← Back
Two stories - detached, small or mid-size
130 85 STREET
BROOKLYN · Bay Ridge · BIN 3153040
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2Zoning
1,638 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof1 filing · 4 docs
Attic14p · 2 filings · 20 docs
Floor 214p · 3 filings · 20 docs
Floor 116p · 3 filings · 20 docs
Cellar14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KNC CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2021$1.7M—— → —$1,047/sf building
10/26/2020$1.6M—Private party → Private party$946/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES906/25/2025
CHRIS KIM ENGINEERING PC101/14/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KNC CONSTRUCTION INCGeneral Contractor507/08/2026
SUNATION SOLAR SYSTEMSGeneral Contractor303/21/2026
K & Y PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050506/25/2025
BARUN CORP8842101/14/2025
Building Lifecycle
All (59)Filed (10)Permit Issued (5)Signed Off (4)Violation (1)Inspection (6)Objection (10)Special Inspection (23)
07/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/16/2025
Special inspection requirement — Subgrade Inspections
PAUL MARINO
07/16/2025
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
07/16/2025
Special inspection requirement — Insulation placement and R values
PAUL MARINO
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
07/16/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
07/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
07/16/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
07/08/2025
Objection raised — Admin
07/08/2025
Objection resolved — Addressed
06/25/2025
Filed — Alteration CO
Rear extension and full renovation of the existing building. Rebuild the front foyer area. Add dormers to attic as per plans.
B00700987-P3
05/01/2025
Signed off — Alteration
B01165839-I1
01/27/2025
Permit issued — Solar
B01165839-I1-SL
01/24/2025
Filed — Alteration CO
Rear extension and full renovation of the existing building. Rebuild the front foyer area. Add dormers to attic as per plans.
B00700987-P2
01/14/2025
Filed — Alteration
B01165839-I1
11/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/22/2024
Objection resolved — Addressed
10/09/2024
Objection resolved — Addressed
10/03/2024
Signed off — Alteration
REPLACE, RELOCATE, & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APPLICATIONS B00708609 & B00700987.
B00703376-I1
08/23/2024
Objection raised — Other
08/23/2024
Objection raised — Other
08/19/2024
Filed — Alteration CO
Rear extension and full renovation of the existing building. Rebuild the front foyer area. Add dormers to attic as per plans.
B00700987-P1
08/05/2024
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
06/24/2024
Signed off — Alteration
INTERIOR CLEANUP OF CELLAR, 1ST, & 2ND FLOORS TO REMOVE DAMAGED FINISHES AND NON-BEARING PARTITIONS AS PER PLANS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B00708609-I1
06/21/2024
Signed off — Alteration
B00787884-I1
07/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
07/10/2023
Filed — Alteration
REPLACE, RELOCATE, & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APPLICATIONS B00708609 & B00700987.
B00703376-P2
07/05/2023
Special inspection requirement — Fenestration areas
PAUL MARINO
07/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
07/05/2023
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
07/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
07/05/2023
Special inspection requirement — Subgrade Inspections
PAUL MARINO
07/05/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
07/05/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
07/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
07/05/2023
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
07/05/2023
Special inspection requirement — Insulation placement and R values
PAUL MARINO
04/06/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2023
Violation issued (ECB, closed)
Construction
04/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2023
Filed — Alteration
REPLACE, RELOCATE, & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APPLICATIONS B00708609 & B00700987.
B00703376-P1
02/24/2023
Permit issued — Plumbing
B00703376-I1-PL
02/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
02/15/2023
Filed — Alteration
REPLACE, RELOCATE, & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APPLICATIONS B00708609 & B00700987.
B00703376-I1
01/30/2023
Permit issued — General Construction
B00700987-I1-GC
08/15/2022
Permit issued — Construction Fence
B00787884-I1-FN
08/11/2022
Filed — Alteration
B00787884-I1
07/13/2022
Objection raised — Other
07/13/2022
Objection resolved — Addressed
05/24/2022
Permit issued — General Construction
B00708609-I1-GC
04/13/2022
Filed — Alteration
INTERIOR CLEANUP OF CELLAR, 1ST, & 2ND FLOORS TO REMOVE DAMAGED FINISHES AND NON-BEARING PARTITIONS AS PER PLANS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B00708609-I1
03/24/2022
Objection raised — Scope
03/24/2022
Objection resolved — Addressed
03/22/2022
Filed — Alteration CO
Rear extension and full renovation of the existing building. Rebuild the front foyer area. Add dormers to attic as per plans.
