Luxury hotel
130 East 39th Street Leasehold Condominium
130 EAST 39 STREET · Murray Hill-Kips Bay · BIN 1019161
💬 Discuss this project
1927Year Built
15Stories
H1Building Class
R10Zoning
132,716 sfGross Floor Area
199Units
LL97 CoveredRent Stabilized11 Open Violations 10 unresolved · 1 paperwork only ▸FISP: SAFE
Luxury hotel · Owner of record: 130 EAST 39 LLC · 10,887 sf lot · 12.19 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMSTAR REALTY1203/21/2026
130 EAST 39 LLC303/22/2026
COLONNADE PROPERTIES303/21/2026
PHOENIX303/21/2026
ST GILES HOTEL LLC - THE TUSCANY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/30/2022$50.0M—— → —$377/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE307/08/2024
DJLU ARCHITECT704/11/2024
RONALD KRIGSMAN P.E.P.C.108/29/2023
SRL ASSOCIATES103/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK MANAGEMENT USA CORPGeneral Contractor707/08/2026
ADD ELECTRICAL CONTRG INCElectrical403/22/2026
ELBE CONSTRUCTION LLCGeneral Contractor104/09/2026
A. HTG AND PLBG WORKS INCPlumbing107/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161007/08/2024
RONALD KRIGSMAN P.E.P.C.1583108/29/2023
FRAME DESIGN AND CONSTRUC7971103/02/2023
Building Lifecycle
All (144)Filed (12)Permit Issued (8)Signed Off (5)Facade (FISP) (16)Violation (60)Inspection (5)Objection (8)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/12/2025
Violation issued (ECB, closed)
Elevators
08/12/2025
Violation issued (ECB, closed)
Elevators
08/12/2025
Violation issued (ECB, closed)
Elevators
08/06/2025
Violation issued (ECB, closed)
Construction
08/05/2025
Violation issued (ECB, closed)
Construction
08/05/2025
Violation issued (ECB, open)
Unknown
08/05/2025
Violation issued (ECB, closed)
Construction
06/04/2025
Violation issued (HPD, closed)
A
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/26/2024
Violation issued (ECB, closed)
Elevators
11/26/2024
Violation issued (ECB, closed)
Elevators
11/22/2024
Violation issued (HPD, closed)
I
11/07/2024
Signed off — Alteration
REMOVAL OF TWO EXISTING OIL FIRED BOILERS AND BURNERS AND REPLACING THEM WITH TWO GAS FIRED HOT WATER HEATERS AND FOUR HOT WATER STORAGE TANKS . INSTALLATION OF GAS METER AND GAS PIPING .
M00918691-I1
10/30/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/27/2024
Violation issued (ECB, closed)
Elevators
08/14/2024
Violation issued (HPD, closed)
C
08/05/2024
Violation issued (ECB, closed)
Unknown
08/05/2024
Violation issued (ECB, closed)
Unknown
08/05/2024
Violation issued (ECB, closed)
Unknown
08/05/2024
Violation issued (ECB, closed)
Unknown
08/05/2024
Violation issued (ECB, closed)
Unknown
08/05/2024
Violation issued (ECB, closed)
Unknown
08/02/2024
Violation issued (ECB, open)
Elevators
08/01/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Violation issued (ECB, closed)
Construction
07/31/2024
Violation issued (ECB, closed)
Elevators
07/17/2024
Signed off — Alteration
PROPOSED SECOND FLOOR RENOVATION WITH VRF SYSTEM TO SUPPORT THIS CONSTRUCTION.
M08014314-S3
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/15/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
07/15/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
07/15/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
07/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/15/2024
Special inspection requirement — Final
FAHAD FATEH
07/15/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/15/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/08/2024
Filed — Alteration
PROPOSED SECOND FLOOR RENOVATION WITH VRF SYSTEM TO SUPPORT THIS CONSTRUCTION.
