← Back
Two family converted from one family
130-35 118 STREET
QUEENS · South Ozone Park · BIN 4253939
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3AZoning
1,706 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: 118 STREET LLC · 2,850 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Attic1 filing · 20 docs
Floor 28p · 2 filings · 20 docs
Floor 15p · 2 filings · 20 docs
Cellar18p · 2 filings · 20 docs
Site & exterior12p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DRM CONSTRUCTION603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/04/2018$625K—— → —$366/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC1106/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DRM CONSTRUCTION CORPGeneral Contractor407/08/2026
NOVELTY CONSTRUCTION CORPGeneral Contractor107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC15271006/12/2025
Building Lifecycle
All (112)Filed (11)Permit Issued (5)Signed Off (3)Violation (10)Inspection (7)Objection (46)Special Inspection (30)
07/24/2025
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
07/24/2025
Special inspection requirement — Subgrade Inspections
Nasir Khanzada
07/24/2025
Special inspection requirement — Protection of exposed foundation insulation
Nasir Khanzada
07/24/2025
Special inspection requirement — Interior lighting power
Nasir Khanzada
07/24/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Nasir Khanzada
07/24/2025
Special inspection requirement — Final
Nasir Khanzada
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
07/24/2025
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
07/24/2025
Special inspection requirement — Fenestration areas
Nasir Khanzada
07/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
07/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
07/24/2025
Special inspection requirement — Concrete - Cast-In-Place
Nasir Khanzada
07/24/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nasir Khanzada
07/24/2025
Special inspection requirement — Air barrier - visual inspection
Nasir Khanzada
07/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
07/24/2025
Special inspection requirement — Masonry
Nasir Khanzada
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
07/24/2025
Special inspection requirement — Footing and Foundation
Nasir Khanzada
07/24/2025
Special inspection requirement — Structural Wood Frame
Nasir Khanzada
06/12/2025
Filed — Alteration CO
MECHANICAL FILING IN CONJUNCTION WITH ALT-CO. FILING FOR CONVERSION ONE FAMILY INTO TWO FAMILY WITH REAR EXTENSION.
Q00544464-P6
05/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
05/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
05/15/2025
Special inspection requirement — Interior lighting power
Nasir Khanzada
05/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
05/15/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nasir Khanzada
05/15/2025
Special inspection requirement — Subgrade Inspections
Nasir Khanzada
05/15/2025
Special inspection requirement — Final
Nasir Khanzada
05/15/2025
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
05/15/2025
Special inspection requirement — Footing and Foundation
Nasir Khanzada
05/15/2025
Special inspection requirement — Structural Wood Frame
Nasir Khanzada
05/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
03/25/2025
Signed off — Alteration CO
MECHANICAL FILING IN CONJUNCTION WITH ALT-CO. FILING FOR CONVERSION ONE FAMILY INTO TWO FAMILY WITH REAR EXTENSION.
Q00544464-S1
03/19/2025
Filed — Alteration CO
MECHANICAL FILING IN CONJUNCTION WITH ALT-CO. FILING FOR CONVERSION ONE FAMILY INTO TWO FAMILY WITH REAR EXTENSION.
Q00544464-P5
02/28/2025
Objection resolved — Addressed
02/25/2025
Objection raised — Scope
02/19/2025
Filed — Alteration CO
MECHANICAL FILING IN CONJUNCTION WITH ALT-CO. FILING FOR CONVERSION ONE FAMILY INTO TWO FAMILY WITH REAR EXTENSION.
Q00544464-P3
01/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/10/2025
Permit issued — Mechanical Systems
Q00544464-S1-MS
11/27/2024
Objection resolved — Addressed
11/14/2024
Objection resolved — Addressed
10/08/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUCTION WITH ALT-1 OT JOB FOR APPLICATION # Q00544464-I1
Q00546204-I1
10/03/2024
Objection raised — Other
10/03/2024
Objection raised — Zoning
09/19/2024
Filed — Alteration CO
MECHANICAL FILING IN CONJUNCTION WITH ALT-CO. FILING FOR CONVERSION ONE FAMILY INTO TWO FAMILY WITH REAR EXTENSION.
Q00544464-S1
09/19/2024
Filed — Alteration CO
MECHANICAL FILING IN CONJUNCTION WITH ALT-CO. FILING FOR CONVERSION ONE FAMILY INTO TWO FAMILY WITH REAR EXTENSION.
