← Back
Dormitory
Alcott House
130 MAC DOUGAL STREET · Greenwich Village · BIN 1087045
💬 Discuss this project
1852Year Built
14Stories
H8Building Class
R7-2Zoning
153,348 sfGross Floor Area
140Units
LL97 CoveredRent Stabilized12 Open Violations 11 unresolved · 1 paperwork only ▸
Dormitory · Owner of record: NEW YORK UNIVERSITY · 17,351 sf lot · 8.84 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar3p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK UNIVERSITY2707/08/2026
NYU203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YAO W GUO ARCHITECT, PC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROSNA CONSTRUCTION CORPOGeneral Contractor307/08/2026
HYDROKINETIC PLBG & HTG IPlumbing307/08/2026
INTERIOR BUILDERS GROUPGeneral Contractor203/21/2026
SUPERIOR PLMBG,HTG & MECHPlumbing207/08/2026
ANESIS SERVICES CORPFire Protection107/08/2026
THOMAS FAYFire Protection103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267605/30/2024
NEW AGE ENGINEERING PLLC7746302/16/2024
Building Lifecycle
All (111)Filed (10)Permit Issued (9)Signed Off (7)Violation (60)Inspection (10)Special Inspection (15)
06/12/2026
Signed off — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-S5
02/27/2025
Signed off — Alteration
INSTALL DIRECT VENTS FOR GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00962330-S1
11/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/10/2024
Signed off — Alteration
INSTALL DIRECT VENTS FOR GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00962330-I1
09/10/2024
Signed off — Alteration
INSTALL DIRECT VENTS FOR GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00962330-S2
08/15/2024
Signed off — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-S3
08/15/2024
Signed off — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-S4
08/14/2024
Signed off — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-I1
07/29/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/10/2024
Filed — Alteration
INSTALL DIRECT VENTS FOR GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00962330-P1
06/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
06/10/2024
Special inspection requirement — Maintenance information
Stephen Shishko
06/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
05/30/2024
Filed — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-P2
05/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
05/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2024
Permit issued — Plumbing
M00941555-S4-PL
05/15/2024
Permit issued — Plumbing
M00941555-S4-PL
05/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/01/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2024
Violation issued (HPD, closed)
A
03/22/2024
Permit issued — Mechanical Systems
M00962330-S2-MS
02/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/23/2024
Filed — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-P1
02/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
02/19/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/16/2024
Filed — Alteration
INSTALL DIRECT VENTS FOR GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00962330-S2
02/16/2024
Special inspection requirement — Chimneys and vents
Stephen Shishko
02/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
02/15/2024
Permit issued — Boiler Equipment
M00962330-I1-BE
02/08/2024
Permit issued — Plumbing
M00962330-S1-PL
02/06/2024
Filed — Alteration
INSTALL DIRECT VENTS FOR GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00962330-S1
02/06/2024
Filed — Alteration
INSTALL DIRECT VENTS FOR GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00962330-I1
01/25/2024
Permit issued — Sprinklers
M00941555-S5-EW-SP
01/04/2024
Permit issued — Plumbing
M00941555-S4-PL
12/14/2023
Permit issued — Mechanical Systems
M00941555-S3-MS
12/12/2023
Permit issued — General Construction
M00941555-I1-GC
12/05/2023
Filed — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-S5
12/05/2023
Filed — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-S3
12/05/2023
Filed — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-S4
11/28/2023
Filed — Alteration
