← Back
Two family brick
130 EAST 89 STREET
BROOKLYN · East Flatbush-Remsen Village · BIN 3104764
💬 Discuss this project
1940Year Built
2Stories
B1Building Class
R5Zoning
1,724 sfGross Floor Area
2Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family brick · 1,900 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 24p · 1 filing · 12 docs
Floor 13p · 1 filing · 12 docs
Sub-Basement3p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC ARCHITECT, PC202/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH CORNERSTONE DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLASSIC IRON WORKS INCGeneral Contractor603/21/2026
MUSSA INTERIORS INCGeneral Contractor407/08/2026
AURA PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600202/10/2022
Building Lifecycle
All (49)Filed (2)Permit Issued (5)Violation (2)Inspection (4)Objection (22)Special Inspection (14)
08/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/21/2024
Permit issued — General Construction
B00673655-I1-GC-CX
02/21/2024
Permit issued — Mechanical Systems
B00673655-I1-GC-CX
07/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/10/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/06/2023
Permit issued — Plumbing
B00673655-S1-PL
03/23/2023
Violation issued (ECB, open)
Site Safety
03/23/2023
Violation issued (ECB, open)
Construction
03/15/2023
Permit issued — Mechanical Systems
B00673655-I1-GC-CX
02/17/2023
Permit issued — Mechanical Systems
B00673655-I1-GC-CX
02/03/2023
Objection resolved — Addressed
02/03/2023
Objection resolved — Addressed
02/03/2023
Objection resolved — Addressed
02/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection resolved — Addressed
09/12/2022
Objection resolved — Addressed
09/12/2022
Objection resolved — Addressed
08/27/2022
Objection raised — Inspections
08/27/2022
Objection raised — Scope
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection resolved — Addressed
02/18/2022
Objection raised — Other
02/18/2022
Objection raised — Other
02/18/2022
Objection raised — Other
02/17/2022
Objection raised — Admin
02/17/2022
Objection raised — Mechanical
02/17/2022
Objection raised — Scope
02/17/2022
Objection raised — Fire_Protection
02/17/2022
Objection raised — Inspections
02/17/2022
Objection raised — Admin
02/10/2022
Filed — Alteration
1. REPLACE GAS RANGE ON BASEMENT AND FIRST FLOOR. NEW HWH AND BOILER ON FIRST FLOOR. 2. REPLACE KITCHEN SINK AND DISHWASHER ON FIRST FLOOR. NEW LAV AND TOILET ON FIRST FLOOR. REPLACE WASHER ADN KITCHEN SINK ON BASEMENT. NEW SHOWER, LAV AND TOILET ON
B00673655-I1
02/10/2022
Filed — Alteration
1. REPLACE GAS RANGE ON BASEMENT AND FIRST FLOOR. NEW HWH AND BOILER ON FIRST FLOOR. 2. REPLACE KITCHEN SINK AND DISHWASHER ON FIRST FLOOR. NEW LAV AND TOILET ON FIRST FLOOR. REPLACE WASHER ADN KITCHEN SINK ON BASEMENT. NEW SHOWER, LAV AND TOILET ON
B00673655-S1
02/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
02/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
Hackjong Choi
02/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
Hackjong Choi
02/10/2022
Special inspection requirement — Maintenance information
Hackjong Choi
02/03/2022
Special inspection requirement — Fenestration air leakage
Hackjong Choi
02/03/2022
Special inspection requirement — Interior lighting power
Hackjong Choi
02/03/2022
Special inspection requirement — Mechanical Systems
Hackjong Choi
02/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Hackjong Choi
02/03/2022
Special inspection requirement — Fenestration areas
Hackjong Choi
02/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
02/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
02/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
Hackjong Choi
02/03/2022
Special inspection requirement — Final
Hackjong Choi
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCLASSIC IRON WORKS INC05/21/2024
DOB NOWMechanical SystemsPermit IssuedCLASSIC IRON WORKS INC02/21/2024
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC06/06/2023
DOB NOWMechanical SystemsPermit IssuedMUSSA INTERIORS INC03/15/2023
DOB NOWMechanical SystemsPermit IssuedMUSSA INTERIORS INC02/17/2023
1 project · most recent 02/10/2022
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/10/2022Permit IssuedCLASSIC IRON WORKS INCAssociated Ducts and Piping, Heating Systems
Heating
Crown Boiler AWR105ENST2PSU 105 BTU · Boiler ×1
Ducts & Piping
Broan 670 50 CFM ×2
1 project · most recent 02/10/2022
Gas Water/Sanitary
FiledStatusContractorScope
02/10/2022Permit IssuedAURA PLUMBING INCGas, Water/Sanitary
2 projects · most recent 04/07/2024
General Wiring Lighting
FiledStatusContractorScope
04/07/2024Permit IssuedCLAIRMONT ELEC'L CONTR'GGeneral Wiring
05/01/2023Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/03/2023Fire-Resistant Penetrations and JointsHackjong Choispecial
02/10/2022Energy Code Compliance InspectionsHackjong Choiprogress
02/10/2022HVAC-R and service water heating equipmentHackjong Choienergy_progress
02/10/2022HVAC-R and service water heating system controlsHackjong Choienergy_progress
02/10/2022Maintenance informationHackjong Choienergy_progress
02/03/2022Fenestration air leakageHackjong Choienergy_progress
02/03/2022Interior lighting powerHackjong Choienergy_progress
02/03/2022Mechanical SystemsHackjong Choispecial
02/03/2022Fenestration and door U-factor and product ratingsHackjong Choienergy_progress
02/03/2022Fenestration areasHackjong Choienergy_progress
02/03/2022Fire-Resistant Penetrations and JointsHackjong Choispecial
02/03/2022Energy Code Compliance InspectionsHackjong Choiprogress
02/03/2022Fire-Resistance Rated ConstructionHackjong Choiprogress
02/03/2022FinalHackjong Choiprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026B00673655-I1Request digital key ↗
08/14/2026B00673655-S1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00673655-I1Open ↗
09/01/2026B00673655-I1Open ↗
08/23/2026B00673655-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00673655-S1Open ↗
08/13/2026B00673655-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00673655-I1Open ↗
08/23/2026B00673655-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00673655-I1Open ↗
08/13/2026B00673655-S1Open ↗