M08014314-P6
07/05/2024
Special inspection requirement — Final
FAHAD FATEH
07/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/05/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/05/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/05/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
07/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/05/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
07/05/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPARK MANAGEMENT USA CORP06/04/2024
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP11/14/2023
DOB NOWPlumbingSigned-offD.H. EAGLE PLUMBING, LLC09/07/2023
DOB NOWGeneral ConstructionSigned-offELBE CONSTRUCTION LLC08/28/2023
DOB NOWGeneral ConstructionSigned-offPARK MANAGEMENT USA CORP08/08/2023
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS03/17/2023
DOB NOWMechanical SystemsSigned-offPARK MANAGEMENT USA CORP02/10/2023
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP12/12/2022
BISEQISSUEDPHOENIX SUTTON STR INC06/20/2023
BISEQISSUEDPHOENIX SUTTON STR INC06/28/2022
BISEQISSUEDPHOENIX SUTTON STR INC07/01/2021
BISEQISSUEDPHOENIX SUTTON STR INC07/15/2020
BISEQISSUEDPHOENIX SUTTON STR INC07/03/2019
BISEQISSUEDPHOENIX SUTTON STR INC03/07/2018
BISOTISSUEDTROJAN INTERIORS INC04/03/2017
BISEQISSUEDPHOENIX SUTTON STR INC03/09/2017
BISSDISSUEDNEW YORK PLBG-HTG-COOL C04/27/2015
BISFPISSUEDRELIABLE FIRE PROT. INC11/24/2014
BISSPISSUEDRENEW PLUMBING CORP03/27/2014
BISMHISSUEDUNIQUE CONTRACING & CONST02/19/2014
BISSDISSUEDNEW YORK PLBG-HTG-COOL C04/05/2013
BISEQISSUEDSKYLINE SCAFFOLDING GROUP07/23/2012
BISOTISSUEDEDRAS GROUP CORP06/13/2012
BISOTISSUEDJOHN GALLIN & SON, INC06/04/2012
BISOTISSUEDEDRAS GROUP CORP01/19/2012
BISEQISSUEDSKYLINE SCAFFOLDING GROUP12/09/2011
BISOTISSUEDEDRAS GROUP CORP11/01/2011
BISPLISSUEDBLUEPRINT PLUMBING LLC04/08/2011
BISPLISSUEDBLUEPRINT PLUMBING LLC01/27/2010
BISFSISSUEDAGEE HEATING SVC CORP09/04/2009
BISOTISSUEDSTRUCTURE TONE, LLC06/08/2009
BISOTISSUEDSTRUCTURE TONE, LLC06/08/2009
BISPLISSUEDBLUEPRINT PLUMBING LLC06/04/2009
BISPLISSUEDBLUEPRINT PLUMBING LLC01/02/2009
BISPLISSUEDBLUEPRINT PLUMBING CORP.04/13/2006
BISOTISSUEDE. COAST RESTORATION08/09/2005
BISMHISSUEDPOWER COOLING INC01/07/2005
BISFBISSUEDHENRY W.TRAKTMAN11/04/2004
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.07/28/2004
BISPLISSUEDASHLAND PLUMBING CORP04/10/2003
+ 18 more permits on file
1 project · most recent 07/08/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2024Signed-offPARK MANAGEMENT USA CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin RXYQ288TATJU 296,000 BTU · Vrf Outdoor ×5
1 project · most recent 07/08/2024
Water/Sanitary
FiledStatusContractorScope
07/08/2024Signed-offDYNAMIC PLBG & SPRKLR CORWater/Sanitary
5 projects · most recent 12/01/2025
General Wiring
FiledStatusContractorScope
12/01/2025CompleteLENS ELECTRIC, INCGeneral Wiring
11/21/2024CompleteADD ELECTRICAL CONTRG INCGeneral Wiring
11/19/2024CompleteLENS ELECTRIC, INCGeneral Wiring
10/07/2024CompleteADD ELECTRICAL CONTRG INCGeneral Wiring
11/03/2022CompleteSTAR ELEC'L CONTRACTORS C—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
07/15/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/15/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/15/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/15/2024Shutoff dampersFAHAD FATEHenergy_progress
07/15/2024Maintenance informationFAHAD FATEHenergy_progress
07/15/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
07/15/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/15/2024FinalFAHAD FATEHprogress
07/15/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
07/15/2024Mechanical SystemsFAHAD FATEHspecial
07/05/2024FinalFAHAD FATEHprogress
07/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/05/2024Mechanical SystemsFAHAD FATEHspecial
07/05/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
07/05/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/05/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/05/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
07/05/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/05/2024Maintenance informationFAHAD FATEHenergy_progress
07/05/2024Shutoff dampersFAHAD FATEHenergy_progress
04/30/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/10/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/07/2024FinalFAHAD FATEHprogress
04/07/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/09/2024FinalFAHAD FATEHprogress
Latest 25 of 42.
