ECB12/08/2016FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.(EXTERIOR)NOTED: AT THE TIME OF INSPECTION OBSERVED AT EXP#2 VERTICAL & HORIZONTAL STEP CRACK SPANNING FROM BASE OF THE BRICK FACADE BLDG INTO THE PARAPET W/MISSINothing owed — awaiting certificate of correction
ECB05/06/2008OCCUPANCY CONTRARY TO THAT ALLOWED BY THE BUILDING DEPT RECORDS. ILLEGAL OCCUPANCY NOTED: CELLAR IS USED IN CONJUNCTION WITH 1ST FLOOR DAY CARE (FRANCIS GRACE DAY CARE) AND TWO 2 PIECE BATHROOM. CELLAR DAY CARENothing owed — awaiting certificate of correction
ECB05/06/2008WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES FOR TWO @ PIECE BATHROOM ( 2 TOILETS & 2 SINKS) REM: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Locations of Work
No floor-level scope or drawing coverage on file for this building.