Roof6p · 3 filings · 20 docs
MechanicalPlumbing
PAA filed to include fuel piping: To connect the fuel piping from to the 6th floor to the generator on the roof
On file for this project
23 documents · 4 drawing sheets
Installation of new plumbing fixtures. No change in use, egress or occupancy.
On file for this project
36 documents · 1 drawing sheet
Installation of new mechanical equipment and ductwork. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Floor 71p · 1 filing · 12 docs
Architecture
No filed description on record for this project.
On file for this project
12 documents · 1 drawing sheet
Floor 66p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
PAA filed to include fuel piping: To connect the fuel piping from to the 6th floor to the generator on the roof
On file for this project
23 documents · 3 drawing sheets
Installation of new plumbing fixtures. No change in use, egress or occupancy.
On file for this project
36 documents · 1 drawing sheet
Installation of new sprinkler heads and removal of five existing sprinkler heads. No change in use, egress or occupancy.
On file for this project
14 documents · 2 drawing sheets
Floor 5
Floor 4
Floor 3
Floor 2Under Construction10p · 2 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing
RENOVATION OF A MAKER SPACE IN AN EXISTING SCHOOL BUILDING ON 2ND FLOOR WITH NEW MOP SINK AND ASSOCIATED BRANCH PIPING.
On file for this project
31 documents · 5 drawing sheets
Demolition of existing gas piping from existing 2nd Floor fireplace to be capped and removed. All gas piping for this appliance to be removed back to riser and capped. Riser to be abandoned and disconnected at Cellar Level.
On file for this project
5 documents · 1 drawing sheet
Floor 11p · 1 filing · 15 docs
Architecture
No filed description on record for this project.
On file for this project
15 documents · 1 drawing sheet
Cellar3p · 3 filings · 20 docs
GeneralPlumbing
Demolition of existing gas piping from existing 2nd Floor fireplace to be capped and removed. All gas piping for this appliance to be removed back to riser and capped. Riser to be abandoned and disconnected at Cellar Level.
On file for this project
5 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
8 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
15 documents · 1 drawing sheet