▾Documents — 376 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/29/2026M00918691-I1Request digital key ↗
08/27/2026M08014314-P6Request digital key ↗
08/27/2026M08014314-S3Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits71
▸BISPLAN / WORK APPROVAL APPLICATION46
08/13/2025124055770Open ↗
03/17/2025122364155Open ↗
06/21/2024102256363Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION25
06/20/2023140612200Open ↗
06/28/2022140612200Open ↗
07/01/2021140612200Open ↗
Showing 3 of 25 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/26/2025124055770Open ↗
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
01/10/2018123176393Open ↗
12/06/2017123176393Open ↗
12/06/2017123176393Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/30/2026M08014314-P2Open ↗
09/20/2026M08014314-P4Open ↗
09/01/2026M08014314-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026M00821912-I1Open ↗
08/27/2026M08014314-S2Open ↗
08/27/2026M08014314-P6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/30/2026M08014314-P2Open ↗
09/20/2026M08014314-P4Open ↗
09/01/2026M08014314-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/25/2017123000144Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/02/2017140612200Open ↗
01/25/2017123000144Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/02/2017140612200Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/02/2017140612200Open ↗
▸Trade Schedules & Equipment23
▸BISSELF-CERT PLUMBING NOTICE5
05/08/2014121904323Open ↗
03/26/2014121101360Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
02/12/2013121101360Open ↗
Showing 1 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
07/24/2015122154569Open ↗
04/15/2015120015367Open ↗
Showing 2 of 3 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLTION OF OPEN BOILER VIOLATION - AFFIDAVIT ATTACHED1
08/22/2023102118977Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
01/21/2016122364155Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/25/2014121904323Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/06/2023102118977Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
03/06/2024102118977Open ↗
12/06/2017123176393Open ↗
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026M08014314-P6Open ↗
08/27/2026M08014314-S3Open ↗
08/27/2026M08014314-P4Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/06/2017123176393Open ↗
01/25/2017123000144Open ↗
11/17/2014122154569Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
12/06/2017123176393Open ↗
06/14/2017123000144Open ↗
01/25/2017123000144Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
06/14/2017123000144Open ↗
08/22/2016121101360Open ↗
11/17/2015121101360Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
04/10/2013121101360Open ↗
02/12/2013121101360Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/02/2017140612200Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/02/2017140612200Open ↗
▸Approvals, Objections & Sign-offs57
▸BISLETTERS - SUPPORTING DOCUMENTATION18
09/11/2025124055770Open ↗
09/11/2025124055770Open ↗
09/11/2025124055770Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
05/10/2024140612200Open ↗
05/10/2018102118977Open ↗
01/19/2018102118977Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
07/03/2012121130338Open ↗
Showing 1 of 8 on file for this type
▸BISSHED LETTER7
06/20/2023140612200Open ↗
06/28/2022140612200Open ↗
07/01/2021140612200Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
04/15/2024102118977Open ↗
01/12/2024102118977Open ↗
10/12/2023102118977Open ↗
Showing 3 of 6 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - LETTER ATTACHED1
01/29/2025102118977Open ↗
▸BISFINAL1
05/10/2024140612200Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT27
12/06/2017123176393Open ↗
06/14/2017123000144Open ↗
06/06/2017123000144Open ↗
Showing 3 of 27 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATIONS - AFFIDAVIT ATTACHED2
04/23/2025102118977Open ↗
08/22/2023102118977Open ↗
▸BISOK TO ACCEPT THE PROFESSIONAL AFFIDAVIT OF SIDEWALK PROTECTION IN LIEU OF CLOSE OF OPEN FACADE VIOLATION(S) FOR TCO1
11/03/2025102118977Open ↗
▸BISOK TO ISSUE ONE TIME TCO PENDING RESOLUTION OF OPEN FACADE VIOLATIONS - AFFIDAVIT ATTACHED1
07/07/2025102118977Open ↗
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET15
08/13/2025124055770Open ↗
12/06/2017123176393Open ↗
01/25/2017123000144Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION13
04/17/2024102118977Open ↗
01/31/2024102118977Open ↗
10/25/2023102118977Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM6
06/20/2023140612200Open ↗
06/28/2022140612200Open ↗
07/01/2021140612200Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/02/2017140612200Open ↗
Showing 1 of 2 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type