12/15/2025
Violation issued (FDNY_ORDER, closed)
11/26/2025
Signed off — Alteration
NEW PARTIAL HEIGHT INTERIOR NON-BEARING PARTITIONS AND ENTRY CHECK-IN DOORS ON SECOND FLOOR. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS.
Q01257811-I1
10/08/2025
Signed off — Alteration
REPLACEMENT OF ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN FILED UNDER JOB # Q00115519 - IN PROPERTY LINES - PUREGYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01268743-I1
10/08/2025
Signed off — Alteration
Q01268745-I1
10/08/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - PUREGYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01268742-I1
10/08/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - PUREGYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01268746-I1
10/08/2025
Signed off — Alteration
REPLACEMENT OF ILLUMINATED NON-ADVERTISING ACCESSOR WALL SIGN FILED UNDER JOB # Q00115565 - IN PROPERTY LINES - PUREGYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01268744-I1
08/19/2025
Permit issued — Sign
Q01268744-I1-SG
08/19/2025
Permit issued — Sign
Q01268742-I1-SG
08/19/2025
Permit issued — Sign
Q01268746-I1-SG
08/19/2025
Permit issued — Sign
Q01268745-I1-SG
08/19/2025
Permit issued — Sign
Q01268743-I1-SG
08/18/2025
Filed — Alteration
Q01268745-I1
08/18/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - PUREGYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01268742-I1
08/18/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - PUREGYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01268746-I1
08/18/2025
Filed — Alteration
REPLACEMENT OF ILLUMINATED NON-ADVERTISING ACCESSOR WALL SIGN FILED UNDER JOB # Q00115565 - IN PROPERTY LINES - PUREGYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01268744-I1
08/18/2025
Special inspection requirement — Final
LEON SKVIRSKY
08/15/2025
Filed — Alteration
REPLACEMENT OF ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN FILED UNDER JOB # Q00115519 - IN PROPERTY LINES - PUREGYM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01268743-I1
08/15/2025
Special inspection requirement — Final
LEON SKVIRSKY
08/15/2025
Special inspection requirement — Final
LEON SKVIRSKY
08/01/2025
Permit issued — General Construction
Q01257811-I1-GC
07/24/2025
Filed — Alteration
NEW PARTIAL HEIGHT INTERIOR NON-BEARING PARTITIONS AND ENTRY CHECK-IN DOORS ON SECOND FLOOR. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS.
Q01257811-P1
07/22/2025
Filed — Alteration
NEW PARTIAL HEIGHT INTERIOR NON-BEARING PARTITIONS AND ENTRY CHECK-IN DOORS ON SECOND FLOOR. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS.
Q01257811-I1
01/23/2025
Violation issued (FDNY_NOV, closed)
08/23/2024
Violation issued (FDNY_NOV, closed)
08/23/2024
Violation issued (FDNY_NOV, closed)
04/06/2023
Signed off — Alteration
Q00464397-I1
04/06/2023
Signed off — Alteration
Q00464345-I1
07/18/2022
Signed off — Alteration
Install split HVAC system and associated duct and piping, ductwork for existing RTU's
Q00428702-I1
07/18/2022
Special inspection requirement — HVAC and service water heating system controls
Yongho Kim
07/18/2022
Special inspection requirement — HVAC insulation and sealing
Yongho Kim
07/18/2022
Special inspection requirement — Shutoff dampers
Yongho Kim
07/18/2022
Special inspection requirement — HVAC and service water heating equipment
Yongho Kim
07/18/2022
Special inspection requirement — Mechanical Systems
Yongho Kim
07/18/2022
Special inspection requirement — Final
Yongho Kim
07/15/2022
Filed — Alteration
Install split HVAC system and associated duct and piping, ductwork for existing RTU's
Q00428702-P1
07/15/2022
Special inspection requirement — Final
Yongho Kim
07/15/2022
Special inspection requirement — HVAC and service water heating equipment
Yongho Kim
07/15/2022
Special inspection requirement — Shutoff dampers
Yongho Kim
07/15/2022
Special inspection requirement — HVAC and service water heating system controls
Yongho Kim
07/15/2022
Special inspection requirement — HVAC insulation and sealing
Yongho Kim
07/15/2022
Special inspection requirement — Mechanical Systems
Yongho Kim
06/14/2022
Signed off — Alteration
modify the existing sprinkler system.