HEREWITH FILING MODIFICATION OF EXISTING EXHAUST SYSTEM AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M00941555-I1
11/15/2023
Violation issued (HPD, closed)
I
11/14/2023
Special inspection requirement — Final
Stephen Shishko
11/14/2023
Special inspection requirement — Mechanical Systems
Stephen Shishko
09/29/2023
Special inspection requirement — Mechanical Systems
Matthew Wavro
09/29/2023
Special inspection requirement — Final
Matthew Wavro
09/29/2023
Special inspection requirement — Post-installed Anchors
Matthew Wavro
09/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
09/29/2023
Special inspection requirement — Final
Matthew Wavro
03/15/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
10/09/2022
Violation issued (HPD, closed)
C
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
I
11/15/2021
Violation issued (ECB, open)
Boilers
04/01/2021
Violation issued (HPD, closed)
A
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I05/15/2024
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I05/15/2024
DOB NOWMechanical SystemsSigned-offINTERIOR BUILDERS GROUP03/22/2024
DOB NOWBoiler EquipmentSigned-offSUPERIOR PLMBG,HTG & MECH02/15/2024
DOB NOWPlumbingSigned-offSUPERIOR PLMBG,HTG & MECH02/08/2024
DOB NOWSprinklersSigned-offTHOMAS FAY01/25/2024
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I01/04/2024
DOB NOWMechanical SystemsSigned-offBROSNA CONSTRUCTION CORPO12/14/2023
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO12/12/2023
BISOTISSUEDON-PAR CONTRACTING09/14/2004
BISOTISSUEDSTANDARD WATERPROOFING C12/11/2003
BISSPISSUEDCAPITOL FIRE SPKL CO,INC10/28/1993
BISPLISSUEDPAR PLUMBING CO., INC.09/10/1993
BISMHISSUEDTHE STEGLA GROUP, INC.08/17/1993
BISOTISSUEDTHE STEGLA GROUP, INC.08/17/1993
BISOTISSUEDTHE STEGLA GROUP INC06/03/1993
BISSPISSUEDK.M.D MECHANICAL 1443 LLC05/15/1992
BISMHISSUEDADMIRAL TECHNOLOGIES INC12/10/1991
BISMHISSUEDADMIRAL TECHNOLOGIES INC12/10/1991
BISPLISSUEDK.M.D MECHANICAL 1443 LLC10/22/1991
BISOTISSUEDSTEGLA GROUP INC09/20/1991
BISOTISSUEDSTEGLA GROUP INC08/07/1991
2 projects · most recent 11/05/2024
General Wiring
FiledStatusContractorScope
11/05/2024CompleteTIKVAH ELECTRIC CO, INC.General Wiring
09/30/2022CompleteCAPUTEK ELEC'L SERVICES,—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/10/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
06/10/2024Maintenance informationStephen Shishkoenergy_progress
06/10/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
05/31/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
05/28/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
02/22/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
02/16/2024Chimneys and ventsStephen Shishkospecial
02/16/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
11/14/2023FinalStephen Shishkoprogress
11/14/2023Mechanical SystemsStephen Shishkospecial
09/29/2023Mechanical SystemsMatthew Wavrospecial
09/29/2023FinalMatthew Wavroprogress
09/29/2023Post-installed AnchorsMatthew Wavrospecial
09/29/2023Fire-Resistant Penetrations and JointsMatthew Wavrospecial
09/29/2023FinalMatthew Wavroprogress
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026M00941555-P2Request digital key ↗
08/28/2026M00941555-P1Request digital key ↗
08/28/2026M00941555-S5Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/28/2026M00962330-S2Open ↗
08/13/2026M00941555-P1Open ↗
08/13/2026M00941555-S4Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026M00941555-P2Open ↗
08/28/2026M00941555-P1Open ↗
08/28/2026M00941555-S5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/30/2026M00941555-P2Open ↗
09/02/2026M00941555-P1Open ↗
09/01/2026M00962330-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/06/2026M00962330-S1Open ↗
09/06/2026M00962330-S1Open ↗
09/06/2026M00962330-S1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026M00941555-I1Open ↗
08/28/2026M00941555-P2Open ↗
08/28/2026M00941555-P1Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/28/2026M00941555-P2Open ↗
08/28/2026M00941555-P1Open ↗
08/28/2026M00941555-S5Open ↗
Showing 3 of 10 on file for this type
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M00941555-I1Open ↗