← Back
BuildNYC
Over six families without stores
Fac Joe Shelter Retrofit Ghpp
130 29TH STREET · BIN 3009833
💬 Discuss this project
1924Year Built
4Stories
C1Building Class
M1-2DZoning
11,780 sfGross Floor Area
8Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: Fac Cluster Housing Development Fund Corp Poration · 2,780 sf lot · 4.24 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSuspended scaffold for facade inspection28p · 2 filings · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 423p · 1 filing · 20 docs
Floor 325p · 1 filing · 20 docs
Floor 223p · 1 filing · 20 docs
Floor 126p · 1 filing · 20 docs
Cellar34p · 1 filing · 20 docs
Site & exteriorSidewalk shed installation6p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fifth Ave Committee2807/08/2026
NYC Department of Housing Preservation and Development703/21/2026
Fac Cluster Housing Development Fund Corp Poration103/22/2026
Joe Fac Infinity103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2024$1.4M—130 29TH STREET HOUSING DEVELOPMENT FUND CORPORATI → FAC CLUSTER HOUSING DEVELOPMENT FUND CORPORATION$115/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design211/18/2024
L. Naoum, P.E., P. C409/27/2024
Eskw/A209/25/2024
Old Structures Engineering105/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants703/21/2026
Rigid Structural Design703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MSR ConstructionScaffold407/08/2026
A.A.D. ConstructionGeneral Contractor307/08/2026
AJC Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Urban Integrations7993211/27/2024
Metric Consulting and Ins1803709/27/2024
Building Lifecycle
All (155)Filed (11)Permit Issued (11)Signed Off (3)Violation (60)Inspection (2)Objection (38)Special Inspection (30)
05/01/2026
Violation issued (HPD, closed)
A
01/29/2026
Permit issued — Mechanical Systems
B01020637-S2-MS
12/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/20/2025
Violation issued (HPD, closed)
I
10/15/2025
Permit issued — Plumbing
B01020637-S1-PL
07/30/2025
Signed off — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy
B01076733-I1
07/28/2025
Signed off — Alteration
B01076159-I1
07/24/2025
Signed off — Alteration
B01141304-I1
01/29/2025
Permit issued — Protection and Mechanical Methods
B01141304-I1-PMM
01/29/2025
Permit issued — Sidewalk Shed
B01076159-I1-SH
01/24/2025
Permit issued — Suspended Scaffold
B01076733-I1-SC
12/31/2024
Violation issued (HPD, closed)
C
12/31/2024
Violation issued (HPD, closed)
A
12/31/2024
Violation issued (HPD, closed)
C
11/27/2024
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy
B01076733-P1
11/27/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Amal Hassan Hassan
11/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
11/27/2024
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
11/18/2024
Filed — Alteration
B01141304-I1
11/18/2024
Permit issued — Protection and Mechanical Methods
B01141304-I1-PMM
10/24/2024
Permit issued — Structural
B01020637-S3-ST
10/18/2024
Permit issued — Plumbing
B01020637-S1-PL
10/07/2024
Objection resolved — Addressed
10/03/2024
Permit issued — General Construction
B01020637-I1-GC
10/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
10/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
09/27/2024
Filed — Alteration
REPLACEMENT OF AREA DRAINS AND FLOOR DRAINS. REPLACEMENT OF SUMP PUMP. ADDITION OF CHECK VALVE ON COMBINED SANITARY PIPING AND NEW TRAPS. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01020637-P3
09/27/2024
Filed — Alteration
REPLACEMENT OF AREA DRAINS AND FLOOR DRAINS. REPLACEMENT OF SUMP PUMP. ADDITION OF CHECK VALVE ON COMBINED SANITARY PIPING AND NEW TRAPS. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01020637-P2
09/25/2024
Filed — Alteration
REPLACEMENT OF AREA DRAINS AND FLOOR DRAINS. REPLACEMENT OF SUMP PUMP. ADDITION OF CHECK VALVE ON COMBINED SANITARY PIPING AND NEW TRAPS. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01020637-P1
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/25/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
09/25/2024
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
09/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/25/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
