← Back
One story - permanent living quarter
130-36 178 PLACE
QUEENS · BIN 4270426
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3XZoning
882 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: RELIABLE CUSTOM BUILDERS INC. · 6,000 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 2 filings · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE CUSTOM BUILDERS, INC.2007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/05/2025$1.5M—RELIABLE CUSTOM BUILDERS INC., → Private party$1,655/sf building
12/20/2024$620K—— → —$703/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES208/11/2025
TABRIZ DESIGN GROUP403/06/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE CUSTOM BUILDERS*General Contractor807/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275508/11/2025
IP CONCRETE TESTING AND I6252103/06/2025
Building Lifecycle
All (53)Filed (6)Permit Issued (5)Signed Off (5)Inspection (6)Objection (4)Special Inspection (27)
12/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/19/2025
Signed off — Alteration CO
PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO FAMILY.
Q01166680-I1
08/11/2025
Filed — Alteration CO
PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO FAMILY.
Q01166680-P1
08/11/2025
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Final
HARI SONI
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Structural Wood Frame
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
08/11/2025
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
07/31/2025
Signed off — Alteration
STRUCTURAL FRAMING AND PARTIAL DEMOLITION INCONJUNCTION WITH ALT CO APP# Q01166680-I1.
Q01173812-I1
07/31/2025
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH APP#Q01166680. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q01189800-I1
07/31/2025
Signed off — Alteration
FOUNDATION APPLICATION IN CONJUNCTION WITH ALT CO APPLICATION Q01166680-I1.
Q01173800-I1
07/07/2025
Signed off — Alteration
Q01158773-I1
06/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2025
Permit issued — Foundation
Q01166680-I1-GC-CX
06/11/2025
Objection resolved — Addressed
05/09/2025
Objection raised — Admin
04/25/2025
Objection resolved — Addressed
03/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/12/2025
Permit issued — Plumbing
Q01189800-I1-PL
03/06/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH APP#Q01166680. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q01189800-I1
02/07/2025
Objection raised — Structural
01/31/2025
Permit issued — Structural
Q01173812-I1-ST
01/31/2025
Permit issued — Foundation
Q01173800-I1-FO
01/30/2025
Filed — Alteration CO
PROPOSED VERTICAL & HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO FAMILY.
Q01166680-I1
01/30/2025
Filed — Alteration
STRUCTURAL FRAMING AND PARTIAL DEMOLITION INCONJUNCTION WITH ALT CO APP# Q01166680-I1.
Q01173812-I1
01/30/2025
Filed — Alteration
FOUNDATION APPLICATION IN CONJUNCTION WITH ALT CO APPLICATION Q01166680-I1.
Q01173800-I1
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
01/29/2025
Special inspection requirement — Final
HARI SONI
01/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
01/29/2025
Special inspection requirement — Structural Wood Frame
BAKHTIAR SHAMLOO
01/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
12/31/2024
Permit issued — Construction Fence
Q01158773-I1-FN
12/30/2024
Filed — Alteration
Q01158773-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedRELIABLE CUSTOM BUILDERS*06/12/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/12/2025
DOB NOWStructuralSigned-offRELIABLE CUSTOM BUILDERS*01/31/2025
DOB NOWFoundationSigned-offRELIABLE CUSTOM BUILDERS*01/31/2025
DOB NOWConstruction FenceSigned-offRELIABLE CUSTOM BUILDERS*12/31/2024
2 projects · most recent 02/09/2025
General Wiring
FiledStatusContractorScope
02/09/2025CompleteAYYUB ELECTRIC CORPGeneral Wiring
02/09/2025CompleteAYYUB ELECTRIC CORP—
1 project · most recent 08/11/2025
FiledStatusContractorScope
08/11/2025Permit IssuedRELIABLE CUSTOM BUILDERS*2 scope_items
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/19/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
08/11/2025MeteringBAKHTIAR SHAMLOOenergy_progress
08/11/2025Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
08/11/2025Fenestration areasBAKHTIAR SHAMLOOenergy_progress
08/11/2025Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
08/11/2025Permanent certificateBAKHTIAR SHAMLOOenergy_progress
08/11/2025Maintenance informationBAKHTIAR SHAMLOOenergy_progress
08/11/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
08/11/2025Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
08/11/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/11/2025MasonryBAKHTIAR SHAMLOOspecial
08/11/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
08/11/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
08/11/2025Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
08/11/2025FinalHARI SONIprogress
08/11/2025Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
08/11/2025Footing and FoundationBAKHTIAR SHAMLOOprogress
08/11/2025Structural Wood FrameBAKHTIAR SHAMLOOprogress
08/11/2025Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
08/11/2025Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
08/11/2025Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
08/11/2025Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
08/11/2025Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
01/29/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
01/29/2025FinalHARI SONIprogress
01/29/2025Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
Latest 25 of 27.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026Q01158773-I1Request digital key ↗
08/21/2026Q01173812-I1Request digital key ↗
08/21/2026Q01173800-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01166680-P1Open ↗
08/13/2026Q01166680-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01166680-P1Open ↗
08/13/2026Q01166680-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026Q01158773-I1Open ↗
08/21/2026Q01173812-I1Open ↗
08/21/2026Q01173800-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q01166680-P1Open ↗
09/01/2026Q01166680-P1Open ↗
09/01/2026Q01166680-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q01166680-P1Open ↗
09/01/2026Q01166680-P1Open ↗
09/01/2026Q01173812-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01166680-P1Open ↗
08/13/2026Q01166680-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q01173812-I1Open ↗
08/21/2026Q01173800-I1Open ↗
08/20/2026Q01189800-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q01166680-P1Open ↗
08/13/2026Q01173800-I1Open ↗
08/13/2026Q01166680-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01173800-I1Open ↗
08/13/2026Q01166680-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01166680-P1Open ↗
08/13/2026Q01166680-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01166680-I1Open ↗
08/13/2026Q01166680-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01166680-I1Open ↗
08/13/2026Q01166680-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026Q01166680-I1Open ↗
08/13/2026Q01166680-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01166680-I1Open ↗