← Back
Two family converted from one family
130-30 128 STREET
QUEENS · South Ozone Park · BIN 4255384
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3-2Zoning
2,130 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSA BUILDING ENGINEERING SERVICES305/11/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOPE HOME IMPROVEMENT INCGeneral Contractor303/21/2026
RANGASAMMY VEERAPEN CONSTGeneral Contractor307/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596111/18/2020
TRIANGLE INSPECTION & TES7495111/18/2020
Building Lifecycle
All (31)Filed (3)Permit Issued (5)Signed Off (3)Inspection (7)Objection (4)Special Inspection (9)
11/28/2022
Signed off — Alteration
FILED TO LEGALIZE EXISTING CURB CUT. EXISTING CURB CUT NUMBER NOT RECORDED AT DOB.
Q00472249-I1
11/25/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/15/2022
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/13/2022
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH BIS JOB #: 440648667.
Q00516049-I1
07/13/2022
Signed off — Alteration
PROPOSE DRYWELL AND YARD DARIN AT OPEN SPACE. PROPOSE ELECTRIC HOT WATER HEATER AT CELLAR. PROPOSE 3-PIECE FIXTURE (WATER CLOSET, WASH BASIN, SHOWER), BIDET, AND KITCHEN SINK AT FIRST FLOOR.
Q00419581-I1
07/07/2022
Permit issued — Curb Cut
Q00472249-I1-CC
01/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/27/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/27/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/13/2021
Permit issued — Plumbing
Q00419581-I1-PL
09/30/2021
Permit issued — Construction Fence
Q00516049-I1-FN
08/31/2021
Permit issued — Construction Fence
Q00516049-I1-FN
05/25/2021
Permit issued — Construction Fence
Q00516049-I1-FN
05/11/2021
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH BIS JOB #: 440648667.
Q00516049-I1
05/04/2021
Special inspection requirement — Final
HANSA PERSAUD
02/18/2021
Filed — Alteration
FILED TO LEGALIZE EXISTING CURB CUT. EXISTING CURB CUT NUMBER NOT RECORDED AT DOB.
Q00472249-I1
11/23/2020
Objection raised — Admin
11/23/2020
Objection resolved — Addressed
11/23/2020
Objection raised — Scope
11/23/2020
Objection resolved — Addressed
11/18/2020
Filed — Alteration
PROPOSE DRYWELL AND YARD DARIN AT OPEN SPACE. PROPOSE ELECTRIC HOT WATER HEATER AT CELLAR. PROPOSE 3-PIECE FIXTURE (WATER CLOSET, WASH BASIN, SHOWER), BIDET, AND KITCHEN SINK AT FIRST FLOOR.
Q00419581-I1
11/18/2020
Special inspection requirement — HVAC and service water heating system controls
HANSA PERSAUD
11/18/2020
Special inspection requirement — HVAC and service water heating equipment
HANSA PERSAUD
10/27/2020
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/27/2020
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
10/27/2020
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
10/27/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
10/27/2020
Special inspection requirement — Electrical energy consumption
HANSA PERSAUD
10/27/2020
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offRANGASAMMY VEERAPEN CONST07/07/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING10/13/2021
DOB NOWConstruction FenceSigned-offRANGASAMMY VEERAPEN CONST09/30/2021
DOB NOWConstruction FenceSigned-offRANGASAMMY VEERAPEN CONST08/31/2021
DOB NOWConstruction FenceSigned-offHOPE HOME IMPROVEMENT INC05/25/2021
BIS—ISSUEDRANGASAMMY VEERAPEN CONST09/30/2021
BIS—ISSUEDRANGASAMMY VEERAPEN CONST08/19/2021
BISPLISSUEDKAMAR MECHANICAL PLG/HEATING INC10/16/2001
BIS—ISSUEDKAMAR MECHANICAL PLG/HEATING INC10/16/2001
1 project · most recent 03/15/2022
General Wiring
FiledStatusContractorScope
03/15/2022CompleteN.Z. PILGRIM ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/25/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
07/15/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
01/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/27/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/04/2021FinalHANSA PERSAUDprogress
11/18/2020HVAC and service water heating system controls HANSA PERSAUDenergy_progress
11/18/2020HVAC and service water heating equipment HANSA PERSAUDenergy_progress
10/27/2020Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/27/2020Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/27/2020Energy Code Compliance InspectionsHANSA PERSAUDprogress
10/27/2020Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/27/2020Electrical energy consumptionHANSA PERSAUDenergy_progress
10/27/2020Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026Q00419581-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/27/2026Q00516049-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00472249-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
02/07/2023440648667Open ↗
08/19/2022440648667Open ↗
08/18/2022440648667Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/19/2022440648667Open ↗
▸BISWORK PERMIT APPLICATION1
09/30/2021440648667Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
11/17/2022440648667Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/20/2023440648667Open ↗
▸BISZONING DIAGRAM1
04/26/2021440648667Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00516049-I1Open ↗
08/23/2026Q00419581-I1Open ↗
08/23/2026Q00419581-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00419581-I1Open ↗
08/27/2026Q00472249-I1Open ↗
08/27/2026Q00516049-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00419581-I1Open ↗
08/23/2026Q00419581-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/18/2020440648667Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/18/2020440648667Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/18/2020440648667Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026Q00472249-I1Open ↗
08/13/2026Q00419581-I1Open ↗
▸BISSTREET TREE CHECKLIST1
04/26/2021440648667Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/18/2020440648667Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026Q00419581-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/18/2020440648667Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
11/29/2022440648667Open ↗
▸BISFENESTRATION AIR LEAKAGE1
11/29/2022440648667Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/29/2022440648667Open ↗
▸BISINTERIOR LIGHTING POWER1
11/29/2022440648667Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/29/2022440648667Open ↗
▸BISFENESTRATION AREAS1
11/29/2022440648667Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/29/2022440648667Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/29/2022440648667Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/17/2022440648667Open ↗
▸Inspections & Test Reports10
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
11/29/2022440648667Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/29/2022440648667Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/03/2023440648667Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/29/2022440648667Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/29/2022440648667Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/29/2022440648667Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/29/2022440648667Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/29/2022440648667Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/02/2023440648667Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00419581-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
08/18/2022440648667Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/18/2020440648667Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/29/2022440648667Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
02/16/2023440648667Open ↗
02/16/2023440648667Open ↗
08/19/2022440648667Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2020440648667Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
02/16/2023440648667Open ↗
02/16/2023440648667Open ↗
02/16/2023440648667Open ↗
Showing 3 of 5 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
11/18/2020440648667Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/20/2023440648667Open ↗
▸BISPLOT DIAGRAM1
03/20/2023440648667Open ↗