09/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
09/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
09/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
09/19/2024
Objection resolved — Addressed
09/19/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction01/29/2026
DOB NOWPlumbingSigned-offAJC Plumbing & Heating10/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR Construction01/29/2025
DOB NOWSidewalk ShedSigned-offMSR Construction01/29/2025
DOB NOWSuspended ScaffoldSigned-offMSR Construction01/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR Construction11/18/2024
DOB NOWStructuralPermit IssuedA.A.D. Construction10/24/2024
DOB NOWPlumbingSigned-offAJC Plumbing & Heating10/18/2024
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction10/03/2024
DOB NOWSuspended ScaffoldSigned-offMSR Construction08/23/2024
DOB NOWSidewalk ShedSigned-offMSR Construction07/09/2024
BISPLISSUEDArissta Mechanical HVAC04/18/2007
BISSPISSUEDCegf & G Plumbing04/18/2007
BISPLISSUEDArista Mechanical HVAC04/18/2007
BIS—ISSUEDPrisma Construction01/16/2007
BISOTISSUEDApex Construction Co12/30/1998
BISBLISSUEDBell Fuel Oil Co11/09/1994
1 project · most recent 09/27/2024
Storm Water/Sanitary
FiledStatusContractorScope
09/27/2024Signed-offAJC Plumbing & HeatingStorm, Water/Sanitary
2 projects · most recent 01/29/2025
General Wiring
FiledStatusContractorScope
01/29/2025Permit IssuedAmr Electrical ContractingGeneral Wiring
08/16/2024Permit IssuedFoster Electrical Service—
1 project · most recent 09/27/2024
Steel Masonry
FiledStatusContractorScope
09/27/2024Permit IssuedA.A.D. ConstructionSteel, Masonry
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
11/27/2024Alternative Materials - OTCR Buildings Bulletin NumberAmal Hassan Hassanspecial
11/27/2024Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
11/27/2024Post-installed AnchorsDANNY TRUJILLOspecial
10/03/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
10/03/2024Mechanical SystemsSAMI HAJJAR P.Especial
10/03/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/03/2024Heating SystemsSAMI HAJJAR P.Especial
10/03/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/03/2024FinalSAMI HAJJAR P.Eprogress
10/03/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
10/03/2024FinalSAMI HAJJAR P.Eprogress
10/03/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
10/03/2024Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
10/03/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
10/03/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
10/03/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/03/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
10/03/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
10/03/2024Post-installed AnchorsSAMI HAJJAR P.Especial
10/03/2024HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
10/03/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
09/25/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/25/2024Heating SystemsSAMI HAJJAR P.Especial
09/25/2024Mechanical SystemsSAMI HAJJAR P.Especial
09/25/2024Tenant Protection Plan Compliance—special
Latest 25 of 49.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026B01020637-P1Request digital key ↗
08/25/2026B01020637-S2Request digital key ↗
08/25/2026B01020637-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature11
10/03/2026B01020637-P1Open ↗
10/03/2026B01020637-P1Open ↗
09/01/2026B01020637-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/03/2026B01020637-P1Open ↗
09/01/2026B01020637-P3Open ↗
08/31/2026B01020637-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026B01020637-S2Open ↗
08/25/2026B01020637-P2Open ↗
08/25/2026B01020637-P3Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026B01020637-S1Open ↗
08/25/2026B01020637-P3Open ↗
08/25/2026B01020637-P2Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/25/2026B01020637-P1Open ↗
08/25/2026B01020637-S2Open ↗
08/25/2026B01020637-P3Open ↗
Showing 3 of 11 on file for this type
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/24/2026B01076733-I1Open ↗
08/13/2026B01076733-P1Open ↗
▸DOB NOWCalculations2
08/24/2026B01076733-I1Open ↗
08/13/2026B01076733-P1Open ↗