Q00428706-I1
11/11/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2021
Signed off — Alteration
Q00428705-I1
04/21/2021
Permit issued — Sprinklers
Q00428706-I1-EW-SP
02/19/2021
Permit issued — Sign
Q00464345-I1-SG
02/19/2021
Permit issued — Sign
Q00464397-I1-SG
02/11/2021
Filed — Alteration
Q00464397-I1
02/11/2021
Filed — Alteration
Q00464345-I1
02/02/2021
Special inspection requirement — Final
SALVATOR CARADONNA
02/02/2021
Special inspection requirement — Final
SALVATOR CARADONNA
01/13/2021
Permit issued — Plumbing
Q00428705-I1-PL
01/08/2021
Permit issued — Plumbing
Q00428705-I1-PL
01/07/2021
Permit issued — Mechanical Systems
Q00428702-I1-MS
01/04/2021
Permit issued — Sprinklers
Q00428706-I1-EW-SP
12/31/2020
Filed — Alteration
Install split HVAC system and associated duct and piping, ductwork for existing RTU's
Q00428702-I1
12/31/2020
Filed — Alteration
modify the existing sprinkler system.
Q00428706-I1
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offCapitol Design & Maintenance08/19/2025
DOB NOWSignSigned-offCapitol Design & Maintenance08/19/2025
DOB NOWSignSigned-offCapitol Design & Maintenance08/19/2025
DOB NOWSignSigned-offCapitol Design & Maintenance08/19/2025
DOB NOWSignSigned-offCapitol Design & Maintenance08/19/2025
DOB NOWGeneral ConstructionSigned-offJKT Construction08/01/2025
DOB NOWSprinklersSigned-offSafety Fire Sprinkler04/21/2021
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/19/2021
DOB NOWSignSigned-offNorth Shore Neon Sign Co02/19/2021
DOB NOWPlumbingSigned-offPower Plumbing & Heating01/13/2021
DOB NOWPlumbingSigned-offMarotta & Son P&H Contracting01/08/2021
DOB NOWMechanical SystemsSigned-offTroy Contractor01/07/2021
DOB NOWSprinklersSigned-offSafety Fire Sprinkler01/04/2021
DOB NOWSidewalk ShedSigned-offReliable Enterprises03/08/2019
DOB NOWSignSigned-offSigns Cad02/25/2019
DOB NOWSignSigned-offSigns Cad02/25/2019
DOB NOWSignSigned-offSigns Cad02/25/2019
DOB NOWSignSigned-offSigns Cad02/25/2019
DOB NOWSignSigned-offSigns Cad02/25/2019
DOB NOWSidewalk ShedSigned-offReliable Enterprises08/09/2018
DOB NOWConstruction FenceSigned-offAB Capstone Builders11/16/2017
BISOTISSUEDTroy Contractor01/28/2021
BISOTISSUEDTroy Contractor12/31/2020
BISPLISSUEDL&J PLG & Heating Co of NY02/03/2020
BISOTISSUEDJKT Construction04/16/2019
BIS—ISSUEDAB Capstone Builders04/01/2019
BISPLISSUEDL&J PLG & Heating Co of NY11/26/2018
BISEQISSUEDAB Capstone Builders11/01/2018
BIS—ISSUEDAB Capstone Builders11/01/2018
BIS—ISSUEDAB Capstone Builders07/23/2018
BIS—ISSUEDAB Capstone Builders12/14/2017
BISEQISSUEDAB Capstone Builders12/14/2017
BIS—ISSUEDAB Capstone Builders12/14/2017
BIS—ISSUEDSano Wrecking08/11/2017
BISEQISSUEDSano Wrecking08/09/2017
13 projects · most recent 02/22/2021
General Wiring
FiledStatusContractorScope
02/22/2021Permit IssuedPower Electrical ContsGeneral Wiring
02/16/2021CompleteRainbow Electric Co—
02/16/2021CompleteRainbow Electric Co—
12/06/2019CompleteBorrelli ElectricGeneral Wiring
07/04/2019CompleteBorrelli ElectricGeneral Wiring
04/10/2019CompleteGemini Electric CoGeneral Wiring
03/14/2019CompleteAmpere Electrical Services—
03/14/2019CompleteAmpere Electrical Services—
03/14/2019CompleteAmpere Electrical Services—
03/14/2019CompleteAmpere Electrical Services—
03/14/2019CompleteAmpere Electrical Services—
03/10/2019CompleteJam Electrical—
07/26/2018CompleteRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/18/2025FinalLEON SKVIRSKYprogress
08/15/2025FinalLEON SKVIRSKYprogress
08/15/2025FinalLEON SKVIRSKYprogress
07/18/2022HVAC and service water heating system controls Yongho Kimenergy_progress
07/18/2022HVAC insulation and sealing Yongho Kimenergy_progress
07/18/2022Shutoff dampersYongho Kimenergy_progress
07/18/2022HVAC and service water heating equipment Yongho Kimenergy_progress
07/18/2022Mechanical SystemsYongho Kimspecial
07/18/2022FinalYongho Kimprogress
07/15/2022FinalYongho Kimprogress
07/15/2022HVAC and service water heating equipment Yongho Kimenergy_progress