B00700987-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNATION SOLAR SYSTEMS01/27/2025
DOB NOWPlumbingSigned-offK & Y PLBG AND HTG INC02/24/2023
DOB NOWGeneral ConstructionPermit IssuedKNC CONSTRUCTION INC01/30/2023
DOB NOWConstruction FenceSigned-offKNC CONSTRUCTION INC08/15/2022
DOB NOWGeneral ConstructionSigned-offKNC CONSTRUCTION INC05/24/2022
2 projects · most recent 01/06/2025
General Wiring
FiledStatusContractorScope
01/06/2025CompleteGALLANT ELEC'L CONST, INC—
08/23/2023CompleteTRINCITY ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/05/2024Pass-Final Construction Permit WithdrawalPassView ↗
04/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/16/2025Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
07/16/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/16/2025Subgrade InspectionsPAUL MARINOspecial
07/16/2025Concrete - Cast-In-PlacePAUL MARINOspecial
07/16/2025Energy Code Compliance InspectionsPAUL MARINOprogress
07/16/2025Insulation placement and R valuesPAUL MARINOenergy_progress
07/16/2025HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
07/16/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
07/16/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
07/16/2025Fenestration areasPAUL MARINOenergy_progress
07/12/2023Energy Code Compliance InspectionsHany Demetryprogress
07/05/2023Fenestration areasPAUL MARINOenergy_progress
07/05/2023Energy Code Compliance InspectionsHany Demetryprogress
07/05/2023Concrete - Cast-In-PlacePAUL MARINOspecial
07/05/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/05/2023Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
07/05/2023Subgrade InspectionsPAUL MARINOspecial
07/05/2023Energy Code Compliance InspectionsPAUL MARINOprogress
07/05/2023Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
07/05/2023HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
07/05/2023Lighting in dwelling unitsPAUL MARINOenergy_progress
07/05/2023Insulation placement and R valuesPAUL MARINOenergy_progress
02/24/2023Energy Code Compliance InspectionsHany Demetryprogress
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/30/2026B00708609-I1Request digital key ↗
08/28/2026B00787884-I1Request digital key ↗
08/27/2026B00703376-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00700987-P2Open ↗
08/13/2026B00700987-I1Open ↗
08/13/2026B00700987-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B00703376-I1Open ↗
08/13/2026B00703376-P2Open ↗
08/13/2026B00703376-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00700987-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature15
09/20/2026B00700987-P1Open ↗
09/20/2026B00700987-P1Open ↗
09/20/2026B00700987-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/30/2026B00708609-I1Open ↗
08/28/2026B00787884-I1Open ↗
08/27/2026B00703376-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/20/2026B00700987-P1Open ↗
09/20/2026B00700987-P1Open ↗
09/20/2026B00700987-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/13/2026B00700987-I1Open ↗
08/13/2026B00700987-P1Open ↗
08/13/2026B00700987-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00700987-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/30/2026B00708609-I1Open ↗
08/27/2026B00703376-I1Open ↗
08/27/2026B00703376-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026B00700987-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/30/2026B00708609-I1Open ↗
08/13/2026B00700987-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01165839-I1Open ↗
▸Other Documents17
▸DOB NOWProperty Ownership Certification4
08/21/2026B00700987-P2Open ↗
08/21/2026B00700987-P3Open ↗
08/21/2026B00700987-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00700987-P3Open ↗
08/13/2026B00700987-I1Open ↗
08/13/2026B00700987-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00700987-P2Open ↗
08/13/2026B00700987-P1Open ↗
08/13/2026B00700987-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026B00700987-I1Open ↗
08/13/2026B00700987-P3Open ↗
08/13/2026B00700987-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00700987-I1Open ↗