← Back
Multi-story retail building (2+)
Bowery Savings Bank
130 BOWERY · BIN 1006952
💬 Discuss this project
1894Year Built
2Stories
K2Building Class
C6-2GZoning
—Gross Floor Area
1Units
8 Open Violations 7 unresolved · 1 paperwork only ▸
Multi-story retail building (2+) · Owner of record: 130 BOWERY IZ LLC · 2.18 FAR built · Flood zone X
Locations of Work
Plumbing
Roof4p · 1 filing · 4 docs
Floor 14p · 1 filing · 4 docs
Mezzanine4p · 1 filing · 4 docs
Cellar4p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPITALE807/08/2026
130 BOWERY IZ LLC203/22/2026
130 BOWERY AQUISITION LLC103/22/2026
GREEN POINT BANK103/22/2026
130 BOWERY1503/22/2026
BOWERY SAVINGS BANK203/22/2026
MISTRAL903/21/2026
HOME SAVINGS OF AMERICA703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KM ENGINEERING, D.P.C112/27/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABE HIMELFARBElectrical103/21/2026
ENOBRAC PLUMBING, INCPlumbing107/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing106/28/2026
Building Lifecycle
All (73)Filed (1)Permit Issued (2)Violation (58)Inspection (6)Objection (6)
05/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/15/2025
Permit issued — Plumbing
M08054508-I1-PL
08/06/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/06/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/22/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
02/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/10/2023
Permit issued — Plumbing
M08054508-I1-PL
01/03/2023
Objection raised — Mechanical
01/03/2023
Objection resolved — Addressed
01/03/2023
Objection raised — Scope
01/03/2023
Objection resolved — Addressed
01/03/2023
Objection raised — Admin
01/03/2023
Objection resolved — Addressed
12/27/2022
Filed — Alteration
ADDITION/MODIFICATION TO THE EXISTING NATURAL GAS PIPING SYSTEM. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08054508-I1
08/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/04/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/04/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/13/2017
Violation issued (ECB, open)
Unknown
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/28/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/28/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/14/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/30/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/02/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/11/2003
Violation issued (ECB, closed)
Elevators
03/21/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/12/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/18/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPIPE SOLUTIONS ADVIS INC09/15/2025
DOB NOWPlumbingPermit IssuedENOBRAC PLUMBING, INC02/10/2023
BIS—ISSUEDMONTANA ELECTIRCAL DECORATING CO06/16/2004
BISOTISSUEDFAST-TO CONSTRUCTION INC10/23/2003
BISPLISSUEDDPH PLUMBING & HTG CORP05/15/2003
BISPLISSUEDDPH PLUMBING & HTG CORP05/15/2003
BISPLISSUEDDPH PLUMBING & HTG CORP05/13/2003
BISFPISSUEDIDEAL FIRE SYSTEMS INC.12/18/2002
BISPLISSUEDDPH PLUMBING & HTG CORP12/04/2002
BISFPISSUEDIDEAL FIRE SYSTEMS CORP11/20/2002
BISMHISSUEDJAMES YU COMPANY11/07/2002
BISPLISSUEDDPH PLUMBING & HTG CORP10/25/2002
BISPLISSUEDDPH PLUMBING & HTG CORP10/11/2002
BISPLISSUEDDPH PLUMBING & HTG CORP08/14/2002
BIS—ISSUEDGOING SIGN CO.10/10/1995
BIS—ISSUEDGOING SIGN CO.09/22/1995
BIS—ISSUEDGOING SIGN CO.09/22/1995
BIS—ISSUEDGOING SIGN CO.09/20/1995
BIS—ISSUEDGOING SIGN CO.09/20/1995
BIS—ISSUEDGOING SIGN CO.09/20/1995
BIS—ISSUEDGOING SIGN CO09/20/1995
BIS—ISSUEDGOING SIGN CO09/20/1995
BIS—ISSUEDGOING SIGN CO09/18/1995
BIS—ISSUEDB & G INDUSTRIES03/23/1992
BIS—ISSUEDB & G INDUSTRIES03/23/1992
BIS—ISSUEDB & G INDUSTRIES03/23/1992
BIS—ISSUEDB & G INDUSTRIES03/23/1992
BIS—ISSUEDB & G INDUSTRIES03/23/1992
BIS—ISSUEDB & G INDUSTRIES03/23/1992
BIS—ISSUEDB & G INDUSTRIES03/23/1992
1 project · most recent 12/27/2022
Gas
FiledStatusContractorScope
12/27/2022Permit IssuedPIPE SOLUTIONS ADVIS INCGas
1 project · most recent 11/26/2018
General Wiring
FiledStatusContractorScope
11/26/2018CompleteVERDE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/22/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026M08054508-I1Request digital key ↗
▸Applications & Permits2
▸BISPLACE OF ASSEMBLY1
01/16/2018103298218Open ↗
▸DOB NOWLPC Approval/Permit1
08/13/2026M08054508-I1Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
01/05/2018103298218Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/01/2026M08054508-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026M08054508-I1Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
05/19/2017103298218Open ↗