07/15/2022Shutoff dampersYongho Kimenergy_progress
07/15/2022HVAC and service water heating system controls Yongho Kimenergy_progress
07/15/2022HVAC insulation and sealing Yongho Kimenergy_progress
07/15/2022Mechanical SystemsYongho Kimspecial
02/02/2021FinalSALVATOR CARADONNAprogress
02/02/2021FinalSALVATOR CARADONNAprogress
11/16/2020Sprinkler SystemsYongho Kimspecial
01/03/2019FinalHackjong Choiprogress
01/03/2019FinalHackjong Choiprogress
01/03/2019FinalHackjong Choiprogress
01/03/2019FinalHackjong Choiprogress
01/03/2019FinalHackjong Choiprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
PureGymFitness / RecreationFloor 2
Project Q01345590 No Work · PA Certificate of Operation Issued · 01/16/2026
Project Q01268742 Alteration · LOC Issued · 08/18/2025
Project Q01268744 Alteration · LOC Issued · 08/18/2025
Project Q01268745 Alteration · LOC Issued · 08/18/2025
Project Q01268746 Alteration · LOC Issued · 08/18/2025
Project Q01268743 Alteration · LOC Issued · 08/15/2025
Project Q01257811 Alteration · LOC Issued · 07/22/2025
CityMDMedical / HealthcareFloor 1
Project Q00464345 Alteration · LOC Issued · 02/11/2021
Project Q00464397 Alteration · LOC Issued · 02/11/2021
Project Q00428702 Alteration · LOC Issued · 12/31/2020
Project Q00428705 Alteration · LOC Issued · 12/31/2020
Project Q00428706 Alteration · LOC Issued · 12/31/2020
BlinkFitness / RecreationFloors 1, 2
Project Q00115501 Alteration · LOC Issued · 02/25/2019
Project Q00115519 Alteration · LOC Issued · 02/25/2019
Project Q00115530 Alteration · LOC Issued · 02/25/2019
Project Q00115536 Alteration · LOC Issued · 02/25/2019
Project Q00115565 Alteration · LOC Issued · 02/25/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 317 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch10
08/29/2026Q00001246-P1Request digital key ↗
08/29/2026Q00001246-I1Request digital key ↗
08/28/2026Q00065452-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sign7
08/28/2026Q00115530-I1Request digital key ↗
08/28/2026Q00115501-I1Request digital key ↗
08/28/2026Q00115536-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026Q00428702-P1Request digital key ↗
08/26/2026Q00428702-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/27/2026Q00428706-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/17/2026Q01345590-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00428705-I1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION26
12/23/2020440659556Open ↗
12/05/2020421517264Open ↗
12/01/2020421517264Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION17
12/31/2020440659556Open ↗
07/29/2019440534067Open ↗
07/18/2019440534067Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
09/03/2020421517264Open ↗
09/03/2020421517264Open ↗
04/24/2020421517264Open ↗
▸BISPLACE OF ASSEMBLY2
11/10/2018421689596Open ↗
11/10/2018421689596Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
11/06/2017421517264Open ↗
Showing 1 of 2 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/29/2026Q00001246-I1Open ↗
08/29/2026Q00001246-P1Open ↗
08/28/2026Q00115501-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/02/2026Q00428702-I1Open ↗
09/02/2026Q00428702-I1Open ↗
09/02/2026Q00428702-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/12/2020421517264Open ↗
03/07/2020440534067Open ↗
11/15/2019440534067Open ↗
Showing 3 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/23/2020440659556Open ↗
04/03/2019440534067Open ↗
10/24/2017440444495Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/23/2020440659556Open ↗
04/03/2019440534067Open ↗
10/24/2017440444495Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/23/2020440659556Open ↗
04/03/2019440534067Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q00428702-I1Open ↗
09/01/2026Q00428706-I1Open ↗
08/26/2026Q00428702-P1Open ↗
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
04/23/2020421517264Open ↗
04/23/2020421517264Open ↗