Q00544464-P1
09/18/2024
Signed off — Alteration
APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE IN CONJUCTION WITH APPLICATION# Q00544464-I1
Q00546668-I1
08/15/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUCTION WITH ALT-1 OT JOB FOR APPLICATION # Q00544464-I1
Q00546204-P3
08/02/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUCTION WITH ALT-1 OT JOB FOR APPLICATION # Q00544464-I1
Q00546204-P2
07/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/11/2024
Permit issued — Plumbing
Q00546204-I1-PL
05/09/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/13/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/13/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/22/2022
Violation issued (ECB, closed)
Site Safety
01/22/2022
Violation issued (ECB, closed)
Construction
01/22/2022
Violation issued (ECB, closed)
Construction
01/22/2022
Violation issued (ECB, closed)
Unknown
01/22/2022
Violation issued (ECB, closed)
Construction
01/22/2022
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNOVELTY CONSTRUCTION CORP01/10/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC07/11/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT11/18/2021
DOB NOWEarth WorkPermit IssuedDRM CONSTRUCTION CORP09/20/2021
DOB NOWConstruction FenceSigned-offDRM CONSTRUCTION CORP09/15/2021
1 project · most recent 06/12/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/12/2025Signed-offNOVELTY CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Oxbox (OXBOX) J4AC3036B1000AA 36,000 BTU · Condensing Unit ×2
(OXBOX) J4AC3048B1000AA 48,000 BTU · Condensing Unit ×2
1 project · most recent 11/16/2021
General Wiring
FiledStatusContractorScope
11/16/2021CompleteSNB ELECTRICAL CONTNG CORGeneral Wiring
1 project · most recent 06/12/2025
Concrete Wood
FiledStatusContractorScope
06/12/2025Signed-offNOVELTY CONSTRUCTION CORPConcrete, Wood
1 project · most recent 06/12/2025
Earthwork
FiledStatusContractorScope
06/12/2025Signed-offNOVELTY CONSTRUCTION CORPEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/09/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
07/24/2025Energy Code Compliance InspectionsNasir Khanzadaprogress
07/24/2025Fenestration air leakageNasir Khanzadaenergy_progress
07/24/2025Interior lighting powerNasir Khanzadaenergy_progress
07/24/2025Fenestration and door U-factor and product ratingsNasir Khanzadaenergy_progress
07/24/2025Air barrier - visual inspectionNasir Khanzadaenergy_progress
07/24/2025Fenestration areasNasir Khanzadaenergy_progress
07/24/2025Protection of exposed foundation insulationNasir Khanzadaenergy_progress
07/24/2025Insulation placement and R valuesNasir Khanzadaenergy_progress
07/24/2025Footing and FoundationNasir Khanzadaprogress
07/24/2025Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
07/24/2025Excavations - Sheeting, Shoring, and BracingNasir Khanzadaspecial
07/24/2025Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
07/24/2025Subsurface Investigations (Borings/Test Pits)Nasir Khanzadaspecial
07/24/2025Concrete - Cast-In-PlaceNasir Khanzadaspecial
07/24/2025MasonryNasir Khanzadaspecial
07/24/2025Subgrade InspectionsNasir Khanzadaspecial
07/24/2025FinalNasir Khanzadaprogress
07/24/2025Structural Wood FrameNasir Khanzadaprogress
07/24/2025Fire-Resistance Rated ConstructionNasir Khanzadaprogress
05/15/2025MasonryNasir Khanzadaspecial
05/15/2025Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
05/15/2025Subgrade InspectionsNasir Khanzadaspecial
05/15/2025Subsurface Investigations (Borings/Test Pits)Nasir Khanzadaspecial
05/15/2025Energy Code Compliance InspectionsNasir Khanzadaprogress
05/15/2025FinalNasir Khanzadaprogress
Latest 25 of 112.
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026Q00544464-S1Request digital key ↗
08/27/2026Q00544464-P5Request digital key ↗
08/27/2026Q00544464-P6Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00544464-P6Open ↗
08/13/2026Q00544464-P3Open ↗
08/13/2026Q00544464-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00544464-I1Open ↗
▸Seals & Professional Certifications109
▸DOB NOWProgress Inspector Seal & Signature56
09/01/2026Q00546204-I1Open ↗
09/01/2026Q00546204-I1Open ↗
08/28/2026Q00544464-P6Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
09/01/2026Q00546204-I1Open ↗
09/01/2026Q00546204-I1Open ↗
09/01/2026Q00546204-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00544464-P6Open ↗
08/27/2026Q00544464-I1Open ↗
08/27/2026Q00544464-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00544464-P6Open ↗
08/27/2026Q00544464-S1Open ↗
08/27/2026Q00544464-P5Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00544464-I1Open ↗
08/13/2026Q00546204-I1Open ↗
▸Inspections & Test Reports11
▸DOB NOWSOIL REPORT8
08/13/2026Q00544464-P6Open ↗
08/13/2026Q00544464-P1Open ↗
08/13/2026Q00544464-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00544464-I1Open ↗
08/13/2026Q00546204-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00544464-I1Open ↗
▸Other Documents14
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00544464-I1Open ↗
08/13/2026Q00544464-P1Open ↗
08/13/2026Q00544464-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00544464-P3Open ↗
08/13/2026Q00544464-P6Open ↗
08/13/2026Q00544464-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00544464-I1Open ↗
08/13/2026Q00544464-P1Open ↗
08/13/2026Q00544464-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00544464-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00544464-I1Open ↗