04/23/2020421517264Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
12/15/2020421517264Open ↗
09/23/2020421517264Open ↗
09/23/2020421517264Open ↗
▸BISELECTRIC CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/26/2020421689596Open ↗
▸BISEQUIPMENT USE PERMITS1
01/11/2021421517264Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
09/03/2020421517264Open ↗
06/30/2020421542664Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/19/2017421517264Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
03/24/2020421517264Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES SITE PLAN1
06/30/2020421542664Open ↗
▸Environmental & Asbestos2
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/31/2020440659556Open ↗
12/29/2020440659556Open ↗
05/13/2020440534067Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/22/2019421517264Open ↗
12/19/2017421517264Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/23/2020440659556Open ↗
04/03/2019440534067Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/13/2020440534067Open ↗
10/22/2019421517264Open ↗
▸BISNYCECC ANALYSIS2
12/23/2020440659556Open ↗
04/03/2019440534067Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/15/2022440659556Open ↗
▸BISEMERGENCY LIGHTING - PA1
10/26/2020421689596Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/15/2022440659556Open ↗
▸BISLIGHTING CONTROLS1
07/15/2022440659556Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY11
12/29/2020440659556Open ↗
12/28/2020440659556Open ↗
10/26/2020421689596Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/03/2020421517264Open ↗
12/19/2017421517264Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
11/08/2017421517264Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/15/2022440659556Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/15/2022440659556Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/19/2017421517264Open ↗
▸Approvals, Objections & Sign-offs28
▸BISLETTERS - SUPPORTING DOCUMENTATION13
10/26/2020421689596Open ↗
10/26/2020421689596Open ↗
12/14/2018421689596Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
07/18/2022440659556Open ↗
12/17/2020421517264Open ↗
11/05/2020421517264Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/05/2020421517264Open ↗
12/01/2020421517264Open ↗
10/17/2018421517264Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
04/05/2019421517264Open ↗
08/03/2018421517264Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/10/2020421542664Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
07/15/2022440659556Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT5
12/23/2020440659556Open ↗
05/29/2020421674343Open ↗
05/19/2020440534067Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
11/26/2018421517264Open ↗
12/19/2017421517264Open ↗
Showing 2 of 3 on file for this type
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
06/30/2020421542664Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/15/2022440659556Open ↗
▸Filing & Intake Forms35
▸BISADDITIONAL INFORMATION21
09/03/2020421517264Open ↗
07/29/2020440534067Open ↗
07/10/2020421542664Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET6
12/12/2018421674343Open ↗
Showing 1 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
04/23/2020421517264Open ↗
04/23/2020421517264Open ↗
04/13/2020421517264Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/23/2020440659556Open ↗
04/03/2019440534067Open ↗
Showing 2 of 3 on file for this type
▸Other Documents24
▸BISBPP - SUPPORTING DOCUMENTATION15
07/10/2020421542664Open ↗
07/10/2020421542664Open ↗
07/10/2020421542664Open ↗
Showing 3 of 15 on file for this type
▸BISPLOT DIAGRAM3
10/22/2019421517264Open ↗
Showing 1 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
11/05/2020421517264Open ↗
09/03/2020421517264Open ↗
09/03/2020421517264Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/26/2020421689596Open ↗
▸BISPRELIMINARY1
07/15/2022440659556Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026Q00065452-I1Open ↗